Realizing the Need for Digital Transformation of Stakeholder Management: A Systematic Review in the Construction Industry
Open accessThe DOI matches its Crossref record; 94 of the 96 references it cites were found in a registry or an index.
Abstract
The construction industry is among the least digitized industries, and the lack of innovation in construction project management practices has led to decreases in productivity. The European Directives for Public Procurement are pushing the entire construction supply chain towards more radical digital transformations over the next years, and project managers are left with the difficult task to harness ICT for the involvement and management of project stakeholders. Digitalization of various processes and practices used to manage stakeholders in construction projects is still low, and part of this problem lies in weak systematization of ICT systems which support these practices. Thus, this paper provides a systematic review of how digitalization and digital transformation affect the way stakeholders behave, engage, and communicate in projects. Following the PRISMA methodology, 73 sources from the literature were chosen for the final analysis. Results are presented through descriptive and qualitative content analysis. Six research topics were identified and thoroughly analyzed. Results show that BIM, social network analysis, and web-based applications as means to digitalize stakeholder management are more mature than social media and VR/AR. An important finding is the need to reengineer and digitally transform processes in construction projects and construction firms to enable further digitalization and effectiveness of digital technologies. Suggestions for further studies follow this line of thought.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
The source backs part of the claim, not all of it — or backs it for a different population, condition or comparison.
In the citing paper
“Referred to as Industry 4.0, this transformative paradigm offers promising opportunities and a host of capabilities to enhance procurement processes [42].”
From Transformative Procurement Trends: Integrating Industry 4.0 Technologies for Enhanced Procurement Processes (2023) · cites this paper as [42]
Experimental — accuracy not yet measured
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Preferred reporting items for systematic reviews and meta-analyses: The PRISMA statement
Moher, D., Liberati, A., Tetzlaff, J., & Altman, D. G. (2010) · International Journal of Surgery · doi:10.1016/j.ijsu.2010.02.007 · Cited by 12,156 · cited 1×
“In this study, a selection and analysis of papers is conducted following the established PRISMA statement methodology [34], where PRISMA stands for “preferred reporting items for systematic reviews and meta-analyses”.”
MethodConducting content‐analysis based literature reviews in supply chain management
Seuring, S., & Gold, S. (2012) · Supply Chain Management: An International Journal · doi:10.1108/13598541211258609 · Cited by 1,245 · cited 6×
“We followed a two-step process approach elaborated in [35] of developing a pattern of analytic categories: after the basic frame of categories and dimensions (e.g., codes) has been established on the basis of existing theory, single categories are inductively refined during the coding process.”
MethodInfluentialStakeholder Theory: Reviewing a Theory That Moves Us
Laplume, A. O., Sonpar, K., & Litz, R. A. (2008) · Journal of Management · doi:10.1177/0149206308324322 · Cited by 1,185 · cited 1×
“For content analysis purposes, we iteratively developed precise codes related to our research topic [35] and presented them in a table codebook (Table 1) [36].”
MethodDeveloping design propositions through research synthesis
Denyer, D., Tranfield, D., & van Aken, J. E. (2008) · Organization Studies · doi:10.1177/0170840607088020 · Cited by 1,057 · cited 2×
“The SLR approach is consistent with suggestions made by [33,35].”
BackgroundA Guide to the Project Management Body of Knowledge (PMBOK Guide) Fifth Edition
Rose, K. H. (2013) · Project Management Journal · doi:10.1002/pmj.21345 · Cited by 692
Visualising and mapping stakeholder influence
Bourne, L., & Walker, D. H. T. (2005) · Management Decision · doi:10.1108/00251740510597680 · Cited by 476
Stakeholder impact analysis in construction project management
Olander, S. (2007) · Construction Management and Economics · doi:10.1080/01446190600879125 · Cited by 474
Understanding effects of BIM on collaborative design and construction: An empirical study in China
Liu, Y., van Nederveen, S., & Hertogh, M. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2016.06.007 · Cited by 411 · cited 3×
“Liu et al. [59] echo the BIM-coordinating architect they interviewed that it is not right to bear the responsibility for the BIM model if other project participants drew it, and they conclude that there are too many unaddressed obligation issues in current BIM practices.”
BackgroundMethodHeydarian, A., Carneiro, J. P., Gerber, D., Becerik-Gerber, B., Hayes, T., & Wood, W. (2015) · Automation in Construction · doi:10.1016/j.autcon.2015.03.020 · Cited by 369 · cited 1×
“…improvements to make VR/AR more adjusted to the communication needs of AEC industry stakeholders [71], and one research stream should deal with improving the accuracy of the data collected and analyzed in such environments so that they represent physical environments more realistically [69,101].”
