A New Decision-Making Approach Based on Fermatean Fuzzy Sets and WASPAS for Green Construction Supplier Evaluation
Open accessThe DOI matches its Crossref record; 62 of the 62 references it cites were found in a registry or an index.
Abstract
The construction industry is an important industry because of its effects on different aspects of human life experiences and circumstances. Environmental concerns have been considered in designing and planning processes of construction supply chains in the recent past. One of the most crucial problems in managing supply chains is the process of evaluation and selection of green suppliers. This process can be categorized as a multi-criteria decision-making (MCDM) problem. The aim of this study is to propose a novel and efficient methodology for evaluation of green construction suppliers with uncertain information. The framework of the proposed methodology is based on weighted aggregated sum product assessment (WASPAS) and the simple multi-attribute rating technique (SMART), and Fermatean fuzzy sets (FFSs) are used to deal with uncertainty of information. The methodology was applied to a green supplier evaluation and selection in the construction industry. Fifteen suppliers were chosen to be evaluated with respect to seven criteria including “estimated cost”, “delivery efficiency”, “product flexibility”, “reputation and management level”, “eco-design”, and “green image pollution”. Sensitivity and comparative analyses were also conducted to assess the efficiency and validity of the proposed methodology. The analyses showed that the results of the proposed methodology were stable and also congruent with those of some existing methods.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
1 retracted
RETRACTED: Stochastic EDAS method for multi-criteria decision-making with normally distributed data
Keshavarz Ghorabaee, M., Amiri, M., Zavadskas, E. K., Turskis, Z., & Antucheviciene, J. (2017) · Journal of Intelligent & Fuzzy Systems · doi:10.3233/jifs-17184 · Cited by 142 · cited 1×
“The criteria weights for sensitivity analysis [87].”
Self-citationRetractedGreen supply-chain management: a state-of-the-art literature review
Srivastava, S. K. (2007) · International Journal of Management Reviews · doi:10.1111/j.1468-2370.2007.00202.x · Cited by 3,984
Supply Chain Management: Implementation Issues and Research Opportunities
Lambert, D. M., Cooper, M. C., & Pagh, J. D. (1998) · The International Journal of Logistics Management · doi:10.1108/09574099810805807 · Cited by 2,435
An organizational theoretic review of green supply chain management literature
Sarkis, J., Zhu, Q., & Lai, K.-H. (2011) · International Journal of Production Economics · doi:10.1016/j.ijpe.2010.11.010 · Cited by 2,267
Green supply chain management: A review and bibliometric analysis
Fahimnia, B., Sarkis, J., & Davarzani, H. (2015) · International Journal of Production Economics · doi:10.1016/j.ijpe.2015.01.003 · Cited by 2,131
Boran, F. E., Genç, S., Kurt, M., & Akay, D. (2009) · Expert Systems with Applications · doi:10.1016/j.eswa.2009.03.039 · Cited by 1,500
Performance measurement for green supply chain management
Hervani, A. A., Helms, M. M., & Sarkis, J. (2005) · Benchmarking: An International Journal · doi:10.1108/14635770510609015 · Cited by 1,473
Ghodsypour, S. H., & O'Brien, C. (1998) · International Journal of Production Economics · doi:10.1016/s0925-5273(97)00009-1 · Cited by 1,356
Optimization of Weighted Aggregated Sum Product Assessment
Zavadskas, E. K., Turskis, Z., Antucheviciene, J., & Zakarevicius, A. (2012) · Elektronika ir Elektrotechnika · doi:10.5755/j01.eee.122.6.1810 · Cited by 1,256 · cited 1×
“This method is a combination of two popular MCDM methods: weighted sum model (WSM), and weighted product model (WPM) [77].”
MethodSelf-citationGovindan, K., Rajendran, S., Sarkis, J., & Murugesan, P. (2015) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2013.06.046 · Cited by 1,183 · cited 1×
“Since the evaluation and selection of suppliers usually involves several criteria and alternatives, most of these studies have used multi-criteria decision-making (MCDM) methods or developed them to deal with the problem [26,27].”
