Challenges of mega construction projects in developing countries
Open accessAbstract
Mega Construction Projects (MCPs) represent a strategic option towards achieving sustainable development objectives in developing countries.On the one hand, these projects are charaterised with the need for high design knowledge and technical skills; competent human resources and managerial capabilities as well as excessive cost investment.Conversely, developing countries experience shortage of many of these requirements, which obstruct the development of (MCPs).This paper aims to identify, validate, and classify the challenges of delivering (MCPs) in developing countries.Towards achieving this aim, two approaches were employed, namely literature review and case studies, to accomplish four objectives.• Reviewing the nature and characteristics of developing countries and (MCPs); identifying the challenges of delivering (MCPs) in developing countries and establishing the need for (MCPs) in developing countries.• Validating the challenges identified from Litearture review through collecting and analysing 36 case studies of (MCPs) in developeding countries.Case studies confirmed many of the identified challenges and added new insights that were not covered in current literature.• Classifying the identified clalenges into four categories: engineering challenges, human development challenges, managerial and political challenges and sustainability challenges.• Outlining research conclusions and recommendations useful for delivering successful (MCPs) in developing countries.
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“Developing countries are facing extreme project implementation-related problems, which has become one of the main barriers towards sustainable development [5,6].”
From Blockchain Technology: Potential Applications for Public Sector E-Procurement and Project Management (2022) · cites this paper as [5]
Citations
Cites
(1984) · Cited by 81,983
Case Study Research: Design and Methods
Chaiklin, H. (1991) · The Journal of Nervous and Mental Disease · doi:10.1097/00005053-199102000-00025 · Cited by 39,639
Church, J. A. (2001) · Journal of Government Information · doi:10.1016/s1352-0237(01)00307-0 · Cited by 9,208
Flyvbjerg, B., Bruzelius, N., & Rothengatter, W. (2003) · Cambridge University Press eBooks · doi:10.1017/cbo9781107050891 · Cited by 2,420
Cohen, B. (2005) · Technology in Society · doi:10.1016/j.techsoc.2005.10.005 · Cited by 1,901
Managing public–private megaprojects: Paradoxes, complexity, and project design
van Marrewijk, A. H., Clegg, S. R., Pitsis, T. S., & Veenswijk, M. B. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.09.007 · Cited by 520
Risk, uncertainty and governance in megaprojects: A critical discussion of alternative explanations
Sanderson, J. (2011) · International Journal of Project Management · doi:10.1016/j.ijproman.2011.11.002 · Cited by 316
Managing global megaprojects: Complexity and risk management
Kardes, I., Ozturk, A., Cavusgil, S. T., & Çavuşgil, E. (2013) · International Business Review · doi:10.1016/j.ibusrev.2013.01.003 · Cited by 309
Dams in the Amazon: Belo Monte and Brazil’s Hydroelectric Development of the Xingu River Basin
Fearnside, P. M. (2006) · Environmental Management · doi:10.1007/s00267-005-0113-6 · Cited by 297
Keegan, A. E., & Hartog, D. N. D. (2004) · International Journal of Project Management · doi:10.1016/j.ijproman.2004.05.005 · Cited by 284
Flagged first, then by citations
2 of the 43 references couldn’t be matched to a known paper.
Cited by
Sorted by citations
Banihashemi, S., Hosseini, M. R., Golizadeh, H., & Sankaran, S. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2017.01.014 · Cited by 443
Integrating sustainability indicators into project management: The case of construction industry
Stanitsas, M., Kirytopoulos, K. A., & Leopoulos, V. (2020) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2020.123774 · Cited by 221
Durdyev, S., Ismail, S. B., Ihtiyar, A., Bakar, N. F. S. A., & Darko, A. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.08.304 · Cited by 195
Sustainable Delivery of Megaprojects in Iran: Integrated Model of Contextual Factors
Hosseini, M. R., Banihashemi, S., Martek, I., Golizadeh, H., & Ghodoosi, F. (2017) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000587 · Cited by 121
Ahmad, R., Ahmad, S., Islam, T., & Kaleem, A. (2019) · Employee Relations · doi:10.1108/er-04-2018-0105 · Cited by 97
Köseoğlu, O., Keskin, B., & Özorhon, B. (2019) · Buildings · doi:10.3390/buildings9050115 · Cited by 75
Khattak, M. S., & Mustafa, U. (2019) · Engineering Construction & Architectural Management · doi:10.1108/ecam-05-2017-0079 · Cited by 59
Theoretical review on critical risk factors in oil and gas construction projects in Yemen
Kassem, M. A., Khoiry, M. A., & Hamzah, N. (2020) · Engineering Construction & Architectural Management · doi:10.1108/ecam-03-2019-0123 · Cited by 58
Blockchain Technology: Potential Applications for Public Sector E-Procurement and Project Management
Khalfan, M., Azizi, N., Haass, O., Maqsood, T., & Ahmed, I. (2022) · Sustainability · doi:10.3390/su14105791 · Cited by 57
“Developing countries are facing extreme project implementation-related problems, which has become one of the main barriers towards sustainable development [5,6].”