BackgroundYang, R. J., & Zou, P. X. W. (2014) · Building and Environment · doi:10.1016/j.buildenv.2013.12.014 · Cited by 321 · cited 1×
“In different contexts, SNA was used either to identify key stakeholder(s) [49,87,90], which requires an analysis of network node characteristics, or to analyze the whole inter-organizational communication network [91,92], which focuses on overall network measures.”
MethodStakeholder Engagement: Achieving Sustainability in the Construction Sector
Bal, M., Bryde, D., Fearon, D., & Ochieng, E. (2013) · Sustainability · doi:10.3390/su5020695 · Cited by 299 · cited 1×
“Stakeholder management comprises two major processes (e.g., stakeholder analysis and engagement) [13], and it is increasingly becoming a part of construction project practice [14].”
BackgroundInfluence, stakeholder mapping and visualization
Walker, D. H. T., Bourne, L. M., & Shelley, A. (2008) · Construction Management and Economics · doi:10.1080/01446190701882390 · Cited by 221
CoVR: Cloud-Based Multiuser Virtual Reality Headset System for Project Communication of Remote Users
Du, J., Shi, Y., Zou, Z., & Zhao, D. (2018) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001426 · Cited by 215 · cited 3×
“The usage of virtual reality and similar technologies (e.g., AR and MR) has risen in recent years, but it is still relatively new ICT in the AEC industry, and at this stage of development, technology is quite expensive [40,76].”
BackgroundYang, R. J. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.10.011 · Cited by 196 · cited 3×
“The concept of social network analysis (SNA) developed out of social network theory, and its application incorporates mathematical, statistical, and computing methodologies [85].”
BackgroundMethodZaker, R., & Coloma, E. (2018) · Visualization in Engineering · doi:10.1186/s40327-018-0065-6 · Cited by 195
Using Mixed Reality for electrical construction design communication
Chalhoub, J., & Ayer, S. K. (2018) · Automation in Construction · doi:10.1016/j.autcon.2017.10.028 · Cited by 189 · cited 1×
“Chalhoub and Ayer’s [73] results suggest that mixed reality (MR) used as a construction site tool enabled a significantly higher productivity rate; reduced the time required to understand the design; led to fewer errors; and increased the number of accurately constructed conduits, thus showing that…”
BackgroundFramework for Stakeholder Management in Construction Projects
Yang, R. J., & Shen, Q. (2014) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000285 · Cited by 185 · cited 1×
“…years further divides stakeholder analysis processes (i.e., stakeholder identification, classification, assessment of stakeholder influence, etc.) [17–20] and stakeholder engagement processes (i.e., stakeholder communication, involvement, collaboration, etc.) [13,21,22] which is consistent with…”
ResultVisualizing Stakeholder Influence — Two Australian Examples
Bourne, L., & Walker, D. H. T. (2006) · Project Management Journal · doi:10.1177/875697280603700102 · Cited by 175
Assessment of social sustainability in construction projects using social network analysis
Almahmoud, E. S., & Doloi, H. K. (2015) · Facilities · doi:10.1108/f-05-2013-0042 · Cited by 175 · cited 1×
“Mok et al. [88] used SNA in cultural building projects to recognize the key actors and critical stakeholder concerns, while Almahmoud and Doloi [89] used it to map stakeholders with respect to their relative stakes and seven social core functions.”
MethodArayıcı, Y., Egbu, C., & Coates, P. M. (2012) · University of Salford Institutional Repository (University of Salford) · Cited by 173
Yu, T., Shen, G. Q., Shi, Q., Lai, X., Li, C. Z., & Xu, K. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2017.04.004 · Cited by 167 · cited 2×
“Yu et al. [96] extended SNA to the area of social risk management and indicated that stakeholder analysis and management can be integrated with other project management tools (e.g., risk management) to provide a more robust way of dealing with stakeholder-associated issues.”
BackgroundHeravi, A., Coffey, V., & Trigunarsyah, B. (2015) · QUT ePrints (Queensland University of Technology) · Cited by 159
Practical approaches for engaging stakeholders: findings from the UK
Chinyio, E. A., & Akintoye, A. (2008) · Construction Management and Economics · doi:10.1080/01446190802078310 · Cited by 158 · cited 1×
“…classification, assessment of stakeholder influence, etc.) [17–20] and stakeholder engagement processes (i.e., stakeholder communication, involvement, collaboration, etc.) [13,21,22] which is consistent with stakeholder management becoming a formal project management knowledge area [23].”
BackgroundRethinking communication in construction
Wikforss, Ö., & Löfgren, A. (2007) · Journal of Information Technology in Construction · Cited by 129
Assessing stakeholders' influence on social performance of infrastructure projects
Doloi, H. K. (2012) · Facilities · doi:10.1108/02632771211252351 · Cited by 126
Using virtual reality to facilitate communication in the AEC domain: a systematic review
Wen, J., & Gheisari, M. (2020) · Construction Innovation · doi:10.1108/ci-11-2019-0122 · Cited by 126 · cited 5×
“Current VR/AR affordances (i.e., text-based chat, avatars, etc.) proved to be useful, but there is still a need to develop more affordances to better meet stakeholder communication requirements [69,76].”