BackgroundSenapati, T., & Yager, R. R. (2020) · Journal of Ambient Intelligence and Humanized Computing · doi:10.1007/s12652-019-01377-0 · Cited by 1,060 · cited 1×
“Senapati and Yager [30] proposed Fermatean fuzzy sets as a tool for handling uncertain information more easily.”
BackgroundGovindan, K., Khodaverdi, R., & Jafarian, A. (2013) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2012.04.014 · Cited by 1,040
A literature review on green supply chain management: Trends and future challenges
Tseng, M.-L., Islam, M. S., Karia, N., Fauzi, F. A., & Afrin, S. (2019) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2018.10.009 · Cited by 820
Review of application of analytic hierarchy process (AHP) in construction
Darko, A., Chan, A. P. C., Ameyaw, E. E., Owusu, E. K., Pärn, E., & Edwards, D. J. (2019) · International Journal of Construction Management · doi:10.1080/15623599.2018.1452098 · Cited by 721
Project management knowledge and skills for green construction: Overcoming challenges
Hwang, B.-G., & Ng, W. J. (2013) · International Journal of Project Management · doi:10.1016/j.ijproman.2012.05.004 · Cited by 519
Senapati, T., & Yager, R. R. (2019) · Engineering Applications of Artificial Intelligence · doi:10.1016/j.engappai.2019.05.012 · Cited by 451 · cited 2×
“operator is defined based on the following equation [31]:”
BackgroundMethodMardani, A., Nilashi, M., Zakuan, N., Loganathan, N., Soheilirad, S., Saman, M. Z. M., & Ibrahim, O. (2017) · Applied Soft Computing · doi:10.1016/j.asoc.2017.03.045 · Cited by 408 · cited 1×
“In other words, we have chosen this method in the current study because the effectiveness of the WASPAS method has been demonstrated in many studies [28,29].”
Methodde Oliveira, U. R., Espindola, L. S., da Silva, I. R., da Silva, I. N., & Rocha, H. M. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.03.083 · Cited by 341
Senapati, T., & Yager, R. R. (2019) · Informatica · doi:10.15388/informatica.2019.211 · Cited by 327
Supply strategy and network effects — purchasing behaviour in the construction industry
Dubois, A., & Gadde, L.-E. (2000) · European Journal of Purchasing & Supply Management · doi:10.1016/s0969-7012(00)00016-2 · Cited by 313 · cited 1×
“Therefore, the construction industry is highly dependent on contracts with suppliers, and selecting appropriate suppliers for construction companies could be a vital concern [23].”
BackgroundWang, L., Zhang, H.-Y., Wang, J.-Q., & Li, L. (2018) · Applied Soft Computing · doi:10.1016/j.asoc.2017.12.014 · Cited by 268 · cited 2×
“[43] proposed a new approach based on a combination of picture fuzzy normalized projection (PFNP) and vlsekriterijumska optimizacija i kompromisno resenje (VIKOR) methods and used the proposed approach to identify and prioritize risk factors in construction projects.”
MethodSupply chains in the construction industry
Segerstedt, A., & Olofsson, T. (2010) · Supply Chain Management: An International Journal · doi:10.1108/13598541011068260 · Cited by 223
Sustainable Decision-Making in Civil Engineering, Construction and Building Technology
Zavadskas, E., Antucheviciene, J., Vilutiene, T., & Adeli, H. (2017) · Sustainability · doi:10.3390/su10010014 · Cited by 216
Self-citationAn integrated fuzzy MCDM approach for supplier evaluation and selection
Karsak, E. E., & Dursun, M. (2015) · Computers & Industrial Engineering · doi:10.1016/j.cie.2015.01.019 · Cited by 200
Green supply chain performance measures: A review and bibliometric analysis
Mishra, D., Gunasekaran, A., Papadopoulos, T., & Hazen, B. (2017) · Sustainable Production and Consumption · doi:10.1016/j.spc.2017.01.003 · Cited by 197
Supplier evaluation and selection in fuzzy environments: a review of MADM approaches
Keshavarz-Ghorabaee, M., Amiri, M., Zavadskas, E. K., & Antuchevičienė, J. (2017) · Economic Research-Ekonomska Istraživanja · doi:10.1080/1331677x.2017.1314828 · Cited by 193 · cited 1×
“Since the evaluation and selection of suppliers usually involves several criteria and alternatives, most of these studies have used multi-criteria decision-making (MCDM) methods or developed them to deal with the problem [26,27].”