BackgroundFathalizadeh, A., Hosseini, M. R., Silvius, G., Rahimian, A., Martek, I., & Edwards, D. J. (2021) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2021.128405 · Cited by 64
Stakeholder Engagement in Mega Transport Infrastructure Projects
Erkul, M., Yitmen, İ., & Çelik, T. (2016) · Procedia Engineering · doi:10.1016/j.proeng.2016.08.745 · Cited by 53
Risk factors in oil and gas construction projects in developing countries: a case study
Kassem, M. A., Khoiry, M. A., & Hamzah, N. (2019) · International Journal of Energy Sector Management · doi:10.1108/ijesm-11-2018-0002 · Cited by 51
Gündüz, M., & Abdi, E. A. (2020) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000773 · Cited by 45
Issues in promoting sustainability in mega infrastructure projects: a systematic review
Thounaojam, N., & Laishram, B. S. (2021) · Journal of Environmental Planning and Management · doi:10.1080/09640568.2021.1941810 · Cited by 41
Analysing BIM implementation in the Egyptian construction industry
Marzouk, M. M., Elsaay, H., & Othman, A. A. E. (2021) · Engineering Construction & Architectural Management · doi:10.1108/ecam-07-2020-0523 · Cited by 37
Successful Criteria for Large Infrastructure Projects in Malaysia
Masrom, M. A. N., Rahim, M. H. I. A., Mohamed, S., Chen, G. K., & Yunus, R. (2015) · Procedia Engineering · doi:10.1016/j.proeng.2015.11.021 · Cited by 35
Hwang, B., Shan, M., Zhu, L., & Lim, W.-C. (2018) · International Journal of Construction Management · doi:10.1080/15623599.2018.1484976 · Cited by 31
Megaprojects – An Anatomy of Perception
Delphine, Witte, P., & Spit, T. J. M. (2019) · disP - The Planning Review · doi:10.1080/02513625.2019.1630189 · Cited by 29
Hawken, S., Avazpour, B., Harris, M. S., Marzban, A., & Munro, P. (2021) · Cities · doi:10.1016/j.cities.2020.103068 · Cited by 30
New success factors for construction projects: a systematic review of post-2004 literature
Charles, S. H., Chang-Richards, A. Y., & Yiu, T. W. (2021) · Construction Innovation · doi:10.1108/ci-02-2021-0030 · Cited by 26
Aiyetan, A. O., & Das, D. K. (2022) · Infrastructures · doi:10.3390/infrastructures7020019 · Cited by 25
Amoah, A., & Marimón, F. (2021) · Administrative Sciences · doi:10.3390/admsci11040131 · Cited by 24
Eyiah-Botwe, E., Aigbavboa, C. O., & Thwala, W. D. (2019) · Built Environment Project and Asset Management · doi:10.1108/bepam-01-2018-0035 · Cited by 23
Assessing the Risk Level of the Challenges Faced In Construction Projects
AlAmeri, A., Alhammadi, A. S. A. M., Memon, A. H., Rahman, I. B. A., & Nasaruddin, N. (2021) · Engineering Technology & Applied Science Research · doi:10.48084/etasr.4020 · Cited by 21
Adekunle, P., Aigbavboa, C. O., Akinradewo, O. I., Ikuabe, M. O., & Otasowie, K. (2024) · Buildings · doi:10.3390/buildings14030827 · Cited by 23
Dinh, T. H., Dinh, T. H., & Götze, U. (2020) · International Journal of Sustainable Development and Planning · doi:10.18280/ijsdp.150801 · Cited by 20
Aisheh, Y. I. A. (2021) · Sustainability · doi:10.3390/su131910678 · Cited by 19
Oke, A. E., Kineber, A. F., Olanrewaju, O. I., Omole, O., Singh, P. S. J., Samsurijan, M. S., & Ramli, R. A. (2022) · Sustainability · doi:10.3390/su15010468 · Cited by 19
Complexity, leadership, and megaproject performance: A configuration analysis
Damayanti, R. W., Hartono, B., & Wijaya, A. R. (2021) · Journal of Industrial Engineering and Management · doi:10.3926/jiem.3476 · Cited by 28
