The DOI matches its Crossref record.
Site Implementation and Assessment of Lean Construction Techniques
Open accessAbstract
The goal of this paper is to test the effectiveness of some lean construction tools, in particular, those tools that can be applied in medium size construction firms. Due to the success of the lean production system in manufacturing, the construction industry has adapted lean techniques to eliminate waste and increase profit. A field study was conducted to evaluate the effectiveness of some lean construction techniques including last planner, increased visualization, daily huddle meetings, first run studies, the 5s process, and fail safe for quality. The data collection methods included direct observations, interviews, questionnaires, and documentary analysis. The effectiveness of the lean construction tools was evaluated through the lean implementation measurement standard and performance criteria. It was found that last planner, increased visualization, daily huddle meetings, and first run studies achieved more effective outcomes than expected. However, the results of implementation of 5s process and fail safe for quality did not meet the expectations of the tool champions and the research team. It was found that there is need for behavioral changes and training for effective use of lean tools. Most of the lean construction tools selected for the project are either ready to use, or are recommended with some modifications. A summary of the results is provided, and future research needs are outlined.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cited by
Lean manufacturing: literature review and research issues
Bhamu, J., & Singh Sangwan, K. (2014) · International Journal of Operations & Production Management · doi:10.1108/ijopm-08-2012-0315 · Cited by 983
Applying lean thinking in construction and performance improvement
Aziz, R. F., & Hafez, S. M. (2013) · Alexandria Engineering Journal · doi:10.1016/j.aej.2013.04.008 · Cited by 513
Implementation of lean practices in the construction industry: A systematic review
Babalola, O., Ibem, E. O., & Ezema, I. C. (2019) · Building and Environment · doi:10.1016/j.buildenv.2018.10.051 · Cited by 270
Effect of lean tools to control external environment risks of construction projects
Ansah, R. H., & Sorooshian, S. (2017) · Sustainable Cities and Society · doi:10.1016/j.scs.2017.03.027 · Cited by 92
Metadata
- Authors
- Salem, O., Solomon, J., Genaidy, A., & Luegering, M.
- Venue
- Lean Construction Journal
- Publisher
- Lean Construction Institute
- Published
- 2005-04-01
- Pages
- 1-21
- ISSN
- 1555-1369 (ISSN-L)
- OpenAlex
- W2110827556
- Cited by
- 190
- References
- 0
- FWCI
- 2.71
- Type
- journal article
- Language
- en
- Open access
- diamond
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Site Implementation and Assessment of Lean Construction Techniques. https://app.cochat.ai/papers/10.60164/e2i9e2h1d
- The paper
- Salem, O., Solomon, J., Genaidy, A., & Luegering, M. (2005). Site Implementation and Assessment of Lean Construction Techniques. Lean Construction Journal. https://doi.org/10.60164/e2i9e2h1d
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.