Risk Management Assessment in Oil and Gas Construction Projects Using Structural Equation Modeling (PLS-SEM)

Open access
Kassem, Mukhtar A.·2022·Gases

Abstract

Oil and gas construction projects are of great importance to support and facilitate the process of operation and production. However, these projects usually face chronic risks that lead to time overrun, cost overrun, and poor quality, affecting the projects’ success. Hence, this study focused on identifying, classifying, and modeling the risk factors that have negative effects on the success of construction projects in Yemen. The data were collected through a structured questionnaire. Statistical analysis, relative important index method, and probability impact matrix analysis were carried out to classify and rank the risk factors. The partial least squares path modeling or partial least squares structural equation modeling (PLS-PM, PLS-SEM) is a method for structural equation modeling that allows an estimation of complex cause–effect relationships in path models with latent variables. PLS-SEM was employed to analyze data collected from a questionnaire survey of 314 participants comprising the clients, contractors, and consultants working in oil and gas construction projects. The results showed that the goodness of fit index of the model is 0.638. The developed model was deemed to fit because the analysis result of the coefficient of determination test (R2) of the model was 0.720, which indicates the significant explanation of the developed model for the relationship between the causes of risks and their effects on the success of projects. The most impacted internal risk categories include project management, feasibility study design, and resource material availability. The main external risk elements include political, economic, and security considerations. The created risk factor model explained the influence of risk factors on the success of construction projects effectively, according to statistical and expert validation tests.

