Student or educator? Sign up with your school email and get 6 months of Pro free.

The DOI matches its Crossref record; 23 of the 23 references it cites were found in a registry or an index; 1 of the 5 sources its claims cite were checked for support.

Implementation of a 6U CubeSat Electrical Power System Digital Twin

Open access
Casado, Pablo, Torres, Cristian, Blanes, José M., Garrigós, Ausiàs, Marroquí, David·2024·Aerospace

Abstract

This paper presents the design of a digital twin for a 6U CubeSat electrical power system, including the solar arrays, solar array regulators, battery, power distribution unit, and load subsystems.

Overview

CoChat Summary

TL;DR

This paper develops and experimentally validates a real-time digital twin for a 6U CubeSat electrical power system, including solar arrays, solar array regulators, battery, power distribution unit, and loads. The digital twin closely matches the physical system in validation tests and is used for CHIL/PHIL testing and a full low Earth orbit orbital-cycle simulation.

Key findings

  • The digital twin’s real-time outputs closely matched the physical EPS in validation tests; during an 18 W step load applied for 6 s, the SAR transitioned between MPPT and VEOC modes and experimental and DT waveforms were “almost identical.”
  • The DT was implemented on a Typhoon HIL404 real-time simulator with a simulation step as low as 500 ns; the reported loop-back latency was 1650 ns, comprising 500 ns sampling delay, 500 ns state calculation, 500 ns output calculation, and 150 ns analog output latency.
  • CHIL tests evaluated the control circuit across a solar-cell temperature range of −50 °C to +100 °C, and PHIL tests with a digital perturb-and-observe MPPT showed the SAS operating point oscillating around the MPP at approximately 15 V.
  • A complete EPS DT simulated a full orbital cycle in LEO at 793 km altitude with nadir pointing, capturing MPPT mode, VEOC mode, battery charging/discharging, and eclipse behavior.

Methods

  • The DT models four solar array sections, each an 8S1P string of CESI CTJ30 triple-junction cells characterized at AM0 1366.1 W/m² and 85 °C; the SAS uses a single-diode model with parameters extracted by the two-step linear least-squares method.
  • The SAR is modeled as a synchronous buck DC/DC converter with peak-current inner control and outer voltage loops; the battery is a 2S2P pack of four 2600 mAh Samsung Li-Ion 18650 cells, modeled with parameters fitted from a discharge curve measured at 25 °C and 520 mA (0.1 C).
  • Validation compared real-time DT outputs with experimental waveforms from the physical EPS; CHIL and PHIL tests integrated real hardware with simulated subsystems, and the complete DT used irradiance and temperature profiles computed with Radian System Software 2024 for a LEO orbital cycle.

Limitations

  • The paper states that solar-cell degradation from space radiation and thermal cycling was not considered, and that battery temperature and state of health were assumed constant over the mission.
  • The paper states that implementing the EPS CubeSat DT requires high computational power equipment and recommends averaged models for switching converters at present.
  • Evident from the text: the buck converter model assumes no conduction or switching losses and no AC switching ripple, and the PDU lines are simplified as constant power loads with fixed efficiencies (99% unregulated, 95% for 5 V, 93% for 3.3 V); no quantitative error metrics for the DT-versus-physical comparison are reported.

Model-written summary. Check it against the paper before relying on it.

Integrity signals

Registry

Crossref · 10.3390/aerospace11080688

Cites

23 of 23 references verified0 citation errors · 0 not checkable

Statistics

Nothing to recompute.

Verification

Claims the paper makes

1 Valid · 2 Not valid · 4 Not checked · 31 Own results and interpretations

11 more claims

Create a free account to see all 38 claims and every source verdict.

See all claims — free account
  • Probably not a substantial claim. 12
  • It may state two separate claims as one. 15

Create a free account to see these claims.

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

Each contradiction between two passages listed here was confirmed by an independent check.

1 of 1

Citations

Cites

Show all 23 references

Cited by

See all 13

Metadata

Authors
Casado, P., Torres, C., Blanes, J. M., Garrigós, A., & Marroquí, D.
Affiliations
  • Universitat de Miguel Hernández d'Elx (ES)
  • Space Power & Electronic System Research Group, University Miguel Hernández of Elche, 03202 Elche, Spain
Corresponding author
Casado, Pablo
Venue
Aerospace
Publisher
MDPI AG
Published
2024-08-21
Volume
11
Issue
8
Pages
688
ISSN
2226-4310 (ISSN-L)
OpenAlex
W4401890061
Cited by
13
References
23
Citations by year
2026: 5 · 2025: 8
FWCI
2.25
Type
journal article
Language
en
Open access
Locations
  • Aerospace (publishedVersion, cc-by)
  • DOAJ (DOAJ: Directory of Open Access Journals) (submittedVersion)
Funders
European Union NextGenerationEU (ASFAE/2022/21)
Topics
  • Physical Sciences › Engineering › Aerospace Engineering › Spacecraft Design and Technology
  • Physical Sciences › Engineering › Control and Systems Engineering › Real-time simulation and control systems
  • Physical Sciences › Engineering › Electrical and Electronic Engineering › Space Technology and Applications
Keywords
digital twin, CubeSat, power systems, solar arrays, batteries, power distribution unit, hardware-in-the-loop testing, real-time simulation, telemetry data, fault diagnosis

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

A language model drew the claims from the paper on 2026-10-10, under version 3 of the claim definition (model deepseek-v4.1-flash, prompt extract-v3).

A second model labelled each claim on 2026-10-10 (model jev-1.13-20260917, definition revision gold-guideline-v0.2).

Cited sources are checked with a language model’s help (gpt-6-sol).

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Implementation of a 6U CubeSat Electrical Power System Digital Twin. https://app.cochat.ai/papers/10.3390/aerospace11080688
The paper
Casado, P., Torres, C., Blanes, J. M., Garrigós, A., & Marroquí, D. (2024). Implementation of a 6U CubeSat Electrical Power System Digital Twin. Aerospace. https://doi.org/10.3390/aerospace11080688

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.