Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria
Integrity signals
Registry
Cites
Statistics
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
The success criteria of projects are determined by cost, quality, and time.
“The success criteria of projects are determined by cost, quality, and time [29,30], also called the 'iron or golden triangle'.”
From Blockchain Technology: Potential Applications for Public Sector E-Procurement and Project Management (2022) · cites this paper as [29]
In production, the ideal outcome is often a trade-off between good (quality), fast (time), and cheap (cost), with firms rarely achieving all three.
“In the world of production, the ideal outcome is often a trade-off between good (quality), fast (time), and cheap (cost), with firms rarely achieving all 3.11”
From Outcomes and Complications of the Mustardé Otoplasty: A “Good–Fast–Cheap” Technique for the Prominent Ear Deformity (2020) · cites this paper as [11]
Cites
Information Systems Success: The Quest for the Dependent Variable
DeLone, W. H., & McLean, E. R. (1992) · Information Systems Research · doi:10.1287/isre.3.1.60 · Cited by 10,697 · see citing works
Measurement of project success
de Wit, A. (1988) · International Journal of Project Management · doi:10.1016/0263-7863(88)90043-9 · Cited by 981 · see citing works
Information Systems: A Management Perspective
Alter, S. (1991) · Cited by 540 · see citing works
How can IS/IT projects be measured for success?
Wateridge, J. (1998) · International Journal of Project Management · doi:10.1016/s0263-7863(97)00022-7 · Cited by 476 · see citing works
How the right measures help teams excel
Meyer, C. (1994) · Harvard business review · Cited by 309 · see citing works
Handy, C. (2002) · Medical Entomology and Zoology · Cited by 287 · see citing works
CRITICAL SUCCESS FACTORS ACROSS THE PROJECT LIFE CYCLE
Al-Fahdawi, M. S., Rawi, O. S. A., & Hassan, A. S. (2025) · Journal of Al-Azhar University Engineering Sector · doi:10.21608/auej.2025.336575.1735 · Cited by 259 · see citing works
The 3-D Model of Information Systems Success
Ballantine, J., Bonner, M., Levy, M., Martin, A., Munro, I., & Powell, P. L. (1996) · Information Resources Management Journal · doi:10.4018/irmj.1996100101 · Cited by 161 · see citing works
Time and budget: the twin imperatives of a project sponsor
Wright, J. (1997) · International Journal of Project Management · doi:10.1016/s0263-7863(96)00059-2 · Cited by 94 · see citing works
System development methodology and project success
Saarinen, T., & Saarinen, T. (1990) · Information & Management · doi:10.1016/0378-7206(90)90004-2 · Cited by 69 · see citing works
International Project Management Association global qualification, certification and accreditation
Turner, J. R. (1996) · International Journal of Project Management · doi:10.1016/0263-7863(96)88794-1 · Cited by 57 · see citing works
Project Management Demystified
Reiss, G. (2007) · Routledge eBooks · doi:10.4324/9780203945728 · Cited by 36 · see citing works
Satisfying stakeholders for successful project management
Mallak, L. A., Patzak, G., & Kurstedt, H. A. (1991) · Computers & Industrial Engineering · doi:10.1016/0360-8352(91)90130-x · Cited by 33 · see citing works
Preliminary comparison of six efforts to document the project-management body of knowledge
Wirth, I., & Tryloff, D. E. (1995) · International Journal of Project Management · doi:10.1016/0263-7863(95)00003-9 · Cited by 19 · see citing works
Creating a Learning Project Environment
Deane, R. H., Clark, T. B., & Young, A. P. (1997) · Information Systems Management · doi:10.1080/10580539708907060 · Cited by 18 · see citing works
Flagged first, then by citations
4 of the 19 references couldn’t be matched to a known paper.
