Machine Learning-Based State Estimation for an Actual Transmission System Using Field PMU Data
Open accessThe DOI matches its DataCite record; 27 of the 27 references it cites were found in a registry or an index; none of the 19 sources its claims cite is checked for support yet.
Abstract
Time-synchronized state estimation (SE) plays a critical role in ensuring real-time situational awareness in modern power systems. However, achieving full system observability using phasor measurement units (PMUs) is often impractical due to cost and deployment constraints. Moreover, SE operation at PMU timescales imposes stringent requirements on latency, robustness, and reliability that are difficult to satisfy using conventional iterative hybrid SE techniques under incomplete observability by PMUs. This paper evaluates the feasibility of deploying deep neural networks for PMU-timescale, time-synchronized SE in real-world PMU-unobservable transmission systems using actual data from a US power utility. Key contributions include a systematic assessment of estimation accuracy, scalability, and computational performance under realistic operating conditions.
Overview
CoChat Summary
TL;DR
This paper evaluates deep neural network-based time-synchronized state estimation (DNN-SE) on an actual US transmission system using field PMU data and historical SCADA data, despite only ~9% direct PMU observability. It reports low errors on a held-out synthetic test set and fast inference, while field-data accuracy depends on load variability and requires bad-data detection and replacement.
Key findings
- On the held-out synthetic test set with exact ground truth, DNN-SE V and DNN-SE VI achieved voltage magnitude MAPE of 0.250% and 0.202%, and phase angle MAE of 0.042° and 0.041°, respectively; DNN-SE VI outperformed DNN-SE V owing to current phasor measurements.
- On field PMU data under original load variability, DNN-SE VI achieved MAPE 0.396% and MAE 0.851°, versus DNN-SE V MAPE 0.688% and MAE 1.274°; under reduced 5% load variation, DNN-SE VI improved to MAPE 0.083% and MAE 0.177° (DNN-SE V: 0.150% and 0.209°).
- Voltage magnitude accuracy satisfied the IEEE 1% TVE threshold across all evaluation settings; phase angle accuracy met the corresponding 0.573° threshold under reduced 5% load variability but exceeded it under original load variability.
- Average online inference times were approximately 1.5 × 10⁻⁴ s for DNN-SE V and 2.0 × 10⁻⁴ s for DNN-SE VI, well within the ≤33 ms PMU reporting interval; BDDR completed within 33 ms and substantially reduced voltage magnitude estimation errors at five anonymized PMU-equipped buses.
Methods
- Validation study on an anonymized actual US transmission system (“System S”): multi-area network with thousands of buses from 69 kV to 500 kV, 1,493 transmission buses ≥69 kV, and approximately 133 PMU-monitored buses (~9% direct observability). Historical SCADA snapshots covered six months (July 1–December 31, two per day at 2:00 PM and 2:30 PM, ~366 raw files); field PMU data were 1 frame/s over 2:00–3:00 PM on August 15.
- Offline training used a dominant topology T (mid-July through mid-August) with ~70 SCADA cases (July 12–August 15). KDE-based load characterization and random sampling generated 25,000 operating conditions; PSS/E power flow produced reference voltage magnitudes and angles for all buses, while PMU voltage/current phasors at installed locations served as inputs. Synthetic cases were split 65% training, 20% validation, and 15% test.
- DNN-SE models were feed-forward fully connected Keras/TensorFlow networks: DNN-SE V input dimension 266, DNN-SE VI input dimension 746, output dimension 2,986; 4 hidden layers with 1,500/2,000 neurons, ReLU, linear output, MSE loss, Adam, learning rate 0.001, dropout 0.3, batch size 300, 300 epochs, and batch normalization. Online evaluation used PMU data from 2:25–2:30 PM (~300 samples), preprocessing (cleaning, reference alignment, angle unwrapping), prior-window normalization, and Wald-test BDDR; evaluation used common states, SCADA snapshots, and a held-out synthetic test set.
Limitations
- Stated: field PMU validation is limited to one dominant topology and a five-minute evaluation window; future work includes extending validation across topology transitions, adding contingency/extreme-event scenarios, and adding operator flags for BDDR-identified bad measurements.
