Cited by 101Geothermal Energy Systems and ApplicationsRenewable energy and sustainable power systemsAdvanced Power Generation Technologies

The DOI matches its Crossref record.

Geothermal Electricity Generation, Challenges, Opportunities and Recommendations

Open access
Barasa Kabeyi, Moses Jeremiah·2019·International Journal of Advances in Scientific Research and Engineering

Abstract

Geothermal energy has a potential for several applications including geo-exchange, direct thermal application and power generation. Whereas the untapped capacity is over 100 GW globally, its growth realizes only 3-4% growth per year while the global share of electricity generation is less than 1%. Limitations of geothermal energy include scarcity of exploitable sites, remote locations often far from load centers and undesirable gaseous emissions. Project development faces challenges of poor funding, technology and long gestation periods of between 5 and 10 years for conventional power plants. Smooth implementation of geothermal project requires, social acceptance, through minimization of environmental effect, avoidance of adverse effects on the people and giving direct benefits to local communities. It is through both subsurface and power plant technologies that environmental challenges of geothermal power plants are addressed. Research and development into new, efficient and cost-effective technologies will enhance safety and environmental integrity with respect to geothermal energy and electricity development. A geothermal power plant project generally goes through exploration or prefeasibility stage, drilling or feasibility stage and development stage which involves development of production wells, reinjection wells, steam gathering system and power plant construction and commissioning. The last phase is power plant operation and maintenance before the plant is finally retired upon end of the generation contract or license. These phases of the cycle before generation all combined take relatively long and there is need to improve. The use of Wellhead power plants currently provide a quick access to geothermal electricity ahead of full development of a conventional power plant hence enabling quicker access to geothermal electricity. Drilling which is a critical process in geothermal resource exploration and development is expensive, and therefore development of geophysical methods to resolve this problem is highly desirable as it could significantly reduce the cost of geothermal energy development hence advanced technology in drilling and upfront activities will reduce costs and risks in development. Better technology in upfront activities will significantly reduce the high risks and costs while power plant conversion technologies and better reservoir management and engineering will increase output, resource availability and efficiency of resource exploitation. Geothermal energy resources are significant and if the technical, financial, environmental, social and logistical challenges are addressed, it can be a major player in global energy and electricity market as renewable, safe and cheap resources. Research and development of technology and solutions to current challenges should be enhanced. The study concluded that technical barriers, high financial costs and long gestation periods prevent faster development of geothermal electricity.

Overview

Integrity signals

Registry

Crossref · 10.31695/ijasre.2019.33408

Cites

Statistics

Recomputing p-values needs the paper’s full text.

Verification

Claims the paper makes

We couldn’t retrieve this paper’s full text, so its claims and self-check weren’t run. The registry and citation checks still apply.

Claims other papers make about this one

Each is checked against this paper’s own text: does it say what the citing paper says it does?

  • These will make the systems economical, cleaner, technically sustainable, and socially acceptable for wider adaptation.

    “These will make the systems economical, cleaner, technically sustainable, and socially acceptable for wider adaptation [43,134].”

Citations

Cited by

Sorted by citations

Metadata

Authors
Barasa Kabeyi, M. J.
Venue
International Journal of Advances in Scientific Research and Engineering
Published
2019
Volume
5
Issue
8
Pages
53-95
ISSN
2454-8006 (ISSN-L)
OpenAlex
W2970473795
Cited by
101
References
0
Citations by year
2026: 10 · 2025: 18 · 2024: 22 · 2023: 22 · 2022: 15 · 2021: 12 · 2020: 1 · 2019: 1
FWCI
1.54
Type
journal article
Language
en
Open access
Licence
cc-by-nc
Locations
  • International Journal of Advances in Scientific Research and Engineering (publishedVersion, cc-by-nc)
  • Zenodo (CERN European Organization for Nuclear Research) (submittedVersion, cc-by)
Topics
  • Physical Sciences › Energy › Renewable Energy, Sustainability and the Environment › Geothermal Energy Systems and Applications
  • Physical Sciences › Energy › Renewable Energy, Sustainability and the Environment › Renewable energy and sustainable power systems
  • Physical Sciences › Energy › Energy Engineering and Power Technology › Advanced Power Generation Technologies
Keywords
geothermal power generation, geothermal power plants, geothermal exploration, drilling costs, reinjection wells, reservoir management, social acceptance

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review