Cited by
Sorted by citations
Key performance indicators for measuring construction success
Chan, A. P. C., & Chan, A. P. L. (2004) · Benchmarking An International Journal · doi:10.1108/14635770410532624 · Cited by 971 · see citing works
Does Agile work? — A quantitative analysis of agile project success
Serrador, P. M., & Pinto, J. K. (2015) · International Journal of Project Management · doi:10.1016/j.ijproman.2015.01.006 · Cited by 850 · see citing works
Project Success as a Topic in Project Management Journals
Ika, L. A. (2009) · Project Management Journal · doi:10.1002/pmj.20137 · Cited by 798 · see citing works
Project Success: A Multidimensional Strategic Concept
Shenhar, A. J., Dvir, D., Levy, O., & Maltz, A. C. (2001) · Long Range Planning · doi:10.1016/s0024-6301(01)00097-8 · Cited by 1,222 · see citing works
Fundamental uncertainties in projects and the scope of project management
Atkinson, R., Crawford, L. H., & Ward, S. C. (2006) · International Journal of Project Management · doi:10.1016/j.ijproman.2006.09.011 · Cited by 693 · see citing works
The Project Excellence Model®: linking success criteria and critical success factors
Westerveld, E. (2003) · International Journal of Project Management · doi:10.1016/s0263-7863(02)00112-6 · Cited by 650 · see citing works
Toor, S., & Ogunlana, S. O. (2009) · International Journal of Project Management · doi:10.1016/j.ijproman.2009.05.005 · Cited by 621 · see citing works
Mir, F. A., & Pinnington, A. H. (2013) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.05.012 · Cited by 619 · see citing works
Different stakeholder groups and their perceptions of project success
Davis, K. (2013) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.02.006 · Cited by 534 · see citing works
A Retrospective look at our Evolving Understanding of Project Success
Jugdev, K., & Müller, R. (2005) · Project Management Journal · doi:10.1177/875697280503600403 · Cited by 907 · see citing works
Framework of Success Criteria for Design/Build Projects
Chan, A. P. C., Scott, D. R., & Lam, E. W. M. (2002) · Journal of Management in Engineering · doi:10.1061/(asce)0742-597x(2002)18:3(120 · Cited by 455 · see citing works
Meskendahl, S. (2010) · International Journal of Project Management · doi:10.1016/j.ijproman.2010.06.007 · Cited by 435 · see citing works
Risk management in ERP project introduction: Review of the literature
Aloini, D., Dulmin, R., & Mininno, V. (2007) · Information & Management · doi:10.1016/j.im.2007.05.004 · Cited by 435 · see citing works
Turner, J. R., & Zolin, R. (2012) · Project Management Journal · doi:10.1002/pmj.21289 · Cited by 420 · see citing works
Critical success factors in projects
Müller, R., & Jugdev, K. (2012) · International Journal of Managing Projects in Business · doi:10.1108/17538371211269040 · Cited by 415 · see citing works
Do project managers practice what they preach, and does it matter to project success?
Papke‐Shields, K. E., Beise, C. M., & Quan, J. “. (2009) · International Journal of Project Management · doi:10.1016/j.ijproman.2009.11.002 · Cited by 391 · see citing works
Problems in managing internal development projects in multi-project environments
Elonen, S., & Artto, K. A. (2003) · International Journal of Project Management · doi:10.1016/s0263-7863(02)00097-2 · Cited by 375 · see citing works
Joslin, R., & Müller, R. (2015) · International Journal of Project Management · doi:10.1016/j.ijproman.2015.03.005 · Cited by 359 · see citing works
Risk and risk management in software projects: A reassessment
Bannerman, P. L. (2008) · Journal of Systems and Software · doi:10.1016/j.jss.2008.03.059 · Cited by 357 · see citing works
Sustainable project management through project control in infrastructure projects
Kivilä, J., Martinsuo, M. M., & Vuorinen, L. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2017.02.009 · Cited by 355 · see citing works
Defining ‘success’ for software projects: An exploratory revelation
Agarwal, N., & Rathod, U. (2005) · International Journal of Project Management · doi:10.1016/j.ijproman.2005.11.009 · Cited by 349 · see citing works
Project management education: The human skills imperative
Pant, I., & Baroudi, B. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.05.010 · Cited by 347 · see citing works
Mavi, R. K., & Standing, C. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.05.120 · Cited by 333 · see citing works
Serra, C. E. M., & Kunc, M. H. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2014.03.011 · Cited by 345 · see citing works
Impact of risk management on project performance: the importance of soft skills
de Carvalho, M. M., & Rabechini, R. (2014) · International Journal of Production Research · doi:10.1080/00207543.2014.919423 · Cited by 334 · see citing works
Do Project Managers’ Leadership Competencies Contribute to Project Success?