Understanding the critical success factors for delivery of megaprojects in Colombia
Cepeda, D. M., Sohail, M., & Ogunlowo, O. O. (2017) · Proceedings of the Institution of Civil Engineers - Management Procurement and Law · doi:10.1680/jmapl.17.00005 · Cited by 17
Suprayoga, G. B., Witte, P., & Spit, T. J. M. (2019) · Impact Assessment and Project Appraisal · doi:10.1080/14615517.2019.1695462 · Cited by 16
Othman, A. A. E. (2014) · The Journal of Engineering Research [TJER] · Cited by 15
Oni, O. Z., Olanrewaju, A., & Khor, S. C. (2022) · Frontiers in Engineering and Built Environment · doi:10.1108/febe-05-2022-0019 · Cited by 14
Analysis of Challenges to BIM Adoption in Mega Construction Projects
Akçay, E. C. (2022) · IOP Conference Series Materials Science and Engineering · doi:10.1088/1757-899x/1218/1/012020 · Cited by 14
Delphine, Witte, P., & Spit, T. J. M. (2020) · Asian Geographer · doi:10.1080/10225706.2020.1750441 · Cited by 13
Leung, M., Wei, X., & Wang, C. (2023) · Journal of Construction Engineering and Management · doi:10.1061/jcemd4.coeng-12990 · Cited by 12
Groundwater Exploitation in Mega Projects: Egypt’s 1.5 Million Feddan Project
Abdelkhalek, A., & King‐Okumu, C. (2021) · Springer water · doi:10.1007/978-3-030-77622-0_14 · Cited by 12
Ashkezari, A. B., Zokaee, M., Aghsami, A., Jolai, F., & Yazdani, M. (2022) · Buildings · doi:10.3390/buildings12050643 · Cited by 12
Othman, M. I. A., & Elsaay, H. (2018) · Journal of Engineering Design and Technology · doi:10.1108/jedt-10-2017-0106 · Cited by 12
Suprayoga, G. B., Witte, P., & Spit, T. J. M. (2020) · Journal of Environmental Planning and Management · doi:10.1080/09640568.2020.1724083 · Cited by 12
Muhwezi, L., Tumusiime, M. F., & Onyutha, C. (2020) · Journal of Civil Construction and Environmental Engineering · doi:10.11648/j.jccee.20200506.12 · Cited by 12
Investigating the Critical Success Factors for Water Supply Projects: Case of Iraq
Al-juboori, O. A., Rashid, H. A., & Mahjoob, A. M. R. (2021) · Civil and Environmental Engineering · doi:10.2478/cee-2021-0046 · Cited by 11
PROJECT FAILURE FACTORS AND THEIR IMPACTS ON THE CONSTRUCTION INDUSTRY: A LITERATURE REVIEW
El-sokhn, H., & Othman, E. (2014) · The International Conference on Civil and Architecture Engineering · doi:10.21608/iccae.2014.44191 · Cited by 11
Infrastructure inequities and its effect on poverty reduction across regional states in Ethiopia
Ambaw, D., & Negussie, S. (2020) · Journal of Mega Infrastructure & Sustainable Development · doi:10.1080/24724718.2022.2122671 · Cited by 10
Alghuried, A. (2025) · Journal of Asian Architecture and Building Engineering · doi:10.1080/13467581.2025.2454616 · Cited by 10
How and when creativity thrives in construction projects: a study of leader's humor
Siddiquei, A. N., Ahmad, S., Badar, K., & Asmi, F. (2023) · Engineering Construction & Architectural Management · doi:10.1108/ecam-08-2022-0792 · Cited by 11
Identifying Construction Managers’ Challenges: A Novel Approach Based on Social Network Analysis
Aghililotf, M., Ramezanianpour, A. M., Arbabi, H., & Maghrebi, M. (2023) · Journal of Construction Engineering and Management · doi:10.1061/jcemd4.coeng-13771 · Cited by 9
Wu, Q., Bo, Q., Luo, L., Yang, C., & Wang, J. (2024) · Engineering Construction & Architectural Management · doi:10.1108/ecam-12-2022-1203 · Cited by 9