BackgroundInfluentialA typology of operational approaches for stakeholder analysis and engagement
Yang, J., Shen, G. Q., Bourne, L., Ho, C. M., & Xue, X. (2011) · Construction Management and Economics · doi:10.1080/01446193.2010.521759 · Cited by 115
Uribe, D. F., Ortiz‐Marcos, I., & Colsa, Á. U. (2018) · Sustainability · doi:10.3390/su10041300 · Cited by 111 · cited 1×
“Inadequate stakeholder management has led to process disruptions and adverse outcomes in many large construction projects [11,12] and it is considered as a fundamental instrument for setting the direction of projects [15].”
BackgroundDigital Transformation of the Design, Construction and Management Processes of the Built Environment
(2020) · Research for Development · doi:10.1007/978-3-030-33570-0 · Cited by 109 · cited 1×
“The European Directives for Public Procurement are pushing the entire construction supply chain towards more radical transformations over the next years by supporting research, development, and training for digitalization [10].”
BackgroundLin, X., Ho, C. M., & Shen, Q. (2017) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2017.04.007 · Cited by 106 · cited 2×
“Various other stakeholder and/or project characteristics can also be input into SNA, i.e., stakeholder power [93].”
BackgroundProductivity monitoring in building construction projects: a systematic review
Alaloul, W. S., Alzubi, K. M., Malkawi, A. B., Salaheen, M. A., & Musarat, M. A. (2021) · Engineering Construction & Architectural Management · doi:10.1108/ecam-03-2021-0211 · Cited by 85 · cited 1×
“These databases are the largest citation and abstract databases of peer-reviewed literature that deliver an overview of the world’s research output in the fields of technology, science, etc. [37].”
BackgroundFocused Sharing of Information for Multidisciplinary Decision Making by Project Teams
Liston, K., Fischer, M. A., & Winograd, T. (2001) · Journal of Information Technology in Construction · Cited by 83
Online Stakeholder Interactions in the Early Stage of a Megaproject
Williams, N. L., Ferdinand, N., & Pasian, B. (2015) · Project Management Journal · doi:10.1002/pmj.21548 · Cited by 80 · cited 2×
“Williams et al.’s [84] findings indicate that the majority of online stakeholders opposed the observed project, and they formed stable clusters that were not prone to a change of heart no matter what engagement strategy was used, probably because the engagement of the affected community started too…”
BackgroundAddressing stakeholder complexity and major pitfalls in large cultural building projects
Mok, K. Y., Shen, Q., & Yang, R. J. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2016.12.009 · Cited by 80 · cited 2×
“Mok et al. [88] echo with a similar caution and advise performing multiple analyses with different types of stakeholder-related data to cover all the angles of a project.”
BackgroundMethodUse of the Internet to enhance construction communication:Total Information Transfer System
Tam, C. M. (1999) · International Journal of Project Management · doi:10.1016/s0263-7863(97)00077-x · Cited by 79 · cited 3×
“Web Technology and Web-Based Applications Used to Digitalize a Variety of Different Stakeholder Management Practices Early papers (late 1990s and early 2000s) refer to web-based ICT systems as those which use the Internet and the World Wide Web (WWW) [47,48].”
BackgroundZhou, H., Wang, H., & Wei, Z. E. N. G. (2018) · Frontiers of Engineering Management · doi:10.15302/j-fem-2018075 · Cited by 79
A web-based system for managing construction information
Chassiakos, A. P., & Sakellaropoulos, S. (2008) · Advances in Engineering Software · doi:10.1016/j.advengsoft.2008.05.006 · Cited by 76 · cited 1×
“Important elements of stakeholder interaction are information management and communication processes, which are considered to be main constituents of efficient human cooperation [4].”
BackgroundImproving megaproject briefing through enhanced collaboration with ICT
Chung, J. K. H., Kumaraswamy, M. M., & Palaneeswaran, E. (2009) · Automation in Construction · doi:10.1016/j.autcon.2009.05.001 · Cited by 75
Dinis, F. M., Sanhudo, L., Martins, J. P., & Ramos, N. (2020) · Journal of Building Engineering · doi:10.1016/j.jobe.2020.101287 · Cited by 73 · cited 1×
“Project communication was enhanced by Dinis et al.’s [74] new workflow, which coupled laser scanning and virtual reality (VR) within building information modelling (BIM) and brought an alternative approach regarding the definition of expected requirements, qualities, and specifications valued by…”
BackgroundThe Concept of Enterprise BIM: Current Research Practice and Future Trends
Godager, B. A., Onstein, E., & Huang, L. (2021) · IEEE Access · doi:10.1109/access.2021.3065116 · Cited by 72 · cited 1×
“Godager et al. [99] presented the emerging enterprise BIM organization concept (EBIM) and emphasized the need for ICT standardization and best practices for interdisciplinary collaborative projects.”