Geoghegan, L., & Dulewicz, V. (2008) · Project Management Journal · doi:10.1002/pmj.20084 · Cited by 317 · see citing works
Musawir, A. U., Serra, C. E. M., Zwikael, O., & Ali, İ. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2017.07.007 · Cited by 337 · see citing works
Critical success criteria for mass house building projects in developing countries
Ahadzie, D. K., PROVERBS, D. G., & Olomolaiye, P. O. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.09.006 · Cited by 309 · see citing works
Multi-level project governance: Trends and opportunities
Biesenthal, C., & Wilden, R. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2014.06.005 · Cited by 303 · see citing works
The Relationship between Project Success and Project Efficiency
Serrador, P. M., & Turner, J. R. (2015) · Project Management Journal · doi:10.1002/pmj.21468 · Cited by 298 · see citing works
Evaluation and Measurement of Software Process Improvement—A Systematic Literature Review
Unterkalmsteiner, M., Gorschek, T., Islam, A., Cheng, C. K., Permadi, R. B., & FELDT, R. H. (2011) · IEEE Transactions on Software Engineering · doi:10.1109/tse.2011.26 · Cited by 290 · see citing works
Role of single-project management in achieving portfolio management efficiency
Martinsuo, M. M., & Lehtonen, P. (2006) · International Journal of Project Management · doi:10.1016/j.ijproman.2006.04.002 · Cited by 289 · see citing works
Kamali, M. H., & Hewage, K. (2016) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2016.10.108 · Cited by 296 · see citing works
Sauser, B. J., Reilly, R. R., & Shenhar, A. J. (2009) · International Journal of Project Management · doi:10.1016/j.ijproman.2009.01.004 · Cited by 285 · see citing works
The factors influencing the success of on-going agile software development projects
Tam, C., Moura, E. J. D. C., Oliveira, T., & Varajão, J. E. (2020) · International Journal of Project Management · doi:10.1016/j.ijproman.2020.02.001 · Cited by 301 · see citing works
Badewi, A. A. (2015) · International Journal of Project Management · doi:10.1016/j.ijproman.2015.05.005 · Cited by 274 · see citing works
Performance and leadership outcome correlates of leadership styles and subordinate commitment
Limsila, K., & Ogunlana, S. O. (2008) · Engineering Construction & Architectural Management · doi:10.1108/09699980810852682 · Cited by 271 · see citing works
The relationship between project governance and project success
Joslin, R., & Müller, R. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2016.01.008 · Cited by 286 · see citing works
Leadership performance is significant to project success or failure: a critical analysis
Nixon, P., Harrington, M., & Parker, D. (2012) · International Journal of Productivity and Performance Management · doi:10.1108/17410401211194699 · Cited by 256 · see citing works
de Carvalho, M. M., & Rabechini, R. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2017.02.018 · Cited by 268 · see citing works
Maddaloni, F. D., & Davis, K. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2017.08.011 · Cited by 254 · see citing works
Panel studies of new venture creation: a methods-focused review and suggestions for future research
Davidsson, P., & Gordon, S. R. (2011) · Small Business Economics · doi:10.1007/s11187-011-9325-8 · Cited by 252 · see citing works
Social responsibility of major infrastructure projects in China
Zeng, S., Ma, H., Lin, H., Zeng, R. C., & Tam, V. W. Y. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2014.07.007 · Cited by 251 · see citing works
Laursen, M., & Svejvig, P. (2015) · International Journal of Project Management · doi:10.1016/j.ijproman.2015.06.007 · Cited by 257 · see citing works
Benítez-Ávila, C., Hartmann, A., Dewulf, G. P. M. R., & Henseler, J. (2018) · International Journal of Project Management · doi:10.1016/j.ijproman.2017.12.005 · Cited by 249 · see citing works
The “re-meaning” of project success: Updating and recalibrating for a modern project management