Overview

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.3390/gases2020003

Cites

1 of 1 references verified0 citation errors · 0 not checkable

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cites

Flagged first, then by citations

Research works printed but not linked: 93

  1. 2015, Identification and assessment of risk factors affecting construction projects, HBRC J., 13, 202
  2. Dziadosz, 2015, Risk analysis in construction project—Chosen methods, Procedia Eng., 122, 258, 10.1016/j.proeng.2015.10.034 · DOI
  3. Thuyet, 2007, Risk management in oil and gas construction projects in Vietnam, Int. J. Energy Sect. Manag., 1, 175, 10.1108/17506220710761582 · DOI
  4. Nosair, 2014, Risk assessment and analysis for the construction of off shore oil & gas projects, Int. J. Sci. Res., 2, 317
  5. Sweis, 2019, Causes of delay in Iranian oil and gas projects: A root cause analysis, Int. J. Energy Sect. Manag., 13, 630, 10.1108/IJESM-04-2018-0014 · DOI
  6. Kamalirad, S., Kermanshachi, S., Shane, J., and Anderson, S. (June, January 31). Assessment of construction projects’ impact on internal communication of primary stakeholders in complex projects. Proceedings of the 6th CSCE/CRC International Construction Specialty Conference, Vancouver, BC, Canada.
  7. Doloi, 2012, Understanding impacts of time and cost related construction risks on operational performance of PPP projects, Int. J. Strateg. Prop. Manag., 16, 316, 10.3846/1648715X.2012.688774 · DOI
  8. Sultan, B., and Kajewski, S. (2003, January 19–21). The Yemen construction industry: Readying the industry for the successful implementation of sustainability. Proceedings of the International Conference on Smart and Sustainable Built Environment, Brisbane, QL, Australia. Available online: http://eprints.qut.edu.au/164/1/Kajewski_SASSBE.pdf.
  9. Mubin, 2008, Risk analysis for construction and operation of gas pipeline projects in Pakistan, Pak. J. Eng. Appl. Sci., 2, 22
  10. Hair, 2012, Partial least squares: The better approach to structural equation modeling?, Long Range Plann., 45, 312, 10.1016/j.lrp.2012.09.011 · DOI · Paper page
  11. Hair, 2011, PLS-SEM: Indeed a silver bullet, J. Mark. Theory Pract., 19, 139, 10.2753/MTP1069-6679190202 · DOI · Paper page
  12. Sarstedt, M., Ringle, C.M., and Hair, J.F. (2017). Partial Least Squares Structural Equation Modeling, Springer. · DOI · Paper page
  13. Dijkstra, 2015, Research essay consistent partial least squares path modeling, MIS Q., 39, 297, 10.25300/MISQ/2015/39.2.02 · DOI · Paper page
  14. Jun, 2011, The effects of project uncertainty and risk management on IS development project performance: A vendor perspective, Int. J. Proj. Manag., 29, 923, 10.1016/j.ijproman.2010.11.002 · DOI
  15. Memon, 2013, Using structural equation modelling to assess effects of construction resource related factors on cost overrun, World Appl. Sci. J., 21, 6
  16. Pham, 2014, Schedule delays in engineering, procurement, and construction petrochemical projects in Vietnam: A qualitative research study, Int. J. Energy Sect. Manag., 8, 3, 10.1108/IJESM-06-2013-0009 · DOI
  17. Sultan, 2017, Priorities for sustainable construction industry development in Yemen, Int. J. Appl. Eng. Res., 12, 886
  18. Ahmed, 2016, The effect of risk allocation on minimizing disputes in construction projects in Egypt, Int. J. Eng. Res. Technol., 5, 523
  19. Banaitiene, N., Banaitis, A., Banaitene, N., and Banaitis, A. (2012). Risk Management in Construction Projects, IntechOpen. · DOI
  20. Zadeh, 2016, An index to assess project management competencies in managing design changes, Int. J. Constr. Eng. Manag., 5, 11
  21. Muya, 2008, Risk identification on community-based construction projects in Zambia, J. Eng. Des. Technol., 6, 145
  22. Akadiri, O.P. (2011). Development of a Multi-Criteria Approach for the Selection of Sustainable Materials for Building Projects. [Ph.D. Thesis, University of Wolverhampton]. Available online: http://wlv.openrepository.com/wlv/bitstream/2436/129918/1/Akadiri_PhD%20thesis.pdf.
  23. Chien, L., Chiu, S., Tseng, W., and Chen, K. (July, January 30). Risk assessment of offshore wind-farm construction. Proceedings of the The 23rd International Offshore and Polar Engineering Conference, Anchorage, AK, USA.