BackgroundEffectiveness of Immersive Virtual Reality-based Communication for Construction Projects
Abbas, A. H., Choi, M., Seo, J., Cha, S. H., & Li, H. (2019) · KSCE Journal of Civil Engineering · doi:10.1007/s12205-019-0898-0 · Cited by 67 · cited 3×
“The usage of virtual reality and similar technologies (e.g., AR and MR) has risen in recent years, but it is still relatively new ICT in the AEC industry, and at this stage of development, technology is quite expensive [40,76].”
BackgroundResultELECTRONIC DOCUMENT MANAGEMENT IN CONSTRUCTION - RESEARCH ISSUES AND RESULTS
Björk, B. (2003) · Journal of Information Technology in Construction · Cited by 66
Database-Supported and Web-Based Visualization for Daily 4D BIM
Park, J., Cai, H., Dunston, P. S., & Ghasemkhani, H. (2017) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001392 · Cited by 61 · cited 2×
“This platform enhanced communication and collaboration among project participants in comparison to a file-based 4D BIM approach [65].”
MethodJahanger, Q. K., Louis, J., Pestana, C., & Trejo, D. (2021) · Journal of Information Technology in Construction · doi:10.36680/j.itcon.2021.001 · Cited by 61 · cited 5×
“It Is apparent that ICT is essential in daily work for most professionals in the construction industry [9], and Jahanger et al. [2] showed that proper digitalization of construction and project management practices can help in reversing the decline in productivity.”
BackgroundInfluentialReal-Time Interaction and Cost Estimating within Immersive Virtual Environments
Balali, V., Zalavadia, A. H., & Heydarian, A. (2019) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001752 · Cited by 59 · cited 3×
“The AR/VR market in the United States could be as large as USD 182 billion by 2025, proving that VR is a versatile tool for creating a collaborative environment [70].”
BackgroundMethodInfluentialKapogiannis, G., & Sherratt, F. (2018) · Built Environment Project and Asset Management · doi:10.1108/bepam-07-2017-0043 · Cited by 58 · cited 2×
“Kapogiannis and Sher-ratt [61] refer to BIM as an integrated collaborative technology, and they discovered that these types of technologies can boost collaborative culture throughout a project.”
BackgroundAn ontology-based web service framework for construction supply chain collaboration and management
Das, M., Cheng, J. C. P., & Law, K. H. (2015) · Engineering Construction & Architectural Management · doi:10.1108/ecam-07-2014-0089 · Cited by 55 · cited 1×
“…through web services; thus, to facilitate the collaboration and information exchange of supply chain stakeholders, an ICT system based on ontologies was developed, assisting stakeholders in using their own machines storing data but using a common platform, which improves data integrity [50].”
BackgroundA social network perspective of building information modelling in Greek construction projects
Badi, S. M., & Diamantidou, D. (2017) · Architectural Engineering and Design Management · doi:10.1080/17452007.2017.1307167 · Cited by 54 · cited 1×
“Some examples of good BIM implementation point to the high importance of the BIM managers and BIM coordinators in the project stakeholder network, demonstrating the effectiveness of these two new roles in managing the flow of communication [60].”
BackgroundAn nD modelling approach to improve communication processes for construction
Marshall-Ponting, A., & Aouad, G. F. (2004) · Automation in Construction · doi:10.1016/j.autcon.2004.08.018 · Cited by 52 · cited 6×
“…dating from 1978, is defined as intentional group processes plus software, and a few different types of ICT systems that were later researched fell into this category, namely computer-supported cooperative work (CSCW), group decision-support systems (GDSS), and computer-mediated communication [41].”
BackgroundMethodResultInfluentialUser perceptions of ICT impacts in Swedish construction companies: ‘it’s fine, just as it is’
Jacobsson, M., & Linderoth, H. C. J. (2012) · Construction Management and Economics · doi:10.1080/01446193.2012.672757 · Cited by 52 · cited 1×
“It Is apparent that ICT is essential in daily work for most professionals in the construction industry [9], and Jahanger et al. [2] showed that proper digitalization of construction and project management practices can help in reversing the decline in productivity.”
BackgroundCan virtual workspaces enhance team communication and collaboration in design review meetings?
Bassanino, M., Fernando, T., & Wu, K.-C. (2013) · Architectural Engineering and Design Management · doi:10.1080/17452007.2013.775102 · Cited by 50 · cited 4×
“Computer-mediated collaboration has been the main focus of Computer Supported Collaborative Working (CSCW) studies, which deal with ICT-supported information sharing, information exchange, collaborative decision making, and control protocols [27].”