BackgroundSelf-citationBottani, E., & Rizzi, A. (2007) · International Journal of Production Economics · doi:10.1016/j.ijpe.2007.03.012 · Cited by 181
Early Stage Design Decisions: The Way to Achieve Sustainable Buildings at Lower Costs
Bragança, L., Vieira, S. M., & Andrade, J. B. (2014) · The Scientific World JOURNAL · doi:10.1155/2014/365364 · Cited by 174 · cited 1×
“Moreover, the construction industry can indirectly affect other industries and underline the development of social activities and quality of life [1].”
BackgroundSarkar, B., Tayyab, M., Kim, N., & Habib, M. S. (2019) · Computers & Industrial Engineering · doi:10.1016/j.cie.2019.05.035 · Cited by 169 · cited 1×
“It should be noted that carbon emissions is an important criterion that usually is considered for green supplier evaluation processes [85].”
BackgroundSustainable Supply Chains: Models, Methods, and Public Policy Implications
(2012) · International Series in Operations Research & Management Science · doi:10.1007/978-1-4419-6105-1 · Cited by 162
Erdogan, S. A., Šaparauskas, J., & Turskis, Z. (2019) · Sustainability · doi:10.3390/su11082239 · Cited by 145 · cited 2×
“A comprehensive set of decision criteria for construction management was identified and used in a case study in Turkey [57].”
BackgroundMethodDehdasht, G., Ferwati, M. S., Zin, R. M., & Abidin, N. Z. (2020) · PLoS ONE · doi:10.1371/journal.pone.0228746 · Cited by 137 · cited 2×
“[71] proposed a hybrid approach including entropy and TOPSIS methods in order to select key success factors and sustainable drivers in the implementation of the lean construction industry.”
MethodWalters, S. J. (2009) · Wiley eBooks · doi:10.1002/9780470840481 · Cited by 126 · cited 2×
“Walters [88] presented the interpretation of the values for Spearman’s correlation coefficient, which can be seen in Table 10.”
BackgroundRoy, J., Das, S. R., Kar, S., & Pamucar, D. S. (2019) · Symmetry · doi:10.3390/sym11030393 · Cited by 118 · cited 2×
“[49] proposed an MCDM framework for selecting sustainable material in construction projects.”
BackgroundWalters, S. J. (2009) · Cited by 116
Maghsoodi, A. I., & Khalilzadeh, M. (2017) · KSCE Journal of Civil Engineering · doi:10.1007/s12205-017-1970-2 · Cited by 105
Mathiyazhagan, K., Gnanavelbabu, A., & Prabhuraj, B. L. (2018) · Journal of Advances in Management Research · doi:10.1108/jamr-09-2018-0085 · Cited by 103 · cited 2×
“[54] 2019 Triangular fuzzy numbers BWM/Fuzzy TOPSIS Materials selection for construction”
BackgroundMethodTian, Z., Zhang, H., Wang, J., & Wang, T. (2018) · Informatica · doi:10.15388/informatica.2018.192 · Cited by 101
Understanding construction supply chains: an alternative interpretation
Vrijhoef, R., Koskela, L., & Howell, G. A. (2001) · University of Salford Institutional Repository (University of Salford) · Cited by 90
Impact of competitive conditions on supplier evaluation: a construction supply chain case study
Seth, D., Nemani, V. K., Pokharel, S., & Sayed, A. Y. A. (2017) · Production Planning & Control · doi:10.1080/09537287.2017.1407971 · Cited by 85 · cited 2×
“In a study, a MCDM framework based on AHP method was introduced to investigate the effect of competitive conditions on the evaluation of suppliers in construction supply chains [40].”
