The DOI matches its Crossref record; 17 of the 18 references it cites were found in a registry or an index.
Facilitating Transmission Expansion to Support Efficient Decarbonization of the Electricity Sector
Abstract
Many governments, electric utilities, and large electricity consumers have committed to deep decarbonization of the electricity sector by 2050 or earlier. Over at least the next 30 years, achieving decarbonization targets will require replacing most fossil-fueled generators with zero carbon wind and solar generation along with energy storage to manage intermittency and for balancing more broadly. The best wind and solar resources are located in geographic areas that are often far from the locations of the legacy stock of generating plants and their supporting transmission infrastructure. Many studies have found that achieving decarbonization targets in a cost-efficient manner will require significant investments in new intra-regional and inter-regional transmission capacity. However, there are numerous barriers to planning, building, compensating, and financing this transmission capacity. They go beyond "NIMBY" opposition. These barriers are identified and potential reforms to reducing them are discussed here. The focus is on the U.S. and Europe. Comparing and contrasting U.S. and European responses to similar challenges yields suggestions for institutional, regulatory, planning, compensation and cost allocation policies that can reduce the barriers to efficient expansion of transmission capacity.
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“However, the implementation of this provision of Order 1000 has been disappointing (Joskow, 2021).”
From The Expansion of Incentive (Performance-Based) Regulation of Electricity Distribution and Transmission in the United States (2024) · cites this paper as Joskow, 2021
In the citing paper
“Such projects are necessary to facilitate access to the best locations for developing wind and solar generating facilities (Joskow, 2021).”
From The Expansion of Incentive (Performance-Based) Regulation of Electricity Distribution and Transmission in the United States (2024) · cites this paper as Joskow, 2021
Citations
Cites
Demsetz, H. (1972) · doi:10.1007/978-1-349-15486-9_10 · Cited by 989
MERCHANT TRANSMISSION INVESTMENT*
Joskow, P. L., & Jean Tirole, Z. (2003) · Journal of Industrial Economics · doi:10.1111/j.0022-1821.2005.00253.x · Cited by 412
Self-citationThe benefits of cooperation in a highly renewable European electricity network
Schlachtberger, D., Brown, T., Schramm, S., & Greiner, M. (2017) · Energy · doi:10.1016/j.energy.2017.06.004 · Cited by 311
The Value of Inter-Regional Coordination and Transmission in Decarbonizing the US Electricity System
Brown, P. R., & Botterud, A. (2020) · Joule · doi:10.1016/j.joule.2020.11.013 · Cited by 236
Transmission needs across a fully renewable European power system
Rodríguez, R. A., Becker, S., Andresen, G. B., Heide, D., & Greiner, M. (2013) · Renewable Energy · doi:10.1016/j.renene.2013.10.005 · Cited by 230
Tröndle, T., Lilliestam, J., Marelli, S., & Pfenninger, S. (2020) · Joule · doi:10.1016/j.joule.2020.07.018 · Cited by 218
Hörsch, J., & Brown, T. (2017) · International Conference on the European Energy Market (EEM) · doi:10.1109/eem.2017.7982024 · Cited by 120
Cost-optimal power system extension under flow-based market coupling
Hagspiel, S., Jägemann, C., Lindenberger, D., Brown, T., Cherevatskiy, S., & Tröster, E. (2014) · Energy · doi:10.1016/j.energy.2014.01.025 · Cited by 102
Ciupuliga, A. R., & Cuppen, E. H. W. J. (2013) · Energy Policy · doi:10.1016/j.enpol.2013.05.028 · Cited by 80
Design of a High Capacity Inter-Regional Transmission Overlay for the U.S.
Li, Y., & McCalley, J. D. (2014) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2014.2327093 · Cited by 46
Cited by
Sorted by citations
Eicke, A., & Schittekatte, T. (2022) · Energy Policy · doi:10.1016/j.enpol.2022.113220 · Cited by 63
Joskow, P. L. (2024) · Review of Industrial Organization · doi:10.1007/s11151-024-09973-x · Cited by 37
“However, the implementation of this provision of Order 1000 has been disappointing (Joskow, 2021).”
BackgroundInfluentialSelf-citationOliver, M. E., Chapman, O., Grijalva, S., Matisoff, D. C., Ramadhani, M., & West, A. (2025) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2025.116334 · Cited by 24
Carbon-free Electricity Supply in a Cournot Wholesale Market: Israel
Milstein, I., Tishler, A., & Woo, C. K. (2024) · The Energy Journal · doi:10.5547/01956574.45.2.imil · Cited by 17
Transmission Impossible? Prospects for Decarbonizing the US Grid
Davis, L. W., Hausman, C. H., & Rose, N. L. (2023) · National Bureau of Economic Research · doi:10.3386/w31377 · Cited by 17
Regional revenues of solar and wind generation in Texas
Woo, C. K., Zarnikau, J., Tsai, C.-H., Cao, K. H., Qi, H., & Li, R. (2023) · Energy Policy · doi:10.1016/j.enpol.2023.113586 · Cited by 15
Wind project performance with age: Policy, technology, markets, and the maturing wind power industry
Fitzgerald, T., & Giberson, M. (2021) · The Electricity Journal · doi:10.1016/j.tej.2021.107047 · Cited by 15
How price responsive is industrial demand for natural gas in the United States?