BackgroundMethodInfluentialA multi-server information-sharing environment for cross-party collaboration on a private cloud
Zhang, J., Liu, Q., Hu, Z., Lin, J., & Yu, F. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.06.021 · Cited by 47 · cited 1×
“By considering important features of data ownership and privacy in a cross-party collaboration study, [67] proposed a multi-server approach based on a private cloud for BIM data sharing and management in which different stakeholders can collaborate smoothly while retaining ownership and control of…”
MethodLobo, S., & Abid, A. F. (2019) · Project Management Journal · doi:10.1177/8756972819864456 · Cited by 46
ICT for external stakeholder management: sociomateriality from a power perspective
Ninan, J., Mahalingam, A., Clegg, S. R., & Sankaran, S. (2020) · Construction Management and Economics · doi:10.1080/01446193.2020.1755047 · Cited by 45 · cited 10×
“Furthermore, obtaining external stakeholder support necessitates strategic engagement, often using information and communications technology (ICT) [25].”
BackgroundMethodInfluentialVentura, S. M., Castronovo, F., & Ciribini, A. L. C. (2020) · Journal of Information Technology in Construction · doi:10.36680/j.itcon.2020.014 · Cited by 43
Social network analysis of change management processes for communication assessment
Jafari, P., Mohamed, E., Lee, S. H., & AbouRizk, S. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103292 · Cited by 43 · cited 2×
“…extracted from a project and used as input to SNA software calculations, and these data can be based on, i.e., plotting the contractual stakeholder relations for analysis prior to conducting stakeholder engagement or combining it with real project communication for post evaluation purposes [91].”
MethodIntegrated Collaborative Tools for Precast Supply Chain Management
Abedi, M. R., Fathi, M. S., Mirasa, A. K., & Rawai, N. M. (2016) · Scientia Iranica · doi:10.24200/sci.2016.2129 · Cited by 41 · cited 1×
“…suppliers) is fundamental to successfully achieve the objectives of precast construction within the allocated time and assigned cost, and this issue led to the development of a collaborative tool comprising cloud computing, building information modelling, and context awareness (e.g., CACCBIM) [66].”
BackgroundMaskil-Leitan, R., & Reychav, I. (2018) · Clean Technologies and Environmental Policy · doi:10.1007/s10098-018-1526-2 · Cited by 38 · cited 3×
“In many cases of BIM usage, the benefit of better coordination is reported, and Maskil Leitan and Reychav [58] conclude that BIM leads to the formation of a new and possibly much more cooperative organizational infrastructure in which conducting proper stakeholder management can greatly contribute…”
BackgroundMethodFocusing megaproject strategies on sustainable best value of stakeholders
Kumaraswamy, M. M., Wong, K. K. W., & Chung, J. K. H. (2017) · Built Environment Project and Asset Management · doi:10.1108/bepam-01-2017-0003 · Cited by 36 · cited 2×
“Large construction projects are mostly focused on overcoming current infrastructure capacity problems or opening new business opportunities [11], and they bear great importance for the promotion of the economic and social wellbeing of the wider stakeholder community.”
BackgroundWeippert, A., Kajewski, S. L., & Tilley, P. (2002) · Construction Innovation · doi:10.1108/14714170210814702 · Cited by 35 · cited 3×
“Web Technology and Web-Based Applications Used to Digitalize a Variety of Different Stakeholder Management Practices Early papers (late 1990s and early 2000s) refer to web-based ICT systems as those which use the Internet and the World Wide Web (WWW) [47,48].”
BackgroundMethodBIM tool development enhancing collaborative scheduling for pre-construction
Tallgren, M. V., Roupé, M., Johansson, M., & Bosch‐Sijtsema, P. M. (2020) · Journal of Information Technology in Construction · doi:10.36680/j.itcon.2020.022 · Cited by 35 · cited 2×
“Users stressed the improved legibility of the schedule as well as a better overview of the tasks and agreed that VPP really supports cooperative scheduling [64].”
BackgroundMethodCommunity-Centric Model for Evaluating Social Value in Projects
Doloi, H. K. (2018) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001473 · Cited by 32 · cited 1×
“SNA was also used with other methods to provide even more insightful stakeholder analysis, i.e., it was combined with a social performance index [94], and in another example, it was combined with Louvain’s algorithm in what if analysis to predict situations if other stakeholders are invited to the…”
MethodIT‐enhanced communication protocols for building project management
Ahuja, V., Yang, J., & Shankar, R. (2010) · Engineering Construction & Architectural Management · doi:10.1108/09699981011024678 · Cited by 30 · cited 2×
“This is in line with other research in this field [41,43], which has emphasized the need for a user-centered approach to the development and implementation of ICT systems, which covers collaborative work between various construction stakeholders.”
BackgroundResultRequirements engineering for innovative integrated ICT systems for the construction industry
Arayıcı, Y., Aouad, G. F., & Ahmed, V. (2005) · Construction Innovation · doi:10.1108/14714170510815249 · Cited by 30 · cited 1×
“Arayici et al. [42] analyzed computer integrated construction (CIC), which consists of ICT systems designed to facilitate collaboration between a geographically dislocated set of construction stakeholders (i.e., ICT tools for client briefing, site planning, etc.).”