Ika, L. A., & Pinto, J. K. (2022) · International Journal of Project Management · doi:10.1016/j.ijproman.2022.08.001 · Cited by 248 · see citing works
Structural Equation Model for Evaluating Factors Affecting Quality of Social Infrastructure Projects
Hussain, S., Fangwei, Z., Siddiqi, A. F., Ali, Z., & Shabbir, M. S. (2018) · Sustainability · doi:10.3390/su10051415 · Cited by 262 · see citing works
Commitment, coordination, competence and the iron triangle
Jha, K. N., & Iyer, K. C. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2006.11.009 · Cited by 243 · see citing works
New Possibilities for Project Management Theory: A Critical Engagement
Cicmil, S., & Hodgson, D. E. (2006) · Project Management Journal · doi:10.1177/875697280603700311 · Cited by 237 · see citing works
Client versus contractor perspectives on project success criteria
Bryde, D., & Robinson, L. (2005) · International Journal of Project Management · doi:10.1016/j.ijproman.2005.05.003 · Cited by 235 · see citing works
Relationships Between Leadership and Success in Different Types of Project Complexities
Müller, R., Geraldi, J. G., & Turner, J. R. (2011) · IEEE Transactions on Engineering Management · doi:10.1109/tem.2011.2114350 · Cited by 235 · see citing works
Future criteria for success of building projects in Malaysia
Al-Tmeemy, S. M. H., Abdul‐Rahman, H., & Harun, Z. (2010) · International Journal of Project Management · doi:10.1016/j.ijproman.2010.03.003 · Cited by 232 · see citing works
Silvius, G., Kampinga, M., Paniagua, S., & Mooi, H. G. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2017.01.011 · Cited by 238 · see citing works
A systems approach for modelling supply chain risks
Ghadge, A., Dani, S., Chester, M., & Kalawsky, R. S. (2013) · Supply Chain Management An International Journal · doi:10.1108/scm-11-2012-0366 · Cited by 226 · see citing works
Project Management Success Factors
Radujković, M., & Sjekavica, M. (2017) · Procedia Engineering · doi:10.1016/j.proeng.2017.08.048 · Cited by 232 · see citing works
What is the Iron Triangle, and how has it changed?
Pollack, J., Helm, J., & Adler, D. R. (2018) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-09-2017-0107 · Cited by 232 · see citing works
Investigating the use of the stakeholder notion in project management literature, a meta-analysis
Achterkamp, M. C., & Vos, J. F. J. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.10.001 · Cited by 221 · see citing works
Ng, S. T., Wong, Y. M. W., & Wong, J. M. W. (2012) · Habitat International · doi:10.1016/j.habitatint.2012.02.002 · Cited by 217 · see citing works
Luo, L., He, Q., Xie, J., Yang, D., & Wu, G. (2016) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000471 · Cited by 215 · see citing works
Unger, B. N., Gemünden, H. G., & Aubry, M. (2012) · International Journal of Project Management · doi:10.1016/j.ijproman.2012.01.015 · Cited by 211 · see citing works
Maylor, H. R. (2001) · European Management Journal · doi:10.1016/s0263-2373(00)00074-8 · Cited by 208 · see citing works
Improving project management performance of large contractors using benchmarking approach
Luu, V. T., Kim, S.-Y., & Huynh, T.-A. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.10.002 · Cited by 208 · see citing works
Linking trust and collaboration in project teams to project management success
Bond-Barnard, T., Fletcher, L., & Steyn, H. (2018) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-06-2017-0068 · Cited by 169 · see citing works
Project complexity and team-level absorptive capacity as drivers of project management performance
Bjorvatn, T., & Wald, A. E. (2018) · International Journal of Project Management · doi:10.1016/j.ijproman.2018.05.003 · Cited by 220 · see citing works
Project Management in the Information Systems and Information Technologies Industries
Hartman, F. T., & Ashrafi, R. (2002) · Project Management Journal · doi:10.1177/875697280203300303 · Cited by 203 · see citing works
Andersen, E. S., Birchall, D. W., Jessen, S. A., & Money, A. H. (2006) · Baltic Journal of Management · doi:10.1108/17465260610663854 · Cited by 200 · see citing works