MethodZhang, L.-J., Liu, R., Liu, H., & Shi, H. (2020) · Mathematical Problems in Engineering · doi:10.1155/2020/1783421 · Cited by 77
Rough MCDM model for green supplier selection in Iran: a case of university construction project
Shojaei, P., & bolvardizadeh, A. (2020) · Built Environment Project and Asset Management · doi:10.1108/bepam-11-2019-0117 · Cited by 59 · cited 2×
“Shojaei and Bolvardizadeh [68] used a hybrid MCDM approach to select a green supplier for an academic construction project.”
BackgroundImproved Decision Model for Evaluating Risks in Construction Projects
Yazdani, M., Abdi, M. R., Kumar, N., Keshavarz-Ghorabaee, M., & Chan, F. T. S. (2019) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001640 · Cited by 54 · cited 2×
“[50] proposed an innovative approach for risk assessment and solving MCDM problems in project selection problems.”
BackgroundSelf-citationKeshavarz-Ghorabaee, M., Amiri, M., Olfat, L., & Firouzabadi, S. M. A. K. (2017) · Technological and Economic Development of Economy · doi:10.3846/20294913.2017.1312630 · Cited by 52
Self-citationDecision Support Systems in Construction: A Bibliometric Analysis
Minhas, M. R., & Potdar, V. M. (2020) · Buildings · doi:10.3390/buildings10060108 · Cited by 48
A New Hybrid MCDM Model with Grey Numbers for the Construction Delay Change Response Problem
Chalekaee, A., Turskis, Z., Khanzadi, M., Amiri, G. G., & Keršulienė, V. (2019) · Sustainability · doi:10.3390/su11030776 · Cited by 39 · cited 2×
“[56] proposed a new MCDM approach for the construction delay change response problem.”
BackgroundMahdi, I. M., Ebid, A. M., & Khallaf, R. (2019) · Ain Shams Engineering Journal · doi:10.1016/j.asej.2019.08.007 · Cited by 39 · cited 2×
“[66] to select the optimal method for soft clay improvement.”
MethodMahmoudi, A., Abbasi, M., Deng, X., Ikram, M., & Yeganeh, S. (2020) · Grey Systems Theory and Application · doi:10.1108/gs-09-2019-0038 · Cited by 34 · cited 2×
“[69] 2020 Crisp-values BWM/GRA Risk management of construction projects”
BackgroundMethodConstruction Supply Chain Economics
London, K. A. (2007) · Routledge eBooks · doi:10.4324/9780203962480 · Cited by 34 · cited 3×
“However, in Figures 1 and 2, two schematic diagrams are depicted which can show some important elements of a construction supply chain [8,9].”
BackgroundJin, H., Zhang, M., & Yuan, Y. (2018) · Applied Sciences · doi:10.3390/app8122434 · Cited by 32 · cited 2×
“[46] 2018 Crisp-values ANP Facility layout planning”
Hedonic shopping rent valuation by one-to-one neuromarketing and neutrosophic PROMETHEE method
Zavadskas, E. K., Baušys, R., Kaklauskas, A., & Raslanas, S. (2019) · Applied Soft Computing · doi:10.1016/j.asoc.2019.105832 · Cited by 31 · cited 3×
“Therefore, the results of this research, neuro decision matrices [91,92], and MAMVA methods [89,90] can be used as a basis to determine the market, hedonic, and customer-perceived values of suppliers.”
MethodSelf-citationGhoddousi, P., Nasirzadeh, F., & Hashemi, H. (2018) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001514 · Cited by 31 · cited 2×
“The proposed approach was used in a case study to evaluate and prioritize highway construction projects considering economic, environmental, and social aspects [47].”
