The DOI matches its Crossref record; 25 of the 25 references it cites were found in a registry or an index.
The Relationship between Project Success and Project Efficiency
Abstract
Many researchers have suggested that meeting time, scope, and budget goals, sometimes called ‘project efficiency,’ is not the comprehensive measure of project success. Broader measures of success have been recommended; however, to date, nobody has determined empirically the relationship between efficiency and overall success or indeed shown whether efficiency is important at all to overall project success. Our aim in this article is to correct that omission. Through a survey of 1,386 projects we have shown that project efficiency correlates moderately strongly to overall project success (correlation of 0.6 and R 2 of 0.36). Efficiency is shown through analysis to be neither the only aspect of project success nor an aspect of project success that can be ignored.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Podsakoff, P. M., MacKenzie, S. B., Lee, J.-Y., & Podsakoff, N. P. (2003) · Journal of Applied Psychology · doi:10.1037/0021-9010.88.5.879 · Cited by 82,194
A guide to the project management body of knowledge (PMBOK guide)
Pmbok (2004) · Cited by 4,316
Cooper, D. R., & Schindler, P. S. (1976) · Cited by 4,264
Project management : a systems approach to planning, scheduling, and controlling
Kerzner, H. (1995) · Thammasat University Digital Collections · Cited by 3,099
BUSINESS RESEARCH METHODS (PHƯƠNG PHÁP NGHIÊN CỨU TRONG KINH DOANH)
Le, H. V., & T. T. T., A. (2023) · SSRN Electronic Journal · doi:10.2139/ssrn.4488860 · Cited by 2,550
Project management: A systems approach to planning, scheduling and controlling
Botter, C. H. (1982) · European Journal of Operational Research · doi:10.1016/0377-2217(82)90164-3 · Cited by 2,408
What Reviewers Should Expect from Authors Regarding Common Method Bias in Organizational Research
Conway, J. M., & Lance, C. E. (2010) · Journal of Business and Psychology · doi:10.1007/s10869-010-9181-6 · Cited by 2,392
Atkinson, R. (1999) · International Journal of Project Management · doi:10.1016/s0263-7863(98)00069-6 · Cited by 2,359
The “real” success factors on projects
Cooke-Davies, T. (2002) · International Journal of Project Management · doi:10.1016/s0263-7863(01)00067-9 · Cited by 1,837
The role of project management in achieving project success
Munns, A., & Bjeirmi, B. (1996) · International Journal of Project Management · doi:10.1016/0263-7863(95)00057-7 · Cited by 910
Cited by
Mapping wastes in complex projects for Lean Product Development
Belvedere, V., Cuttaia, F., Rossi, M., & Stringhetti, L. (2019) · International Journal of Project Management · doi:10.1016/j.ijproman.2019.01.008 · Cited by 32
Metadata
- Authors
- Serrador, P., & Turner, R.
- Venue
- Project Management Journal
- Publisher
- SAGE Publications
- Published
- 2015-02
- Volume
- 46
- Issue
- 1
- Pages
- 30-39
- ISSN
- 1938-9507 (ISSN-L)
- 8756-9728
- OpenAlex
- W2011693470
- Cited by
- 296
- References
- 25
- FWCI
- 27.02
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: The Relationship between Project Success and Project Efficiency. https://app.cochat.ai/papers/10.1002/pmj.21468
- The paper
- Serrador, P., & Turner, R. (2015). The Relationship between Project Success and Project Efficiency. Project Management Journal. https://doi.org/10.1002/pmj.21468
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.