  24. Issa, 2015, A risk allocation model for construction projects in Yemen, Civ. Environ. Res., 7, 78
  25. Lam, 2007, Modelling risk allocation decision in construction contracts, Int. J. Proj. Manag., 25, 485, 10.1016/j.ijproman.2006.11.005 · DOI
  26. Dey, 2012, Project risk management using multiple criteria decision-making technique and decision tree analysis: A case study of Indian oil refinery, Prod. Plan. Control., 23, 903, 10.1080/09537287.2011.586379 · DOI
  27. Sharma, 2014, Cost overrun factors and project cost risk assessment in construction industry—A state of the art review, Int. J. Civ. Eng., 3, 139
  28. Nasirzadeh, 2014, Dynamic modeling of the quantitative risk allocation in construction projects, Int. J. Proj. Manag., 32, 442, 10.1016/j.ijproman.2013.06.002 · DOI
  29. Cagliano, 2015, Choosing project risk management techniques, A theoretical framework J. Risk Res., 18, 232, 10.1080/13669877.2014.896398 · DOI
  30. Abdelgawad, 2010, Risk management in the construction industry using combined fuzzy FMEA and fuzzy AHP, J. Constr. Eng. Manag., 136, 1028, 10.1061/(ASCE)CO.1943-7862.0000210 · DOI
  31. Aven, 2009, Perspectives on risk in a decision-making context—Review and discussion, Saf. Sci., 47, 798, 10.1016/j.ssci.2008.10.008 · DOI
  32. Rodhi, N.N., Anwar, N., and Wiguna, I.P.A. (2017, January 9–10). A review on disaster risk mitigation in the oil and gas project. Proceedings of the IOP Conference Series: Earth and Environmental Science, the 4th International Seminar on Sustainable Urban Development, Jakarta, Indonesia.
  33. Chaher, 2016, Facilitate risk management in construction process by using hierarchical risk breakdown structure, Int. J. Sci. Res. Publ., 6, 703
  34. Choudhry, 2014, Cost and schedule risk analysis of bridge construction in Pakistan: Establishing risk guidelines, J. Constr. Eng. Manag., 140, 04014020, 10.1061/(ASCE)CO.1943-7862.0000857 · DOI
  35. Tah, 2000, Information modelling for a construction project risk management system, Eng. Constr. Archit. Manag., 7, 107, 10.1108/eb021136 · DOI
  36. Yildiz, 2014, A knowledge-based risk mapping tool for cost estimation of international construction projects, Autom. Constr., 43, 144, 10.1016/j.autcon.2014.03.010 · DOI
  37. Kassem, 2019, Using probability impact matrix (PIM) in analyzing risk factors affecting the success of oil and gas construction projects in Yemen, Int. J. Energy Sect. Manag., 14, 527, 10.1108/IJESM-03-2019-0011 · DOI
  38. Gamil, 2018, Assessment of critical factors contributing to construction failure in Yemen, Int. J. Constr. Manag., 20, 429
  39. Kassem, 2020, Using relative importance index method for developing risk map in oil and gas construction projects, J. Kejuruter., 32, 85
  40. Forteza, 2017, Effects of organizational complexity and resources on construction site risk, J. Safety Res., 62, 185, 10.1016/j.jsr.2017.06.015 · DOI
  41. Salleh, J. (2009). Critical Success Factors of Project Management for Brunei Construction Projects: Improving Project Performance. [Ph.D. Thesis, Queensland University of Technology].
  42. Chandra, 2015, Structural equation model for investigating risk factors affecting project success in Surabaya, Procedia Eng., 125, 53, 10.1016/j.proeng.2015.11.009 · DOI
  43. Falamarzi, 2019, A review on existing sensors and devices for inspecting railway infrastructure, J. Kejuruter., 31, 1, 10.17576/jkukm-2019-31(1)-01 · DOI
  44. Samarah, 2016, Causes and effects of delay in public construction projects in Jordan, Am. J. Eng. Res., 5, 87
  45. Sambasivan, 2007, Causes and effects of delays in Malaysian construction industry, Int. J. Proj. Manag., 25, 517, 10.1016/j.ijproman.2006.11.007 · DOI
  46. Kassem, 2020, Structural modelling of internal risk factors for oil and gas construction projects, Int. J. Energy Sect. Manag., 14, 975, 10.1108/IJESM-11-2019-0022 · DOI
  47. Kassem, 2020, Theoretical review on critical risk factors in oil and gas construction projects in Yemen, Eng. Constr. Archit. Manag., 28, 934, 10.1108/ECAM-03-2019-0123 · DOI
  48. Njogu, P.M. (2015). Assessment of Effects of Construction Risks on Project Delivery among Contractors in Kenya. [Ph.D. Thesis, Jomo Kenyatta University of Agriculture and Technology]. Available online: http://ir.jkuat.ac.ke/bitstream/handle/123456789/1798/Peter%20MSc%202015.pdf?sequence=1&isAllowed=y.
