Analysis of Barriers and the Potential for Exploration of Deconstruction Techniques in Portuguese Construction Sites
Open accessThe DOI matches its Crossref record.
Abstract
Deconstructing a building is the careful dismantling of that building so as to make possible the recovery of construction materials and components, promoting their reuse and recycling. However, deconstruction remains a rare procedure in Portugal. Using previous studies and data collected from present experiences, this paper presents a critical discussion on the importance of deconstruction for rehabilitation. Its aims are to discuss the main advantages, barriers and opportunities of this demolition technique, as well as the guidelines to the design process, aiming at assuring a successful management deconstruction process. Suggestions to impel this technique in Portugal are also described.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cited by
Waste minimisation through deconstruction: A BIM based Deconstructability Assessment Score (BIM-DAS)
Akinade, O. O., Oyedele, L. O., Bilal, M., Ajayi, S. O., Owolabi, H. A., Alaka, H. A., & Bello, S. A. (2015) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2015.10.018 · Cited by 272
Akinade, O. O., Oyedele, L. O., Ajayi, S. O., Bilal, M., Alaka, H. A., Owolabi, H. A., Bello, S. A., Jaiyeoba, B. E., & Kadiri, K. O. (2017) · Waste Management · doi:10.1016/j.wasman.2016.08.017 · Cited by 310
Barriers to Implementing the Circular Economy in the Construction Industry: A Critical Review
Charef, R., Morel, J.-C., & Rakhshan, K. (2021) · Sustainability · doi:10.3390/su132312989 · Cited by 188
“The lack of recertification, legal warranties and residual performance analysis of recovered building materials has been noted by Couto and Couto (2010) in the particular cases of De, SB, and the 3Rs, especially when compared to conventional processes.”
BackgroundInfluentialAlJaber, A., Martinez-Vazquez, P., & Baniotopoulos, C. (2023) · Buildings · doi:10.3390/buildings13112778 · Cited by 130
Drivers for adopting reverse logistics in the construction industry: a qualitative study
Chileshe, N., Rameezdeen, R., & Hosseini, M. R. (2016) · Engineering, Construction and Architectural Management · doi:10.1108/ecam-06-2014-0087 · Cited by 119
Zaman, A. U., Arnott, J., Mclntyre, K., & Hannon, J. (2018) · doi:10.20944/preprints201809.0037.v1 · Cited by 53
“Often, a labor-intensive manual method is applied in the deconstruction process due to a lack of technology-driven automated system for material collection and to ensure a maximum resource recovery opportunity of the manual work [14].”
Method
Metadata
- Authors
- Couto, J., & Couto, A.
- Venue
- Sustainability
- Publisher
- MDPI AG
- Published
- 2010-01-27
- Volume
- 2
- Issue
- 2
- Pages
- 428-442
- ISSN
- 2071-1050 (ISSN-L)
- OpenAlex
- W2041688684
- Cited by
- 32
- References
- 0
- FWCI
- 0.00
- Type
- journal article
- Language
- en
- Open access
- gold
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.