Stream network modelling using lidar and photogrammetric digital elevation models: a comparison and field verification
The DOI matches its Crossref record; 3 of the 3 references it cites were found in a registry or an index.
Abstract
A conventional, photogrammetrically derived digital elevation model (DEM; 10 m resolution) and a light detection and ranging (lidar)‐derived DEM (1 m resolution) were used to model the stream network of a 193 ha watershed in the Swan Hills of Alberta, Canada. Stream networks, modelled using both hydrologically corrected and uncorrected versions of the DEMs and derived from aerial photographs, were compared. The actual network, mapped in the field, was used as verification. The lidar DEM‐derived network was the most accurate representation of the field‐mapped network, being more accurate even than the photo‐derived network. This was likely due to the greater initial point density, accuracy and resolution of the lidar DEM compared with the conventional DEM. Lidar DEMs have great potential for application in land‐use planning and management and hydrologic modelling. The network derived from the hydrologically corrected conventional DEM was more accurate than that derived from the uncorrected one, but this was not the case with the lidar DEM. Copyright © 2007 John Wiley & Sons, Ltd.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“In addition, the LiDAR DEM produced a delineated watershed area which was 15% larger and with more detailed boundaries, analyzed through a visual inspection, than that derived from the photogrammetric DEM.”
From Sensitivity of watershed attributes to spatial resolution and interpolation method of LiDAR DEMs in three distinct landscapes (2014) · cites this paper as Murphy et al., 2008
In the citing paper
“It was found that the photogrammetric DEM excluded or reduced the length of first-order streams and contained significant spatial errors when compared to GPS field sampled observations.”
From Sensitivity of watershed attributes to spatial resolution and interpolation method of LiDAR DEMs in three distinct landscapes (2014) · cites this paper as Murphy et al., 2008
In the citing paper
“This indicated that the 1 m LiDAR-derived DEM provided the most accurate characterization of the stream network.”
From Sensitivity of watershed attributes to spatial resolution and interpolation method of LiDAR DEMs in three distinct landscapes (2014) · cites this paper as Murphy et al., 2008
In the citing paper
“Despite its drawbacks, the D8 algorithm was maintained for this analysis because it is simple and efficient to execute, which is an important consideration for fine-resolution LiDAR DEMs [Murphy et al., 2008], and is the only option available in ArcHydro software package.”
From Sensitivity of watershed attributes to spatial resolution and interpolation method of LiDAR DEMs in three distinct landscapes (2014) · cites this paper as Murphy et al., 2008
In the citing paper
“Common anthropogenic features which require hydrologic enforcement are roads which pass over culverts and can incorrectly obstruct flow paths [Murphy et al., 2008].”
From Sensitivity of watershed attributes to spatial resolution and interpolation method of LiDAR DEMs in three distinct landscapes (2014) · cites this paper as Murphy et al., 2008
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Digital terrain modelling: A review of hydrological, geomorphological, and biological applications
Moore, I. D., Grayson, R. B., & Ladson, A. R. (1991) · Hydrological Processes · doi:10.1002/hyp.3360050103 · Cited by 3,466
The extraction of drainage networks from digital elevation data
O'Callaghan, J. F., & Mark, D. M. (1984) · Computer Vision, Graphics, and Image Processing · doi:10.1016/s0734-189x(84)80011-0 · Cited by 2,752
Christensen, N. L., Bartuska, A. M., Brown, J. H., Carpenter, S., D'Antonio, C., Francis, R., Franklin, J. F., MacMahon, J. A., Noss, R. F., Parsons, D. J., et al. (1996) · Ecological Applications · doi:10.2307/2269460 · Cited by 1,516 · cited 1×
“…improves land management to avoid operational ‘surprises’ and their associated environmental and financial costs, offering the potential to move these activities towards best-management practices and sustainable management of natural resources (Christensen et al., 1996; Adamowicz and Burton, 2003).”
Background
Research works printed but not linked: 33
- Adamowicz WL, 2003, Towards Sustainable Management of the Boreal Forest, 41
- Andison DW, 2003, Towards Sustainable Management of the Boreal Forest, 433
- Bolstad PV, 1994, An evaluation of DEM accuracy—elevation, slope, and aspect, Photogrammetric Engineering and Remote Sensing, 60, 1327
- 10.4141/S04-008 · doi:10.4141/s04-008
- 10.14358/PERS.69.12.1367 · DOI
- 10.1061/(ASCE)0733-9496(1993)119:2(246) · doi:10.1061/(asce)0733-9496(1993)119:2(246
- 10.1061/(ASCE)1084-0699(2001)6:6(506) · doi:10.1061/(asce)1084-0699(2001)6:6(506
- 10.2136/sssaj2000.6462046x · DOI · Paper page
- 10.1016/S0924-2716(99)00007-6 · doi:10.1016/s0924-2716(99)00007-6
- Gong J, 2000, Effects of various factors on the accuracy of DEMs: an intensive experimental investigation, Photogrammetric Engineering and Remote Sensing, 66, 1113
- 10.1029/2003WR002864 · DOI
- 10.1016/S0034-4257(02)00114-1 · DOI · Paper page
- 10.1029/95RG00288 · DOI
- 10.1002/hyp.3360050104 · DOI · Paper page
- KrogstadF SchiessP.2004.The allure and pitfalls of using LiDAR topography in harvesting and road design. InJoint Conference of IUFRO 3·06 Forest Operations under Mountainous Conditions and the 12th International Mountain Logging Conference Vancouver British Columbia.