  49. Graves, 2000, Qualitative risk assessment, Proj. Manag. Inst., 14, 61
  50. Mander, 2007, Incremental dynamic analysis applied to seismic financial risk assessment of bridges, Eng. Struct., 29, 2662, 10.1016/j.engstruct.2006.12.015 · DOI
  51. Hair, 2019, When to use and how to report the results of PLS-SEM, Eur. Bus. Rev., 31, 2, 10.1108/EBR-11-2018-0203 · DOI · Paper page
  52. Hair, J.F.J., Hult, G.T.M., Ringle, C., and Sarstedt, M. (2014). A Primer on Partial Least Squares Structural Equation Modeling (PLS-SEM), Elsevier.
  53. Sarstedt, 2017, Partial least squares structural equation modelling, Handb. Mark. Res., 26, 1
  54. Zhao, 2018, Risk paths in BIM adoption: Empirical study of China, Eng. Constr. Archit. Manag., 25, 1170, 10.1108/ECAM-08-2017-0169 · DOI
  55. Kloppers, C., and Hirst, R. (2010, January 4). Conducting labour risk audits and implementing a labour risk management programme in order to create and maintain labour stability. Proceedings of the Middle East Health, Safety, Security, and Environment Conference and Exhibition, Manama, Bahrain. · DOI
  56. Rahman, 2013, Modeling causes of cost overrun in large construction projects with partial least square SEM approach constructions perspective, Res. J. Appl. Sci. Eng. Technol., 5, 1963, 10.19026/rjaset.5.4736 · DOI
  57. Randhawa, 2017, The moderating effect of project risk mitigation strategies on the relationship between delay factors and construction project performance, J. Sci. Technol. Policy Manag., 21, 191
  58. Kassem, 2020, Assessment of the effect of external risk factors on the success of an oil and gas construction project, Eng. Constr. Archit. Manag., 27, 2767, 10.1108/ECAM-10-2019-0573 · DOI
  59. Kim, 2016, A sample size calculator for SMART pilot studies, SIAM Undergrad. Res. Online, 9, 229, 10.1137/15S014058 · DOI
  60. Sekaran, U., and Bougie, R. (2019, February 14). Research Methods for Business: A Skill-Building Approach. Available online: https://books.google.com.my/books?hl=en&lr=&id=Ko6bCgAAQBAJ&oi=fnd&pg=PA19&dq=Sekaran,+U.,+%26+Bougie,+R.+(2010).+Research+Methods+for+Business:+A+Skill+Building+Approach.+London:+Wiley.&ots=2B2LT4LZmL&sig=Ag9yzsNyyO2IMHXG1su5pfbY5eM&redir_esc=y#v=onepage.
  61. Xiong, 2014, Examining the influence of participant performance factors on contractor satisfaction: A structural equation model, Int. J. Proj. Manag., 32, 482, 10.1016/j.ijproman.2013.06.003 · DOI
  62. Famiyeh, 2017, Major causes of construction time and cost overruns: A case of selected educational sector projects in Ghana, J. Eng. Des. Technol., 15, 181
  63. Kassem, 2019, Evaluation of risk factors affecting on oil and gas construction projects in Yemen, Int. J. Eng. Technol., 8, 6, 10.14419/ijet.v8i1.2.24864 · DOI
  64. Deng, 2018, Identifying micro variables contributing to political risks in international construction projects, Eng. Constr. Archit. Manag., 25, 317, 10.1108/ECAM-02-2017-0042 · DOI
  65. Hulland, 1999, Use of partial least squares (PLS) in strategic management research: A review of four recent studies, Strateg. Manag. J., 20, 195, 10.1002/(SICI)1097-0266(199902)20:2<195::AID-SMJ13>3.0.CO;2-7 · DOI · Paper page
  66. Kock, 2016, Hypothesis testing with confidence intervals and P values in PLS-SEM, Int. J. E-Collab., 12, 1
  67. Henseler, 2009, The use of partial least squares path modeling in international marketing, Adv. Int. Mark., 20, 277
  68. Hussain, S., Fangwei, Z., Siddiqi, A.F., Ali, Z., and Shabbir, M.S. (2018). Structural equation model for evaluating factors affecting quality of social infrastructure projects. Sustainability, 10. · DOI
  69. Henseler, 2013, Goodness-of-fit indices for partial least squares path modeling, Comput. Stat., 28, 565, 10.1007/s00180-012-0317-1 · DOI
  70. Kassem, 2018, Evaluation of risk factors affecting time and cost of construction projects in Yemen, Int. J. Eng. Technol., 8, 168
  71. Jarkas, 2015, Major construction risk factors considered by general contractors in Qatar, Eur. J. Mark., 24, 41
  72. Antah, F.H., Khoiry, M.A., Nizam, K., Maulud, A., and Abdullah, A. (2021). Perceived usefulness of airborne LiDAR technology in road design and management: A review. Sustainability, 13. · DOI
  73. Dosumu, 2017, Causes of errors in construction contract documents in southwestern Nigeria, J. Constr. Bus. Manag., 1, 11
