Ranking Key Performance Factors in Public Building Construction: Evidence from Gaidakot Municipality, Nepal
Open accessAbstract
ABSTRACT Cost overruns and delays remain major barriers to the successful completion of building construction projects, particularly in developing nations like Nepal. This study explores the root causes of performance variance in public building construction projects in Nepal, specifically within the Gaindakot Municipality, a region noted for its developing infrastructure. Through a strict mixed-methods research approach, the methodology integrates intensive case studies with large questionnaire surveys across a broad cross-section of stakeholders, including contractors, engineers, and local government officials. 55 performance-influencing factors were identified through stakeholder consultation and literature review. They were quantified and ranked in order methodically through use of the Relative Importance Index (RII) based on participant judgment of their influence on project outcomes. The results indicate that contractor inefficiencies such as excessive work slowdowns and site administration inefficiency, economic uncertainty, and administrative delay, are among the most significant drivers of project time and cost variability. The findings provide evidence-based suggestions for improved project management. The study provides actionable suggestions for policymakers and municipal authorities towards directing particular interventions for guaranteeing improved efficiency, timely completion, and cost-effective implementation of projects. Additionally, the implications are beyond Gaindakot, as valuable lessons are transferred to other similar urban settings in other parts of Nepal and developing countries at large, pursuing sustainable development of infrastructure.
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
While [6] identified inflation and bureaucratic bottlenecks as performance barriers, the study's analysis quantifies the specific economic burden of seismic code compliance.
“While [6] identified inflation and bureaucratic bottlenecks as performance barriers, our analysis quantifies the specific economic burden of seismic code compliance, providing essential data for policy development.”
From Implementation Barriers and Socio-Economic Implications of Nepal's Revised Seismic Building Codes: Evidence from Municipalities in PGA 0.35g Zones (2025) · cites this paper as [6]
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Cites
No references could be resolved yet.
Research works printed but not linked: 19
- A. A. Hassan, "Classification of delay factors in construction projects: A comprehensive review," Journal of Construction Project Management and Innovation, vol. 8, no. 2, pp. 112-125, 2018.
- A. Khan, B. Rahman, and C. Ali, "Managing claims and disputes in large-scale civil engineering contracts," International Journal of Project Management, vol. 38, no. 5, pp. 234-245, 2020.
- D. S. Chan, "Theory and implementation of multidimensional discrete systems for signal processing," doctoral diss.., Massachusetts Institute of Technology, Cambridge, MA, 1978.
- J. Smith, A. B. Johnson, and C. D. Williams, "The role of construction industry in global economic development," International Journal of Construction Management, vol. 25, no. 1, pp. 1-15, 2020.
- K. L. Sharma, "Urbanization and infrastructure development in Nepalese municipalities," Journal of Urban Planning and Development, vol. 10, no. 2, pp. 45-60, 2018.
- L. M. Khan and S. R. Ahmed, "Impact of payment delays on contractors' cash flow and project performance," Journal of Financial Management of Property and Construction, vol. 25, no. 1, pp. 78-92, 2020.
- M. A. Rahman and S. K. Islam, "Critical factors causing delays in building construction projects in Bangladesh," Journal of Construction Engineering and Management, vol. 145, no. 6, pp. 04019036, 2019.
- M. Ozaki, Y. Adachi, Y. Iwahori, and N. Ishii, "Application of fuzzy theory to writer recognition of Chinese characters," International Journal of Modelling and Simulation, vol. 18, no. 2, pp. 112-116, 1998.
- M. S. Khan and A. H. Siddiqui, "Stakeholder coordination and its impact on construction project performance," Journal of Construction Project Management and Innovation, vol. 9, no. 1, pp. 20-35, 2019.
- M. S. Ahmed and F. R. Khan, "Socio-economic impacts of construction project delays in developing countries," Journal of Construction Engineering and Management, vol. 146, no. 10, pp. 04020120, 2020.
- P. J. Kumar and S. R. Reddy, "Client-related factors affecting construction project performance," International Journal of Civil Engineering and Technology, vol. 9, no. 1, pp. 100-110, 2018.
- P. K. Adhikari, "Analysis of causes of delay in public sector construction projects in Nepal," Journal of Advanced College of Engineering and Management, vol. 3, pp. 1-10, 2017.
- P. O. Bishop, "Neurophysiology of binocular vision," in J. Houseman (Ed.), Handbook of physiology, vol. 4 (New York: Springer-Verlag, 1970), pp. 342-366.
- R. M. Al-Momani, "Construction delay in Saudi Arabia public construction projects," International Journal of Project Management, vol. 18, no. 3, pp. 191-195, 2000.
- S. K. Das and A. K. Roy, "Major causes of delay in construction projects in India: An empirical study," International Journal of Construction Management, vol. 19, no. 4, pp. 345-356, 2019.
- S. K. Singh and P. K. Gupta, "Analysis of factors causing delays in construction projects: A global perspective," Journal of Engineering, Construction and Architectural Management, vol. 27, no. 3, pp. 678-695, 2020.
- Tavris, C. & Wade, C., 2013. Psychology. 10th ed. Boston: Pearson.
- T. G. Jones and K. L. Brown, "The impact of design errors on construction project cost and schedule," Journal of Engineering, Design and Technology, vol. 15, no. 4, pp. 450-465, 2017.
- W. J. Book, "Modelling design and control of flexible manipulator arms: A tutorial review," in Proc. 29th IEEE Conf. on Decision and Control, San Francisco, CA, 1990, pp. 500-506.
Cited by
Sorted by citations
Sigdel, S. (2025) · Saudi Journal of Civil Engineering · doi:10.36348/sjce.2025.v09i10.001
- Authors
- Kandel, S.
- Corresponding author
- Kandel, Shankar
- Venue
- INTERNATIONAL JOURNAL OF SCIENTIFIC RESEARCH IN ENGINEERING AND MANAGEMENT
- Published
- 2025-05-29
- Volume
- 09
- Issue
- 05
- Pages
- 1-9
- ISSN
- 2582-3930 (ISSN-L)
- OpenAlex
- W4410841563
- Cited by
- 0
- References
- 0
- FWCI
- 0.00
- Type
- journal article
- Language
- en
- Open access
- hybrid
- doi.org
- Licence
- cc-by
- Locations
- INTERANTIONAL JOURNAL OF SCIENTIFIC RESEARCH IN ENGINEERING AND MANAGEMENT (publishedVersion, cc-by)
- Topics
- Social Sciences › Decision Sciences › Management Science and Operations Research › Construction Project Management and Performance
- Social Sciences › Business, Management and Accounting › Strategy and Management › Public-Private Partnership Projects
- Social Sciences › Business, Management and Accounting › Strategy and Management › Value Engineering and Management
- Keywords
- public building construction, construction cost overruns, construction delays, relative importance index, economic uncertainty, bureaucratic delays, municipal infrastructure, project management
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review