- Mackay DS, 2003, Introduction to Forest Ecosystem Science and Management, 337
- 10.5589/m03-031 · DOI
- 10.1029/2000WR000150 · DOI · Paper page
- 10.1002/hyp.3360050102 · doi:10.1002/hyp.3360050102
- Moore ID, 1996, GIS and Environmental Modeling: Progress and Research Issues, 143
- MurphyPNC CastonguayM OgilvieJ ConnorsT ArpPA.2006a.Forest operations planning based on high resolution wet areas mapping: verifications. InInternational Precision Forestry Symposium Stellenbosch South Africa.
- MurphyPNC OgilvieJ CastonguayM ConnorsT MengF‐R ArpPA.2006b.DEM‐derived flow channel and wet area mapping: a new tool for forest operations planning. InSustainable Forest Management Network Fourth International Conference Edmonton AB Canada.
- 10.1061/(ASCE)1084-0699(2001)6:6(515) · doi:10.1061/(asce)1084-0699(2001)6:6(515
- 10.1061/(ASCE)1084-0699(2001)6:6(524) · doi:10.1061/(asce)1084-0699(2001)6:6(524
- 10.1002/hyp.3360050106 · DOI · Paper page
- 10.5589/m03-022 · DOI · Paper page
- SaundersWK.1999.Preparation of DEMs for use in environmental modeling analysis. In1999 ESRI User Conference San Diego California 24–30 July.
- SchiessP KrogstadF DamianF.2004.Locating ditch relief culverts to reduce sediment delivery to streams—an interactive design tool. In12th International Mountain Logging Conference Vancouver.
- St‐OngeDA.1974.The geomorphology of the Swan Hills area Alberta. Paper 74‐26 Geological Survey of Canada Ottawa. · doi:10.4095/102499
- StragerMP FletcherJJ YuillCB.1998.Hydrologic modeling for acid mine drainage in West Virginia. In1998 ESRI International Users Conference San Diego California.
- 10.1002/hyp.3360050107 · DOI · Paper page
- 10.1016/S0924-2716(99)00011-8 · DOI · Paper page
- 10.1016/S0924-2716(99)00013-1 · doi:10.1016/s0924-2716(99)00013-1
Cited by
Impact of DEM accuracy and resolution on topographic indices
Vaze, J., Teng, J., & Spencer, G. (2010) · Environmental Modelling & Software · doi:10.1016/j.envsoft.2010.03.014 · Cited by 333
Topographic modelling of soil moisture conditions: a comparison and verification of two models
Murphy, P. N. C., Ogilvie, J., & Arp, P. (2009) · European Journal of Soil Science · doi:10.1111/j.1365-2389.2008.01094.x · Cited by 193
“…DEM had a resolution of 10 m, a vertical accuracy of 3 m, and was hydrologically corrected to enhance its utility for predicting flow processes (Murphy et al., 2008), particularly in flatter terrain (Clarke & Burnett, 2003) where the subtle differences in elevation which define channels may be…”
BackgroundMethodSelf-citationGoulden, T., Hopkinson, C., Jamieson, R., & Sterling, S. (2014) · Water Resources Research · doi:10.1002/2013wr013846 · Cited by 55
Sensitivity of DEM, Slope, Aspect and Watershed Attributes to LiDAR Measurement Uncertainty
Goulden, T., Hopkinson, C., Jamieson, R., & Sterling, S. (2016) · Remote Sensing of Environment · doi:10.1016/j.rse.2016.03.005 · Cited by 51
Marešová, J., Bašta, P., Gdulová, K., Barták, V., Kozhoridze, G., Šmída, J., Markonis, Y., Rocchini, D., Prošek, J., Pracná, P., et al. (2024) · Earth and Space Science · doi:10.1029/2024ea003743 · Cited by 17
Metadata
- Authors
- Murphy, P. N. C., Ogilvie, J., Meng, F., & Arp, P.
- Venue
- Hydrological Processes
- Publisher
- Wiley
- Published
- 2007-08-08
- Volume
- 22
- Issue
- 12
- Pages
- 1747-1754
- ISSN
- 0885-6087
- 1099-1085
- Cited by
- 123
- References
- 3
- Language
- en
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.