- Stated: no exact ground-truth state labels exist for field PMU data; SCADA snapshots are not time-synchronized and only approximate system state; PF-derived states are treated as best-available reference labels rather than exact ground truth; and a training/test distribution mismatch exists because training uses synthetic SCADA/PF data while testing uses field PMU streams.
- Evident from the text: historical SCADA data were limited (~70 cases for topology T, ~366 raw files over six months), requiring KDE-based augmentation; the analysis is based on an anonymized single utility system and one selected topology, so generalization to other systems or topologies is not demonstrated; and phase angle errors exceeded the IEEE threshold under original load variability.
Model-written summary. Check it against the paper before relying on it.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
0 Valid · 0 Not valid · 13 Not checked · 45 Own results and interpretations
A result the paper reports from its own data — it cites no other source for it, so there is none to check. The quote shows it is in the paper.
In the paper
“As reported in the first row of Table 2, both DNN-SE models achieve very low errors on this evaluation”
§ Machine Learning-Based State Estimation for an Actual Transmission System Using Field PMU Data > 4.4. State Estimation Overall Performance on Test System
plain- Asserted: passes — The authors put it forward as true.
- Checkable: passes — It can be checked against evidence.
- Load-bearing: passes — The paper’s conclusions depend on it.
- Based: passes — The paper gives a reason why it holds.
A result the paper reports from its own data — it cites no other source for it, so there is none to check. The quote shows it is in the paper.
In the paper
“both models consistently operate well within PMU timescale requirements.”
§ Machine Learning-Based State Estimation for an Actual Transmission System Using Field PMU Data > 4.5. Computational Performance and Runtime Analysis
boosted- Asserted: passes — The authors put it forward as true.
- Checkable: passes — It can be checked against evidence.
- Load-bearing: passes — The paper’s conclusions depend on it.
- Based: passes — The paper gives a reason why it holds.
A result the paper reports from its own data — it cites no other source for it, so there is none to check. The quote shows it is in the paper.
In the paper
“The proposed BDDR implementation was found to complete detection and replacement within 33 ms, ensuring that real-time SE is not delayed and that acceptable latency is maintained.”
§ Machine Learning-Based State Estimation for an Actual Transmission System Using Field PMU Data > 4.6. Bad Data Detection and Replacement (BDDR)
plain- Asserted: passes — The authors put it forward as true.
- Checkable: passes — It can be checked against evidence.
- Load-bearing: passes — The paper’s conclusions depend on it.
- Based: passes — The paper gives a reason why it holds.
- Rests on an assumption not shown here.
A result the paper reports from its own data — it cites no other source for it, so there is none to check. The quote shows it is in the paper.
In the paper
“This process was repeated for 25,000 instances, resulting in a comprehensive set of OCs that capture realistic variability in system loading.”
§ Machine Learning-Based State Estimation for an Actual Transmission System Using Field PMU Data > 4.1. Training Dataset Generation
plainstates a cause- Asserted: passes — The authors put it forward as true.
- Checkable: passes — It can be checked against evidence.
- Load-bearing: passes — The paper’s conclusions depend on it.
- Based: passes — The paper gives a reason why it holds.
A result the paper states — it cites no source for it, so there is none to check. The quote shows it is in the paper.
In the paper
“System S represents a multi-area transmission network comprising thousands of buses spanning voltage levels from 69 kV to 500 kV.”
§ Machine Learning-Based State Estimation for an Actual Transmission System Using Field PMU Data > 3.1. Test System Description
plain- Asserted: passes — The authors put it forward as true.
- Checkable: passes — It can be checked against evidence.
- Load-bearing: unclear — It is unclear whether the paper’s conclusions depend on it.
- Based: passes — The paper gives a reason why it holds.
33 more claims
Create a free account to see all 58 claims and to verify the 12 references still open.