Kazar, G., Almhamdawee, A., & Tokdemir, O. B. (2022) · Journal of Construction Engineering Management & Innovation · doi:10.31462/jcemi.2022.02064076 · Cited by 8
Lee, K.-T., Ahn, H., & Kim, J.-H. (2023) · KSCE Journal of Civil Engineering · doi:10.1007/s12205-023-0862-x · Cited by 8
A cautionary approach in transitioning to ‘green’ energy technologies and practices is required
Matatiele, P., & Gulumian, M. (2016) · Reviews on Environmental Health · doi:10.1515/reveh-2016-0004 · Cited by 8
Assessment of Response Strategy in Mega Construction Projects
Mashali, A., Elbeltagi, E. E., Motawa, I. A., & Elshikh, M. M. Y. (2020) · Proceedings of the International Conference on Civil Infrastructure and Construction (CIC 2020) · doi:10.29117/cic.2020.0028 · Cited by 8
Evaluation of the Factors behind the Failure of Project Management Practices
Shabir, R. (2023) · Journal of Development and Social Sciences · doi:10.47205/jdss.2023(4-iii)47 · Cited by 7
Leadership Competency for Megaproject‘s Complexity Management: A Conceptual Study
Damayanti, R. W., Hartono, B., & Wijaya, A. R. (2021) · International Journal of Innovation Management and Technology · doi:10.18178/ijimt.2021.12.4.911 · Cited by 9
Rathnayaka, L. S. D., Nadeetharu, B. K. M., & Kulatunga, U. (2023) · Journal of Financial Management of Property and Construction · doi:10.1108/jfmpc-01-2023-0005 · Cited by 6
Nabawy, M., Egbu, C., & Morcos, M. S. (2018) · Report · doi:10.2749/nantes.2018.s22-11 · Cited by 6
Suprayoga, G. B., Witte, P., & Spit, T. J. M. (2020) · Research in Transportation Business & Management · doi:10.1016/j.rtbm.2020.100562 · Cited by 5
Mwangi, I. G., & Kisimbi, J. M. (2020) · Journal of Entrepreneurship and Project Management · doi:10.47941/jepm.498 · Cited by 4
Factors Contributing to Delay of Interim Payment in Civil Engineering Projects
Ismail, W. N. W., Adnan, H., Azmi, W. F. W. M., Yusop, N., & Isa, S. S. M. (2023) · International Journal of Technology · doi:10.14716/ijtech.v14i4.3370 · Cited by 8
Nguyen, H. D., Dang, C. N., Le‐Hoai, L., & Luu, Q. T. (2021) · International Journal of Construction Management · doi:10.1080/15623599.2021.1937907 · Cited by 4
Cherkos, F. D., & Kifle, K. T. (2025) · Built Environment Project and Asset Management · doi:10.1108/bepam-01-2025-0051 · Cited by 3
Mehrdad, P., Delgoshaei, A., & Ali, A. (2021) · Brazilian Journal of Operations & Production Management · doi:10.14488/bjopm.2021.007 · Cited by 3
Eyiah-Botwe, E., & Aigbavboa, C. O. (2015) · DOAJ (DOAJ: Directory of Open Access Journals) · doi:10.36615/jcpmi.v5i2.92 · Cited by 3
Phelan, A. (2015) · School of Chemistry, Physics & Mechanical Engineering; Science & Engineering Faculty · Cited by 3
IMPROVING CONSTRUCTION PROCESSES IN NIGERIA USING THE LAST PLANNER ® SYSTEM
Ahiakwo, O. (2015) · Wolverhampton Intellectual Repository and E-Theses (University of Wolverhampton) · Cited by 3
Ogano, N. O. (2016) · UpSpace Institutional Repository (University of Pretoria) · Cited by 3
Suprayoga, G. B., & Wargyawati, N. M. G. (2025) · Springer eBooks · doi:10.1007/978-981-97-7521-7_8 · Cited by 2
Grzeszczyk, G., Unterhitzenberger, C., Abdelmegid, M., & Sainati, T. (2025) · Construction Management and Economics · doi:10.1080/01446193.2025.2559646 · Cited by 2
Din, S. U., Ullah, I., Farooq, U., Anwar, S., & Ullah, S. (2023) · Natural and Applied Sciences International Journal (NASIJ) · doi:10.47264/idea.nasij/4.1.10 · Cited by 4