Dvir, D., Sadeh, A., & Malach‐Pines, A. (2006) · Project Management Journal · doi:10.1177/875697280603700505 · Cited by 210 · see citing works
Formalization of project portfolio management: The moderating role of project portfolio complexity
Teller, J., Unger, B. N., Kock, A., & Gemünden, H. G. (2012) · International Journal of Project Management · doi:10.1016/j.ijproman.2012.01.020 · Cited by 200 · see citing works
Redefining performance measures for construction project managers: an empirical evaluation
Dainty, A., Cheng, M., & Moore, D. (2003) · Construction Management and Economics · doi:10.1080/0144619032000049737 · Cited by 199 · see citing works
Systems thinking in innovation project management: A match that works
Kapsali, M. (2011) · International Journal of Project Management · doi:10.1016/j.ijproman.2011.01.003 · Cited by 193 · see citing works
The Dynamics of Collaboration in Multipartner Projects
Dietrich, P. H., Eskerod, P., Далчер, Д., & Sandhawalia, B. S. (2010) · Project Management Journal · doi:10.1002/pmj.20194 · Cited by 194 · see citing works
The importance of soft skills in complex projects
Azim, S. W., Gale, A., Lawlor‐Wright, T., Kirkham, R., Khan, A. I., & Alam, M. (2010) · International Journal of Managing Projects in Business · doi:10.1108/17538371011056048 · Cited by 192 · see citing works
Toor, S., & Ogunlana, S. O. (2009) · Construction Innovation · doi:10.1108/14714170910950803 · Cited by 190 · see citing works
Factors Affecting Knowledge Transfer in IT Projects
Karlsen, J. T., & Gottschalk, P. (2004) · Engineering Management Journal · doi:10.1080/10429247.2004.11415233 · Cited by 186 · see citing works
Analysing the organizational factors of project complexity using structural equation modelling
Qureshi, S. M., & Kang, C. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2014.04.006 · Cited by 189 · see citing works
Information system development agility as organizational learning
Lyytinen, K., & Rose, G. M. (2006) · European Journal of Information Systems · doi:10.1057/palgrave.ejis.3000604 · Cited by 188 · see citing works
A Perspective-Based Understanding of Project Success
McLeod, L., Doolin, B., & MacDonell, S. G. (2012) · Project Management Journal · doi:10.1002/pmj.21290 · Cited by 187 · see citing works
Competency-Based Model for Predicting Construction Project Managers’ Performance
Dainty, A., Cheng, M., & Moore, D. (2004) · Journal of Management in Engineering · doi:10.1061/(asce)0742-597x(2005)21:1(2 · Cited by 186 · see citing works
25 years of ‘sustainable projects’. What we know and what the literature says
Sabini, L., Muzio, D., & Alderman, N. (2019) · International Journal of Project Management · doi:10.1016/j.ijproman.2019.05.002 · Cited by 184 · see citing works
Perceptions of the impact of project sponsorship practices on project success
Bryde, D. (2008) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.12.001 · Cited by 183 · see citing works
Six decades of project management research: Thematic trends and future opportunities
Padalkar, M., & Gopinath, S. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2016.06.006 · Cited by 183 · see citing works
Chan, A. P. C., & Adabre, M. A. (2019) · Building and Environment · doi:10.1016/j.buildenv.2019.01.029 · Cited by 190 · see citing works
Multi-criteria performance analysis for decision making in project management
Marquès, G., Gourc, D., & Lauras, M. (2010) · International Journal of Project Management · doi:10.1016/j.ijproman.2010.10.002 · Cited by 180 · see citing works
Khosravi, P., Rezvani, A., & Ashkanasy, N. M. (2019) · International Journal of Project Management · doi:10.1016/j.ijproman.2019.11.001 · Cited by 188 · see citing works
The relationship between success criteria and success factors in organisational event projects
Cserháti, G., & Szabó, L. T. (2013) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.08.008 · Cited by 178 · see citing works
Biedenbach, T., & Müller, R. (2012) · International Journal of Project Management · doi:10.1016/j.ijproman.2012.01.016 · Cited by 173 · see citing works