- It may state two separate claims as one. 18
- Probably not a substantial claim. 6
- The quote only partly states this claim. 1
Citations
Cites
IEEE Standard for Synchrophasor Measurements for Power Systems
(2011) · doi:10.1109/ieeestd.2011.6111219 · Cited by 651
Neural network with unbounded activation functions is universal approximator
Sonoda, S., & Murata, N. (2017) · Applied and Computational Harmonic Analysis · doi:10.1016/j.acha.2015.12.005 · Cited by 303
Synchronized Phasor Measurements and Their Applications
PHADKE, A. G., & Thorp, J. S. (2017) · Power electronics and power systems · doi:10.1007/978-3-319-50584-8 · Cited by 292
Bayesian State Estimation for Unobservable Distribution Systems Via Deep Learning
Mestav, K. R., Luengo-Rozas, J., & Tong, L. (2019) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2019.2919157 · Cited by 216
A Survey of Power System State Estimation Using Multiple Data Sources: PMUs, SCADA, AMI, and Beyond
Cheng, G., Lin, Y., Abur, A., Gómez-Expósito, A., & Wu, W. (2024) · IEEE Transactions on Smart Grid · doi:10.1109/tsg.2023.3286401 · Cited by 186
Ali, J. S., Qiblawey, Y., Alassi, A., Massoud, A. M., Muyeen, S. M., & Abu‐Rub, H. (2025) · IEEE Access · doi:10.1109/access.2025.3546491 · Cited by 117
Physics-guided Deep Learning for Power System State Estimation
Wang, L., Zhou, Q., & Jin, S. (2020) · Journal of Modern Power Systems and Clean Energy · doi:10.35833/mpce.2019.000565 · Cited by 115
Learning Optimal Power Flow: Worst-Case Guarantees for Neural Networks
Venzke, A., Qu, G., Low, S. H., & Chatzivasileiadis, S. (2020) · IEEE International Conference on Communications, Control, and Computing Technologies for Smart Grids (SmartGridComm) · doi:10.1109/smartgridcomm47815.2020.9302963 · Cited by 112
State and Topology Estimation for Unobservable Distribution Systems Using Deep Neural Networks
Azimian, B., Biswas, R. S., Moshtagh, S., Pal, A., Tong, L., & Dasarathy, G. (2022) · IEEE Transactions on Instrumentation and Measurement · doi:10.1109/tim.2022.3167722 · Cited by 111
Self-citationState and Topology Estimation for Unobservable Distribution Systems using Deep Neural Networks
Azimian, B., Biswas, R., Moshtagh, S., Pal, A., Tong, L., & Dasarathy, G. (2021) · IEEE Transactions on Instrumentation and Measurement · doi:10.48550/arxiv.2104.07208 · Cited by 107
Self-citationMultichannel Signal Detection Based on Wald Test in Subspace Interference and Gaussian Noise
Liu, W., Liu, J., Li, H., Du, Q., & Wang, Y.-L. (2019) · IEEE Transactions on Aerospace and Electronic Systems · doi:10.1109/taes.2018.2870445 · Cited by 66
Yusuf, S. S., Kunya, A. B., Abubakar, A. S., & Salisu, S. (2024) · Electrical Engineering · doi:10.1007/s00202-024-02828-4 · Cited by 63
Zhao, J., Wang, S., Mili, L., Amidan, B., Huang, R., & Huang, Z. (2018) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2018.2790390 · Cited by 50
Neural-network-based Power System State Estimation with Extended Observability
Tian, G., Gu, Y., Shi, D., Fu, J., Yu, Z., & Zhou, Q. (2021) · Journal of Modern Power Systems and Clean Energy · doi:10.35833/mpce.2020.000362 · Cited by 46
MMSE-Based Analytical Estimator for Uncertain Power System With Limited Number of Measurements
Bilil, H., & Gharavi, H. (2018) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2018.2801121 · Cited by 38
Algebraic Approach to PMU Placement for Minimum Variance Linear State Estimation in Power Networks
Mishra, A., & CALLAFON, R. A. D. (2022) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2022.3217013 · Cited by 33
Topology-Aware Graph Neural Network-Based State Estimation for PMU-Unobservable Power Systems
Moshtagh, S., Azimian, B., Golgol, M., & Pal, A. (2025) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2025.3572848 · Cited by 31
Self-citationA Survey on Hybrid SCADA/WAMS State Estimation Methodologies in Electric Power Transmission Systems
Darmis, O., & Korres, G. (2023) · Energies · doi:10.3390/en16020618 · Cited by 31
