Elective Demolition Of Redundant And Earthquake Damaged Buildings In Turkey
Open accessAbstract
When a building reaches the end of its useful life or suffers severe damage during a disaster, it has to be demolished.However, not much is known about how the demolition work proceeds, or how is it regulated in Turkey; what machinery, tools and techniques are used; what material is salvaged and what dumped as waste; and how it is disposed off.Answers to these questions were sought through research conducted in İstanbul, Ankara and İzmir, as well as in earthquake affected areas in Turkey.Safety was an issue that became a concern during the course of these studies.This paper presents an overview of information on pertinent legislation and regulations; the conventional procedure for building demolition work; and case studies on selective demolition of redundant and damaged buildings.Based on the findings of the case studies certain recommendations are made to enhance safety and feasibility of building disposal projects.
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
Training operators for effective deconstruction is a factor driving reuse.
“Training operators for effective deconstruction (Dantata et al., 2005; Elias Özkan, 2012; Shaurette, 2006), availability of space for the storage of the reusable components after deconstruction (Rogers, 2011) and knowledge and experience in using reused components (Tingley et al., 2017), as well as proper separation of the reusable components after deconstruction (Ajayi et al., 2017; Ding et al.,”
From Components reuse in the building sector – A systematic review (2020) · cites this paper as Elias Özkan, 2012
The Discussion on Safety Issues (page unavailable) says workers need knowledge and skills to deconstruct buildings safely, rapidly and efficiently. The paper discusses salvaging components for reuse elsewhere, but does not establish that operator training drives reuse. (LLM, conf=0.83)
Experimental — accuracy not yet measuredProper separation of reusable components after deconstruction is a factor driving reuse.
“Training operators for effective deconstruction (Dantata et al., 2005; Elias Özkan, 2012; Shaurette, 2006), availability of space for the storage of the reusable components after deconstruction (Rogers, 2011) and knowledge and experience in using reused components (Tingley et al., 2017), as well as proper separation of the reusable components after deconstruction (Ajayi et al., 2017; Ding et al.,”
From Components reuse in the building sector – A systematic review (2020) · cites this paper as Elias Özkan, 2012
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Cites
No references could be resolved yet.
Research works printed but not linked: 2
- ELIAS ÖZKAN, S.T. (2003) Deconstruction of earthquake damaged buildings in Turkey, Deconstruction and Materials Reuse -Proceedings of 11th Rinker International Conference on Deconstruction and Materials Reuse, Gainesville, ed. A.R.Chini, CIB Publication No. 287, Rotterdam; 138-50.
- ELIAS ÖZKAN, S.T. and DÜZGÜNEŞ, A. (2002) Recycling of construction material and the reuse of building components: An overview, in the proceedings of the CIB-W107 international conference on Creating a sustainable construction industry in developing countries, CSIR, Pretoria; 265-76.
Cited by
Sorted by citations
Components reuse in the building sector – A systematic review
Rakhshan, K., Morel, J.-C., Alaka, H., & Charef, R. (2020) · Waste Management & Research: The Journal for a Sustainable Circular Economy · doi:10.1177/0734242x20910463 · Cited by 167 · see citing works
“Training operators for effective deconstruction (Dantata et al., 2005; Elias Özkan, 2012; Shaurette, 2006), availability of space for the storage of the reusable components after deconstruction (Rogers, 2011) and knowledge and experience in using reused components (Tingley et al., 2017), as well as…”
Background
- Authors
- Özkan, S. E.
- Corresponding author
- Soofia Elias Özkan
- Venue
- METU JOURNAL OF THE FACULTY OF ARCHITECTURE
- Published
- 2012-06-01
- ISSN
- 0258-5316 (ISSN-L)
- OpenAlex
- W3000188387
- Cited by
- 2
- References
- 0
- Citations by year
- 2025: 1 · 2020: 1
- FWCI
- 0.00
- Type
- journal article
- Language
- en
- Open access
- bronze
- doi.org
- Locations
- METU Journal of the Faculty of Architecture (publishedVersion)
- OpenMETU (Middle East Technical University) (submittedVersion, cc-by-nc-nd)
- Topics
- Physical Sciences › Engineering › Civil and Structural Engineering › Construction Engineering and Safety
- Physical Sciences › Engineering › Building and Construction › Recycled Aggregate Concrete Performance
- Physical Sciences › Engineering › Building and Construction › Construction Management and Sustainability
- Keywords
- building demolition, selective demolition, earthquake-damaged buildings, demolition safety, construction and demolition waste, waste disposal, Turkey
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review