Armenia, S., Dangelico, R. M., Nonino, F., & Pompei, A. (2019) · Sustainability · doi:10.3390/su11092664 · Cited by 173 · see citing works
Soft skills of construction project management professionals and project success factors
Zuo, J., Zhao, X., Nguyen, Q. B. M., Ma, T., & Gao, S. (2018) · Engineering Construction & Architectural Management · doi:10.1108/ecam-01-2016-0016 · Cited by 172 · see citing works
Understanding Project Management Practice through Interpretative and Critical Research Perspectives
Cicmil, S. (2006) · Project Management Journal · doi:10.1177/875697280603700204 · Cited by 170 · see citing works
Modelling project management performance
Bryde, D. (2003) · International Journal of Quality & Reliability Management · doi:10.1108/02656710310456635 · Cited by 169 · see citing works
Complexity, uncertainty-reduction strategies, and project performance
Floricel, S., Michela, J. L., & Piperca, S. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2015.11.007 · Cited by 179 · see citing works
Savolainen, P., Ahonen, J. J., & Richardson, I. (2011) · International Journal of Project Management · doi:10.1016/j.ijproman.2011.07.002 · Cited by 168 · see citing works
Sirisomboonsuk, P., Gu, V. C., Cao, Q. R., & Burns, J. R. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2017.10.003 · Cited by 167 · see citing works
A Bibliometric View on the Use of Contingency Theory in Project Management Research
Hanisch, B., & Wald, A. E. (2012) · Project Management Journal · doi:10.1002/pmj.21267 · Cited by 166 · see citing works
Evaluation of project success: a structured literature review
Albert, M., Balve, P., & Spang, K. (2017) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-01-2017-0004 · Cited by 178 · see citing works
Ahmadabadi, A. A., & Heravi, G. (2018) · Transport Policy · doi:10.1016/j.tranpol.2018.07.004 · Cited by 166 · see citing works
A competency‐based performance model for construction project managers
Dainty, A., Cheng, M., & Moore, D. (2004) · Construction Management and Economics · doi:10.1080/0144619042000202726 · Cited by 164 · see citing works
Systems Engineering to improve the governance in complex project environments
Locatelli, G., Mancini, M., & Romano, E. (2013) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.10.007 · Cited by 164 · see citing works
Zhai, L., Xin, Y., & Cheng, C. (2009) · Project Management Journal · doi:10.1002/pmj.20099 · Cited by 163 · see citing works
Value Management in Project Portfolios: Identifying and Assessing Strategic Value
Martinsuo, M. M., & Killen, C. P. (2014) · Project Management Journal · doi:10.1002/pmj.21452 · Cited by 165 · see citing works
- Authors
- Atkinson, R.
- Affiliations
- Bournemouth University (GB)
- Corresponding author
- Atkinson, Roger
- Venue
- International Journal of Project Management
- Publisher
- Elsevier BV
- Published
- 1999-12
- Volume
- 17
- Issue
- 6
- Pages
- 337-342
- ISSN
- 0263-7863 (ISSN-L)
- OpenAlex
- W2092587332
- Cited by
- 2,359
- References
- 19
- Citations by year
- 2026: 63 · 2025: 90 · 2024: 119 · 2023: 119 · 2022: 150 · 2021: 153 · 2020: 126 · 2019: 145 · 2018: 192 · 2017: 148 · 2016: 166 · 2015: 150 · 2014: 136 · 2013: 122 · 2012: 112
- FWCI
- 7.08
- Type
- journal article
- Language
- en
- Open access
- closed
- Locations
- International Journal of Project Management (publishedVersion)
- Topics
- Social Sciences › Decision Sciences › Management Science and Operations Research › Construction Project Management and Performance
- Physical Sciences › Computer Science › Information Systems › Software Engineering Techniques and Practices
- Social Sciences › Business, Management and Accounting › Management of Technology and Innovation › Economic and Technological Systems Analysis
- Keywords
- project success criteria, iron triangle, cost, time, quality, stakeholder benefits, IT project management, information systems projects, project management framework
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review