Application of Deep Neural Networks to Distribution System State Estimation and Forecasting
Carmichael, J. P., & Liao, Y. (2022) · Frontiers in Sustainable Cities · doi:10.3389/frsc.2021.814037 · Cited by 18
Learning the Unobservable: High-Resolution State Estimation via Deep Learning
Mestav, K. R., & Tong, L. (2019) · Allerton Conference on Communication, Control, and Computing · doi:10.1109/allerton.2019.8919782 · Cited by 10
Cheeramban Varghese, A., Shah, H., Azimian, B., Pal, A., & Farantatos, E. (2024) · Journal of Modern Power Systems and Clean Energy · doi:10.35833/mpce.2023.000997 · Cited by 10
Self-citationTime-Synchronized State Estimation Using Graph Neural Networks in Presence of Topology Changes
Moshtagh, S., Sifat, A. I., Azimian, B., & Pal, A. (2023) · 2023 North American Power Symposium (NAPS) · doi:10.1109/naps58826.2023.10318579 · Cited by 9
Self-citationApplication of AI and Machine Learning Algorithms in Power System State Estimation
Azimian, B., Biswas, R. S., & Pal, A. (2025) · Wiley eBooks · doi:10.1002/9781394334599.ch5 · Cited by 6
Self-citationGraph topology-constrained BILP for optimal PMU placements
Zhang, P., Sun, Y., Wang, T., Wang, J., & Zhang, W. (2024) · Electric Power Systems Research · doi:10.1016/j.epsr.2024.111291 · Cited by 5
System-Wide Instrument Transformer Calibration and Line Parameter Estimation Using PMU Data
Varghese, A. C., & Pal, A. (2025) · IEEE Transactions on Power Delivery · doi:10.1109/tpwrd.2025.3629006 · Cited by 4
Self-citationA data-driven approach to power system dynamic state estimation
Kumari, D., & Bhattacharyya, S. P. (2017) · 2017 19th International Conference on Intelligent System Application to Power Systems (ISAP) · doi:10.1109/isap.2017.8071371 · Cited by 4
Varghese, A. C., Anguluri, R., & Pal, A. (2026) · IEEE Transactions on Power Delivery · doi:10.1109/tpwrd.2026.3699752 · Cited by 1
Self-citation
Research works printed but not linked: 2
- Azimian, B., Moshtagh, S., Pal, A., & Ma, S. (2023). Analytical verification of performance of deep neural network based time-synchronized distribution system state estimation. Journal of Modern Power Systems and Clean Energy, 12(4), 1126-1134.
- Mendel, J. M. (1995). Lessons in estimation theory for signal processing, communications, and control. Prentice Hall.
Cited by
Still being checked.
Metadata
- Authors
- Moshtagh, S., Thakkar, N., Pal, A., & Farantatos, E.
- Affiliations
- Arizona State University (US)
- Electric Power Research Institute (US)
- Venue
- arXiv
- Publisher
- arXiv
- Published
- 2026
- ISSN
- 2331-8422 (ISSN-L)
- arXiv
- 2609.25566
- OpenAlex
- W7214093354
- Semantic Scholar
- e573231b30fd8f3f3fff2b54b087dc9dd2a06c13
- Cited by
- 0
- References
- 25
- Type
- posted content
- Language
- en
- Open access
- green
- arxiv.org
- Locations
- arXiv (Cornell University) (submittedVersion)
- Funders
- National Science Foundation (2145063)
- U.S. Department of Energy
- Electric Power Research Institute
- Division of Electrical, Communications and Cyber Systems
- Topics
- Physical Sciences › Engineering › Electrical and Electronic Engineering › Power System Optimization and Stability
- Physical Sciences › Engineering › Control and Systems Engineering › Smart Grid Security and Resilience
- Physical Sciences › Engineering › Control and Systems Engineering › Power Systems Fault Detection
- Keywords
- state estimation, phasor measurement units, deep neural network, transmission systems, incomplete observability, real-time situational awareness, hybrid state estimation, estimation accuracy, computational performance
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
A language model drew the claims from the paper on 2026-11-24, under version 3 of the claim definition (model deepseek-v4.1-flash, prompt extract-v3).
A second model labelled each claim on 2026-11-24 (model jev-1.13-20260917, definition revision gold-guideline-v0.2).
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.