  74. Li, 2018, Evaluating the risk of natural gas pipeline operation management in intuitionistic fuzzy linguistic environments, Math. Probl. Eng., 2018, 1
  75. Kassem, 2019, Risk factors in oil and gas construction projects in developing countries: A case study, Int. J. Energy Sect. Manag., 13, 846, 10.1108/IJESM-11-2018-0002 · DOI
  76. Luo, 2010, Assessment of fiscal terms of international petroleum contracts, Pet. Explor. Dev., 37, 756, 10.1016/S1876-3804(11)60009-8 · DOI
  77. Ali, K.N., Alhajlah, H.H., and Kassem, M.A. (2022). Collaboration and Risk in Building Information Modelling (BIM): A Systematic Literature Review. Buildings, 12. · DOI
  78. Ofori, 2016, Construction in developing countries, Constr. Manag. Econ., 25, 1, 10.1080/01446190601114134 · DOI
  79. Rahman, 2021, Factors influencing the quality of Environmental Impact Assessment Report in Malaysia, Malays. J. Soc. Space, 1, 155
  80. Goetz, E., and Shenoi, S. (2008). Reducing Risk in Oil and Gas Production Operations. Critical Infrastructure Protection, Springer. ICCIP 2007. IFIP International Federation for Information Processing. · DOI
  81. Li, X., Wang, C., Kassem, M.A., Alhajlah, H.H., and Bimenyimana, S. (2022). Evaluation Method for Quality Risks of Safety in Prefabricated Building Construction Using SEM–SDM Approach. Int. J. Environ. Res. Public Health, 19. · DOI
  82. Hirst, 2010, Undertaking a $4Bn dollar LNG project in a high risk security context and achieving exemplary safety performance, Soc. Pet. Eng. SPE Int. Conf. Heal. Saf. Environ. Oil Gas Explor. Prod., 1, 669
  83. Baghdadi, 2015, Saudi Arabian aviation construction projects: Identification of risks and their consequences, Procedia Eng., 123, 32, 10.1016/j.proeng.2015.10.054 · DOI
  84. Ali, Z., Zhu, F., and Hussain, S. (2018). Identification and assessment of uncertainty factors that influence the transaction cost in public sector construction projects in Pakistan. Buildings, 8. · DOI
  85. Myakenkaya, 2014, Similarities and differences of the war and projects. Winning strategies, Procedia Soc. Behav. Sci., 119, 314, 10.1016/j.sbspro.2014.03.036 · DOI
  86. Sultan, 2018, Political instability and the informal construction sector in, Int. J. Civ. Eng. Technol., 9, 1228
  87. Alaghbari, 2017, Factors affecting construction labour productivity in Yemen, Int. J. Constr. Manag., 3599, 1
  88. Ahmad, 2013, Evaluation of risk factors affecting time and cost of construction projects in Yemen, Int. J. Manag., 4, 168
  89. Derakhshanalavijeh, 2017, Cost overrun in construction projects in developing countries, gas-oil industry of Iran as a case study, J. Civ. Eng. Manag., 23, 125, 10.3846/13923730.2014.992467 · DOI
  90. Algahtany, 2016, Introducing a new risk management model to the Saudi Arabian construction industry, Procedia Eng., 145, 940, 10.1016/j.proeng.2016.04.122 · DOI
  91. Siang, 2012, Implemention of risk management in the Malaysian construction industry, J. Surv. Constr. Prop., 3, 15
  92. Iacob, 2014, Risk management and evaluation and qualitative method within, Ecoforum J., 3, 10
  93. Assaf, 2006, Causes of delay in construction, J. Proj. Manag., 24, 349

Metadata

Authors
Kassem, M. A.
Affiliations
University of Technology Malaysia (MY)
Corresponding author
Kassem, Mukhtar A.
Venue
Gases
Publisher
MDPI AG
Published
2022-05-09
Volume
2
Issue
2
Pages
33-60
ISSN
2673-5628 (ISSN-L)
OpenAlex
W4229459718
Cited by
36
References
1
Citations by year
2026: 11 · 2025: 6 · 2024: 6 · 2023: 11 · 2022: 2
FWCI
3.31
Type
journal article
Language
en
Open access
Locations
  • Gases (publishedVersion, cc-by)
  • DOAJ (DOAJ: Directory of Open Access Journals) (submittedVersion, cc-by-sa)
Funders
Universiti Teknologi Malaysia (UTM) Research Grant Vot (J130000.7113.05E79)
Topics
  • Social Sciences › Decision Sciences › Management Science and Operations Research › Construction Project Management and Performance
  • Social Sciences › Economics, Econometrics and Finance › Finance › Capital Investment and Risk Analysis
  • Physical Sciences › Engineering › Building and Construction › BIM and Construction Integration
Keywords
risk management, construction project success, risk factors, project management, political risk, economic risk, security risks, Yemen

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review