BackgroundNik‐Bakht, M., & El-Diraby, T. E. (2015) · Computer-Aided Civil and Infrastructure Engineering · doi:10.1111/mice.12152 · Cited by 29 · cited 4×
“…engagement can be misleading because there are always groups who are not vocal in an online environment or simply are not active with particular social media (i.e., Twitter) [81], and there is also the issue of confidentiality of the project-related as well as follower-related information [82].”
BackgroundInfluentialStakeholder Management and Project Sustainability—A Throw of the Dice
Cvijović, J., Obradovic, V. L., & Todorovic, M. L. (2021) · Sustainability · doi:10.3390/su13179513 · Cited by 29
Organizing it in construction: present state and future challenges in Sweden
Gustavsson, T. K., Samuelson, O., & Wikforss, Ö. (2012) · Journal of Information Technology in Construction · Cited by 27
4D BIM models for smart utility relocation management in urban infrastructure projects
Vilventhan, A., Razin, S., & Rajadurai, R. (2020) · Facilities · doi:10.1108/f-08-2019-0091 · Cited by 26 · cited 3×
“To achieve benefits from the BIM collaboration of project stakeholders, besides alignment with the work activities, a willingness to adopt BIM is also considered as a crucial factor [57].”
BackgroundDu, J., & El-Gafy, M. A. (2014) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000343 · Cited by 21 · cited 2×
“In the case of the presented multiagent systems (MAS), there is a need for external justification to increase the applicability of developed simulation systems [45].”
BackgroundMethodТрач, Р., & Lendo-Siwicka, M. (2021) · Civil Engineering and Environmental Systems · doi:10.1080/10286608.2021.1925654 · Cited by 21 · cited 2×
“…other methods to provide even more insightful stakeholder analysis, i.e., it was combined with a social performance index [94], and in another example, it was combined with Louvain’s algorithm in what if analysis to predict situations if other stakeholders are invited to the project network [95].”
BackgroundMethodMultiagent Systems in Construction: A Ten-Year Review
Liang, X., Shen, Q., & Bu, S. (2016) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000574 · Cited by 20 · cited 2×
“There is also merit in further investigation of integrating MAS and other ICT systems such as BIM [44].”
BackgroundNik‐Bakht, M., & El-Diraby, T. E. (2015) · International Journal of Human-Computer Studies · doi:10.1016/j.ijhcs.2015.11.002 · Cited by 20
Analysis communication network of construction project participants
Трач, Р., & BUSHUYEV, S. D. (2020) · Scientific Review Engineering and Environmental Sciences (SREES) · doi:10.22630/pniks.2020.29.3.33 · Cited by 20 · cited 2×
“…by project managers when they want to understand how the interaction in the project occurs, how strong the connections are between team members, who is the key stakeholder, etc. [86], and Doloi [87] points out that prior to analysis, stakeholders should be identified, i.e., by their project roles.”
BackgroundMethodAnderson, A., Dossick, C. S., Iorio, J., & Taylor, J. E. (2017) · Journal of Information Technology in Construction · Cited by 19
Federating Cloud Systems for Collaborative Construction and Engineering
Ahmed, U., Petri, I., RANA, O. F., Raza, I., & Hussain, S. A. (2020) · IEEE Access · doi:10.1109/access.2020.2990233 · Cited by 19 · cited 2×
“Additionally, the authors of [30,51] admit that newly developed frameworks and models (e.g., the client briefing framework or federated cloud evaluation) are better suited for large scale projects and multiple stakeholder contexts, leaving room to explore web apps for normal scaled projects.”
BackgroundMethodBeyond Chatter: Profiling Community Discussion Networks in Urban Infrastructure Projects
Nik‐Bakht, M., & El-Diraby, T. E. (2020) · Journal of Infrastructure Systems · doi:10.1061/(asce)is.1943-555x.0000555 · Cited by 18 · cited 2×
“The most common use of social media has been reported in the engagement of public stakeholders [25,79], which is corroborated by the fact that the usage of social media is constantly on the rise in large U.S. state transportation agencies [80].”
BackgroundPresence of Social Client Relationship Management within the Nigerian Construction Industry
Ojelabi, R. A., Oyeyipo, O. O., Afolabi, A. O., & Amusan, L. M. (2018) · Buildings · doi:10.3390/buildings8040060 · Cited by 17 · cited 5×
“Ojelabi et al. [83] concluded that social client relationship management (CRM 2.0) based on social media is not recognized in the construction sector, while it is often used in various other industries.”