Ismail, W. N. W., Adnan, H., Isa, S. S. M., Jenuwa, N., & Yusop, N. (2024) · PLANNING MALAYSIA · doi:10.21837/pm.v22i31.1452 · Cited by 2
Financıal risk and return analysıs in mega projects: A panel data approach with econometric modeling
Özyeşil, M., & Tembelo, H. (2025) · Investment Management and Financial Innovations · doi:10.21511/imfi.22(3).2025.06 · Cited by 2
Causes of Delays in Mega Projects—Case of the Zambian Transmission Power Projects
Kalebuka, C., Mwanaumo, E., & Thwala, W. D. (2017) · Springer eBooks · doi:10.1007/978-981-10-6190-5_39 · Cited by 2
Othman, A. A. E., & Sokkar, D. A. (2019) · Organization Technology and Management in Construction An International Journal · doi:10.2478/otmcj-2018-0016 · Cited by 2
Factors that Influence the Megaprojects in Iraq
Kareem, H. I. A. (2020) · IOP Conference Series Materials Science and Engineering · doi:10.1088/1757-899x/870/1/012067 · Cited by 2
Megaprojects In Developing Countries And Their Challenges
Nikhaphone, & Jia, G. (2017) · Zenodo (CERN European Organization for Nuclear Research) · doi:10.5281/zenodo.1054568 · Cited by 2
Suprayoga, G. B., Witte, P., Zandvoort, M., Buizer, M., & Spit, T. J. M. (2024) · International Review for Spatial Planning and Sustainable Development · doi:10.14246/irspsd.12.2_221 · Cited by 1
Primary challenges of construction project management in Vietnam’s digital transformation
Tâm, N. V., & Nguyen, Q. T. (2025) · Proceedings of the Institution of Civil Engineers - Municipal Engineer · doi:10.1680/jmuen.25.00070 · Cited by 1
Otim, M. A., Tutesigensi, A., & Mutikanga, H. E. (2025) · Journal of Management in Engineering · doi:10.1061/jmenea.meeng-6956 · Cited by 1
Assessment of factors affecting the performance of construction projects in South Africa
Sibiya, M. (2015) · Cited by 1
Masrom, M. A. N., Rahim, M. H. I. A., Mohamed, S., & Yunus, R. (2015) · Applied Mechanics and Materials · doi:10.4028/www.scientific.net/amm.773-774.1012 · Cited by 1
Daniel, B. M., & Paul, S. N. (2019) · Human Resource and Leadership Journal · doi:10.47941/hrlj.298 · Cited by 2
Bruen, J., Spillane, J. P., & Taylor, S. E. (2020) · Springer eBooks · doi:10.1007/978-3-030-44381-8_9 · Cited by 1
A review of drivers of sustainability in mega infrastructure projects: An institutional approach
Thounaojam, N., Devkar, G. A., & Laishram, B. S. (2022) · World Construction Symposium (WCS) · doi:10.31705/wcs.2022.3 · Cited by 2
Al-Harthi, A. A., Bageis, A. S., & Ingirige, B. (2015) · Cited by 1
Evaluating Building Sustainability Literacy Level in Nigerian Architectural Education
Olagoke, O. A. (2018) · Journal of Sustainable Architecture and Civil Engineering · doi:10.5755/j01.sace.21.4.18620 · Cited by 1
Musonda, I., Gumbo, T., Bwanyire, B., Musakwa, W., Okoro, C. S., & Gil, N. A. (2019) · Cambridge University Press eBooks · doi:10.1017/9781108562492.013 · Cited by 1
Common Contractual Behaviour of Key Participants in Civil Engineering Projects
Universiti Teknologi, M. A. R. A., Ismail, W. N. W., Adnan, H., Universiti Teknologi, M. A. R. A., Ismail, N. A. A., & Universiti Teknologi, M. A. R. A. (2021) · International Journal of Sustainable Construction Engineering Technology · doi:10.30880/ijscet.2021.12.03.022 · Cited by 1
An investigation into construction contracts in Malawi - turnkey versus traditional contracts.