BackgroundMethodUtama, W. P., Chan, A. P. C., Gao, R., & Zahoor, H. (2017) · International Journal of Construction Management · doi:10.1080/15623599.2017.1315527 · Cited by 27
Zhang, F., Ju, Y., González, E. D. R. S., & Wang, A. (2020) · Advanced Engineering Informatics · doi:10.1016/j.aei.2020.101056 · Cited by 24 · cited 2×
“[67] 2020 Crisp-values AHP/EDAS Selecting construction equipment”
BackgroundAn Affect-Based Built Environment Video Analytics
Kaklauskas, A., Zavadskas, E. K., Bardauskienė, D., Čerkauskas, J., Ubartė, I., Seniut, M., Dzemyda, G., Kaklauskaite, M., Vinogradova, I., & Velykorusova, A. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.102888 · Cited by 22 · cited 1×
“Therefore, the results of this research, neuro decision matrices [91,92], and MAMVA methods [89,90] can be used as a basis to determine the market, hedonic, and customer-perceived values of suppliers.”
MethodSelf-citationAffective analytics of demonstration sites
Kaklauskas, A., Jokubauskas, D., Čerkauskas, J., Dzemyda, G., Ubartė, I., Skirmantas, D., Podviezko, A., & Simkute, I. (2019) · Engineering Applications of Artificial Intelligence · doi:10.1016/j.engappai.2019.03.001 · Cited by 21 · cited 1×
“Therefore, the results of this research, neuro decision matrices [91,92], and MAMVA methods [89,90] can be used as a basis to determine the market, hedonic, and customer-perceived values of suppliers.”
MethodSelf-citationDortaj, A., Maghsoudy, S., Ardejani, F. D., & Eskandari, Z. (2020) · Sustainable Water Resources Management · doi:10.1007/s40899-020-00362-2 · Cited by 20 · cited 2×
“[65] 2020 Crisp-values ELECTRE III Locating suitable sites for dams”
BackgroundMethodFuzzy AHP with Applications in Evaluating Construction Project Complexity
Nguyen, L. D., Le‐Hoai, L., Tran, D. Q., Dang, C. N., & Nguyen, C. V. (2018) · Emerald Group Publishing Limited eBooks · doi:10.1108/978-1-78743-868-220181007 · Cited by 18 · cited 2×
“[38] 2018 Triangular fuzzy numbers Fuzzy AHP Evaluating construction project complexity”
BackgroundHeravi, G., & Seresht, N. G. (2018) · KSCE Journal of Civil Engineering · doi:10.1007/s12205-017-1275-5 · Cited by 15 · cited 2×
“1 Heravi and Seresht [33] 2018 Crisp-values Developed TOPSIS Construction projects 2 Mohammadnazari and Ghannadpour [34] 2018 Crisp-values BWM/TOPSIS/UTASTAR method Location of hospital construction”
MethodMokarram, M., & Sathyamoorthy, D. (2019) · Energy Sources Part A Recovery Utilization and Environmental Effects · doi:10.1080/15567036.2019.1666189 · Cited by 9
Green Supplier Evaluation and Selection: An Updated Literature Review
Jemaa, S., Alayidi, A., Migdalas, A., Baourakis, G., & Drakos, P. D. (2020) · Cooperative management · doi:10.1007/978-3-030-38766-2_9 · Cited by 7
Green Closed-loop Supply Chain Network Design: A Literature Review
Elbounjimi, M., Abdul-Nour, G., & Ait-KadiI, D. (2014) · Cited by 7
Cited by
Rani, P., & Mishra, A. R. (2021) · Expert Systems with Applications · doi:10.1016/j.eswa.2021.115267 · Cited by 200
Ganie, A. H., Gheith, N. E. M., Al-Qudah, Y., Ganie, A. H., Sharma, S. K., Aqlan, A. M., & Khalaf, M. M. (2024) · IEEE Access · doi:10.1109/access.2023.3348780 · Cited by 16
Metadata
- Authors
- Keshavarz-Ghorabaee, M., Amiri, M., Hashemi-Tabatabaei, M., Zavadskas, E. K., & Kaklauskas, A.
- Venue
- Mathematics
- Publisher
- MDPI AG
- Published
- 2020-12-10
- Volume
- 8
- Issue
- 12
- Pages
- 2202
- ISSN
- 2227-7390 (ISSN-L)
- OpenAlex
- W3111674603
- Cited by
- 217
- References
- 62
- FWCI
- 16.57
- Type
- journal article
- Language
- en
- Open access
- gold
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.