BackgroundMethodResultInfluentialProject collective mind: Unlocking project discussion networks
Nik‐Bakht, M., & El-Diraby, T. E. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.08.026 · Cited by 16 · cited 2×
“In different contexts, SNA was used either to identify key stakeholder(s) [49,87,90], which requires an analysis of network node characteristics, or to analyze the whole inter-organizational communication network [91,92], which focuses on overall network measures.”
BackgroundMethodDigital Era and Project Manager’s Competencies
Obradovic, V. L., Montenegro, A., & Bjelica, D. (2018) · European Project Management Journal · doi:10.18485/epmj.2018.8.1.1 · Cited by 15
Lin, Y., Jung, S., & Su, Y.-C. (2019) · Advances in Civil Engineering · doi:10.1155/2019/8367131 · Cited by 15 · cited 1×
“With a similar intention, Lin et al. [63] developed a database-supported and BIM-based CMI (DBCMI) system for general contractors which integrates BIM with web technology and allows users (e.g., project managers, BIM engineers, etc.) to communicate various interface issues.”
MethodThe Bimbot: mediating technology for enacting coordination in teamwork collaboration
Mutis, I., & Ramachandran, A. (2021) · Journal of Information Technology in Construction · doi:10.36680/j.itcon.2021.009 · Cited by 13 · cited 3×
“To address the issue of cooperative work in BIM, Mutis and Ramachandran [62] developed the BIMbot cognitive assistant that informs and advises on activities, engages team members together in a task, and facilitates fundamental actions for shared understandings.”
BackgroundMethodInfluentialNew Boundary Spanners: Emerging Management Roles in Collaborative Construction Projects
Gustavsson, T. K. (2015) · Procedia Economics and Finance · doi:10.1016/s2212-5671(15)00161-6 · Cited by 11 · cited 1×
“Complexity is added by the reciprocal interdependencies between different stakeholders, such as financing bodies, authorities, architects, engineers, and many others, which makes it necessary for construction projects to improve integration, cooperation, communication, and coordination [3].”
BackgroundAn Investigation of the Impact of Social Media on Construction Project Management
Al-Shehan, A. O., & Assbeihat, J. M. (2021) · Civil Engineering Journal · doi:10.28991/cej-2021-03091644 · Cited by 10 · cited 5×
“Social media platforms have become omnipresent in our daily life, and this is due to their convenience of use; users access social media from their smartphones at any time and from any place [77].”
BackgroundInfluentialBIM Methodology and Tools Implementation for Construction Companies (GreenBIM Project)
Mirarchi, C., Trebbi, C., Spagnolo, S. L., Daniotti, B., Pavan, A., & Tripodi, D. (2019) · Research for development · doi:10.1007/978-3-030-33570-0_18 · Cited by 9
Zhang, Y., Hu, H., & Xu, F. (2020) · Journal of Intelligent & Fuzzy Systems · doi:10.3233/jifs-179921 · Cited by 9 · cited 1×
“Project change management processes in BIM projects have shown that if we want to perform BIM-supported change management there, it can only be done if we re-engineer construction change management processes, adjusting both the workflow and the organizational units involved [98].”
Book and Media Reviews: Conducting Research Literature Reviews: From the Internet to Paper
Gallagher, S. J. (2006) · New Horizons in Adult Education and Human Resource Development · doi:10.1002/nha3.10270 · Cited by 8
Managing construction site communication using the responsibility assignment matrix (RAM) system
Shrahily, R. Y., Medjdoub, B., Klalib, H. A., Chalal, M. L., & Alwetaishi, M. (2020) · International Journal of Construction Management · doi:10.1080/15623599.2020.1837717 · Cited by 8 · cited 1×
“Shrahily et al. [100] conclude that communication remains a major issue to achieve BIM Level 3 in the UK, as it requires all organizations involved to use a single platform to facilitate communication, which further corroborates the need to develop the proper organizational context for multi-firm…”
BackgroundImproving the Transparency of Construction Projects through Visualization Technology
Khwaja, N. A., & Schmeits, C. (2014) · Transportation Research Record Journal of the Transportation Research Board · doi:10.3141/2408-05 · Cited by 4 · cited 5×
“The responsibility to justify expenses in ICT infrastructure, which can be relatively high, opens up the research question of how to calculate the cost–benefit analysis of implementing various ICT systems [29].”
BackgroundInfluentialManaging Public Communication Strategies in Accelerated Highway Construction Projects
Minooei, F., Sobin, N., Goodrum, P. M., & Molenaar, K. R. (2018) · Transportation Research Record Journal of the Transportation Research Board · doi:10.1177/0361198118759943 · Cited by 4 · cited 2×
“The most common use of social media has been reported in the engagement of public stakeholders [25,79], which is corroborated by the fact that the usage of social media is constantly on the rise in large U.S. state transportation agencies [80].”