Mshali, R. M. (2016) · UBIR (University of Greater Manchester) · Cited by 1
Otieno, S., & Mbugua, J. (2020) · International Journal of Innovative Research and Development · doi:10.24940/ijird/2020/v9/i2/feb20034
Integrating Sustainability into Road Infrastructure Development
Suprayoga, G. B. (2020) · doi:10.33540/12
Infrastructure Project Selection & Prioritization: Challenges in the Front-End Planning Phase
Hansen, S., Too, E. G., & Le, T. (2021) · International Journal of Structural and Civil Engineering Research · doi:10.18178/ijscer.10.2.55-60
Update, Conclusions, and Recommendations for “Groundwater in Egypt’s Deserts”
Negm, A. M., Omran, E.-S. E., & Elkhouly, A. A. (2021) · Springer water · doi:10.1007/978-3-030-77622-0_17
Resolution of management issues with mega projects
Mhlongo, S. (2019) · doi:10.51415/10321/3547
Waheed, F., Siddique, S., Saha, R., & Ahsan, A. (2022) · International Conference on Control, Decision and Information Technologies (CoDIT) · doi:10.1109/codit55151.2022.9804023
Lean Public Construction in the Project Definition Phase: The Case of Peru
Lujan, G. P., & Murguía, D. (2022) · Annual Conference of the International Group for Lean Construction · doi:10.24928/2022/0173
Effect of Implementing Sustainable Management Practices on Construction Claims Mitigation. (c2022)
Thabet, Z. (2022) · doi:10.26756/th.2022.469 · Cited by 1
Unauthorised Instructions in Civil Engineering Project: Contributing Factors
Ismail, W. N. W., Adnan, H., Masrom, M. A. N., Baharuddin, H. E. A., & Ismail, N. A. (2022) · IOP Conference Series Earth and Environmental Science · doi:10.1088/1755-1315/1067/1/012039
تقييم اداء المهارات الإدارية في تحسين واقع المشاريع الهندسية لديوان محافظة الانبار في العراق
فراس, م. ع., & قانصو, ع. ا. (2023) · Tikrit Journal of Administrative and Economic Sciences · doi:10.25130/tjaes.19.63.1.9
Olojede, B. O. (2024) · Scientific Journal of Silesian University of Technology Series Transport · doi:10.20858/sjsutst.2024.122.14
Thounaojam, N., Chandra, P., Devkar, G. A., & Laishram, B. S. (2025) · Construction Innovation · doi:10.1108/ci-01-2025-0005
Metadata
- Authors
- Ezzat Othman, A. A.
- Venue
- Organization, Technology & Management in Construction: An International Journal
- Published
- 2013-06
- Volume
- 5
- Issue
- 1
- Pages
- 730-746
- ISSN
- 1847-5450 (ISSN-L)
- 1847-6228
- OpenAlex
- W2167777628
- Cited by
- 105
- References
- 43
- Citations by year
- 2026: 2 · 2025: 10 · 2024: 5 · 2023: 10 · 2022: 12 · 2021: 17 · 2020: 15 · 2019: 11 · 2018: 5 · 2017: 5 · 2016: 4 · 2015: 7 · 2014: 2
- FWCI
- 5.92
- Type
- journal article
- Language
- en
- Open access
- green
- hrcak.srce.hr
- Licence
- other-oa
- Locations
- Organization Technology and Management in Construction An International Journal (publishedVersion)
- Hrčak Portal of scientific journals of Croatia (University Computing Centre) (submittedVersion, other-oa)
- Topics
- Social Sciences › Decision Sciences › Management Science and Operations Research › Construction Project Management and Performance
- Social Sciences › Business, Management and Accounting › Strategy and Management › Public-Private Partnership Projects
- Physical Sciences › Engineering › Building and Construction › Construction Management and Sustainability
- Keywords
- megaprojects, developing countries, sustainable development, engineering problems, human resource development, project management challenges, political challenges, sustainability challenges
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review