Li, R., Woo, C. K., Tishler, A., & Zarnikau, J. (2021) · Utilities Policy · doi:10.1016/j.jup.2021.101318 · Cited by 14
Power Flows: Transmission Lines, Allocative Efficiency, and Corporate Profits
Hausman, C. H. (2024) · National Bureau of Economic Research · doi:10.3386/w32091 · Cited by 11
Price responsiveness of commercial demand for natural gas in the US
Li, R., Woo, C. K., Tishler, A., & Zarnikau, J. (2022) · Energy · doi:10.1016/j.energy.2022.124610 · Cited by 9
Overbuilding transmission: A case study and policy analysis of the Indian power sector
Athawale, R., & Felder, F. A. (2023) · Energy Policy · doi:10.1016/j.enpol.2023.113437 · Cited by 8
40 Years of Incentive Regulation: What Have We Learned, and What Questions Remain?
Sappington, D. E. M., & Weisman, D. L. (2024) · Review of Industrial Organization · doi:10.1007/s11151-024-09974-w · Cited by 7
Electric transmission value and its drivers in United States power markets
Mulvaney-Kemp, J., Millstein, D. E., Gorman, W., Jeong, S., & Wiser, R. H. (2025) · Nature Communications · doi:10.1038/s41467-025-63143-5 · Cited by 7
Matathia, A., & Xydis, G. A. (2022) · International Journal of Emerging Electric Power Systems · doi:10.1515/ijeeps-2022-0018 · Cited by 6
An experiment in own-price elasticity estimation for non-residential electricity demand in the U.S.
Cao, K. H., Qi, H., Li, R., Woo, C. K., Tishler, A., & Zarnikau, J. (2023) · Utilities Policy · doi:10.1016/j.jup.2023.101489 · Cited by 4
Nuclear Power vs. Renewables: a scale perspectivePreprint
Boccard, N. (2021) · SSRN Electronic Journal · doi:10.2139/ssrn.3768026 · Cited by 3
Power Flows: Transmission Lines, Allocative Efficiency, and Corporate ProfitsPreprint
Hausman, C. H. (2024) · SSRN Electronic Journal · doi:10.2139/ssrn.4709144 · Cited by 3
Transmission Impossible? Prospects for Decarbonizing the US GridPreprint
Davis, L. W., Hausman, C. H., & Rose, N. L. (2023) · SSRN Electronic Journal · doi:10.2139/ssrn.4483677 · Cited by 2
Jaeger, S. D., Eyckmans, J., Pepermans, G., & Rousseau, S. (2025) · Utilities Policy · doi:10.1016/j.jup.2025.102111 · Cited by 1
An Experiment of Own-Price Elasticity Estimation Non-Residential Electricity Demands in the U.SPreprint
Cao, K. H., Qi, H., Li, R., Woo, C. K., Tishler, A., & Zarnikau, J. (2022) · SSRN Electronic Journal · doi:10.2139/ssrn.4130129
Over Building Transmission: A Case Study and Policy Analysis of the Indian Power SectorPreprint
Felder, F. A., & Athawale, R. (2022) · SSRN Electronic Journal · doi:10.2139/ssrn.4182294
An interview with Professor Paul Joskow: On grid integration and decarbonization
Caulfield, M. E. (2022) · MIT Science Policy Review · doi:10.38105/spr.hll0k9n15v
Qi, H., Cao, K. H., Woo, C. K., & Li, R. (2023) · The Journal of Energy Markets · doi:10.21314/jem.2023.024
Reading Between the Lines of the IRA + IIJA Power GapsPreprint
Ferrey, S. (2024) · SSRN Electronic Journal · doi:10.2139/ssrn.5030609
Sasson, E., Kádár, J., Zohar, T., Sened, I., Banet, D., & Hamed, T. A. (2025) · Sustainable Energy Research · doi:10.1186/s40807-025-00150-6
The Economics of Integrating Distributed Energy Resources into the Electricity System
Oliver, M. E. (2025) · IntechOpen eBooks · doi:10.5772/intechopen.1009105
Unjust and Unreasonable: Ferc Order No. 1920Preprint
Benjamin, R. M. (2025) · SSRN Electronic Journal · doi:10.2139/ssrn.5252808
Andriuškevičiūtė, K., & Konstantinavičiūtė, I. (2026) · Sustainability · doi:10.3390/su18147092
Küfeoğlu, S. (2026) · Results in Engineering · doi:10.1016/j.rineng.2026.113763
Metadata
- Authors
- Joskow, P. L.
- Corresponding author
- Joskow, Paul L.
- ORCID
- Joskow, Paul L.
- Venue
- Economics of Energy & Environmental Policy
- Published
- 2022-04-01
- Volume
- 10
- Issue
- 2
- ISSN
- 2160-5882 (ISSN-L)
- OpenAlex
- W3202218747
- Cited by
- 29
- References
- 18
- Citations by year
- 2026: 2 · 2025: 6 · 2024: 6 · 2023: 6 · 2022: 6
- FWCI
- 1.54
- Type
- journal article
- Language
- en
- Open access
- closed
- Locations
- Economics of Energy and Environmental Policy (publishedVersion)
- RePEc: Research Papers in Economics (submittedVersion)
- Topics
- Physical Sciences › Engineering › Electrical and Electronic Engineering › Electric Power System Optimization
- Physical Sciences › Engineering › Electrical and Electronic Engineering › Integrated Energy Systems Optimization
- Physical Sciences › Energy › Renewable Energy, Sustainability and the Environment › Renewable energy and sustainable power systems
- Keywords
- transmission expansion, electricity decarbonization, transmission capacity, wind and solar generation, energy storage, transmission planning, cost allocation, transmission regulation, NIMBY opposition, institutional reform
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review