BackgroundSocial Relation Cognitive Model on Virtual Prototyping Technology in Construction Project
Zhang, L., Liu, H., & Wang, G. (2013) · International Journal of Online and Biomedical Engineering (iJOE) · doi:10.3991/ijoe.v9i3.2883 · Cited by 3 · cited 2×
“Wang and Zhang [49] presented a tailor-made web-based project management system (named ICPMS) developed for one major developer, and it encompassed a common communication platform for the project participants, coordinating the company headquarters, construction sites, and consultancy offices.”
BackgroundMethodDamström, M. (2020) · KTH Publication Database DiVA (KTH Royal Institute of Technology) · Cited by 3
Liu, Y., Liu, Y., Lin, M., Zhang, J., Yang, C., Huang, G., Zhang, Y., & Zhao, Q. (2020) · IOP Conference Series Earth and Environmental Science · doi:10.1088/1755-1315/568/1/012051 · Cited by 3 · cited 1×
“Building information modelling (BIM) promotes the collaborative working of different stakeholders, enabling them to support and reflect their respective responsibilities by inserting, extracting, updating, and sharing information through the BIM model [26].”
BackgroundDevelopment Of Web-Based Teams Management System In Construction
Lin, Y.-C. (2010) · doi:10.5281/zenodo.1076673 · Cited by 2
Re-investigating Approaches on Defining Stakeholder Characteristics
Prebanić, K. R., & Dunović, I. B. (2017) · Cited by 1
Self-citation
Research works printed but not linked: 3
- Adriaanse, 2004, Alignment between ICT and Communication in Construction Projects, Int. J. Hum. Resour. Dev. Manag., 4, 346, 10.1504/IJHRDM.2004.005043 · doi:10.1504/ijhrdm.2004.005043
- Fink, A. (2014). Conducting Research Literature Reviews: From the Internet to Paper, SAGE Publications Inc.. [4th ed.].
- Winch, G.M. (2010). Managing Construction Projects, Wiley-Blackwell.
Cited by
Martínez-Peláez, R., Ochoa-Brust, A., Rivera, S., Félix, V. G., Ostos, R., Brito, H., Félix, R. A., & Mena, L. J. (2023) · Sustainability · doi:10.3390/su151411221 · Cited by 553
Althabatah, A., Yaqot, M., Menezes, B., & Kerbache, L. (2023) · Logistics · doi:10.3390/logistics7030063 · Cited by 108
“Referred to as Industry 4.0, this transformative paradigm offers promising opportunities and a host of capabilities to enhance procurement processes [42].”
BackgroundInfluentialDigital transformation and marketing: a systematic and thematic literature review
Cioppi, M., Curina, I., Francioni, B., & Savelli, E. (2023) · Italian Journal of Marketing · doi:10.1007/s43039-023-00067-2 · Cited by 160
“…Thekkoote, 2022), production 209 1 3 Italian Journal of Marketing (2023) 2023:207–288 applications (D’Almeida et al., 2022), business management adaptability (Zhang et al., 2021), stakeholder management (Prebanić and Vukomanović, 2021), and sustainability (Gomez-Trujillo and Gonzalez-Perez, 2021).”
BackgroundExploring Stakeholder Engagement Process as the Success Factor for Infrastructure Projects
Prebanić, K. R., & Vukomanović, M. (2023) · Buildings · doi:10.3390/buildings13071785 · Cited by 107
Self-citationZhang, G., Wang, T., Wang, Y., Zhang, S., Lin, W., Dou, Z., & Du, H. (2023) · Sustainability · doi:10.3390/su15076317 · Cited by 56
Metadata
- Authors
- Prebanić, K. R., & Vukomanović, M.
- Affiliations
- University of Zagreb (HR)
- Corresponding author
- Prebanić, Kristijan Robert
- Venue
- Sustainability
- Publisher
- MDPI AG
- Published
- 2021-11-16
- Volume
- 13
- Issue
- 22
- Pages
- 12690
- ISSN
- 2071-1050 (ISSN-L)
- OpenAlex
- W3211453731
- Cited by
- 93
- References
- 96
- Citations by year
- 2026: 16 · 2025: 24 · 2024: 23 · 2023: 25 · 2022: 5
- FWCI
- 1.22
- Type
- journal article
- Language
- en
- Open access
- gold
- doi.org
- Licence
- Locations
- Sustainability (publishedVersion, cc-by)
- RePEc: Research Papers in Economics (submittedVersion)
- DOAJ (DOAJ: Directory of Open Access Journals) (submittedVersion, cc-by-sa)
- Topics
- Physical Sciences › Engineering › Building and Construction › BIM and Construction Integration
- Social Sciences › Decision Sciences › Management Science and Operations Research › Construction Project Management and Performance
- Physical Sciences › Engineering › Building and Construction › Construction Management and Sustainability
- Keywords
- stakeholder management, digital transformation, construction industry, construction project management, ICT in construction, building information modeling, social network analysis, web application, social media, virtual and augmented reality, stakeholder engagement, stakeholder communication, public procurement directives, process reengineering
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.