Simple heuristics for the assembly line worker assignment and balancing problem
Open accessThe DOI matches its Crossref record; 15 of the 15 references it cites were found in a registry or an index.
Abstract
We propose simple heuristics for the assembly line worker assignment and balancing problem. This problem typically occurs in assembly lines in sheltered work centers for the disabled. Different from the well-known simple assembly line balancing problem, the task execution times vary according to the assigned worker. We develop a constructive heuristic framework based on task and worker priority rules defining the order in which the tasks and workers should be assigned to the workstations. We present a number of such rules and compare their performance across three possible uses: as a stand-alone method, as an initial solution generator for meta-heuristics, and as a decoder for a hybrid genetic algorithm. Our results show that the heuristics are fast, they obtain good results as a stand-alone method and are efficient when used as a initial solution generator or as a solution decoder within more elaborate approaches.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Genetic Algorithms and Random Keys for Sequencing and Optimization
Bean, J. C. (1994) · INFORMS journal on computing · doi:10.1287/ijoc.6.2.154 · Cited by 1,543 · cited 1×
“Bean (1994) introduced random-key genetic algorithms (RKGA).”
A Survey of Exact Algorithms for the Simple Assembly Line Balancing Problem
Baybars, İ. (1986) · Management Science · doi:10.1287/mnsc.32.8.909 · Cited by 1,059
A classification of assembly line balancing problems
Boysen, N., Fliedner, M., & Schöll, A. (2006) · European Journal of Operational Research · doi:10.1016/j.ejor.2006.10.010 · Cited by 888 · cited 1×
“For more details on SALBP and many of its variants, we refer the reader to Baybars (1986), Scholl (1999), Scholl and Becker (2006), Boysen et al. (2007, 2008).”
BackgroundState-of-the-art exact and heuristic solution procedures for simple assembly line balancing
Schöll, A., & Becker, C. (2004) · European Journal of Operational Research · doi:10.1016/j.ejor.2004.07.022 · Cited by 879 · cited 3×
“For more details on SALBP and many of its variants, we refer the reader to Baybars (1986), Scholl (1999), Scholl and Becker (2006), Boysen et al. (2007, 2008).”
BackgroundMethodBalancing and Sequencing of Assembly Lines
Schöll, A. (1999) · Contributions to management science · doi:10.1007/978-3-662-11223-6 · Cited by 752
Assembly line balancing: Which model to use when?
Boysen, N., Fliedner, M., & Schöll, A. (2007) · International Journal of Production Economics · doi:10.1016/j.ijpe.2007.02.026 · Cited by 583 · cited 2×
“Table 3 compares the results of the HGA with the clustering search (CS) of Chaves et al. (2009), the tabu search (TS) of Moreira and Costa (2009), and the iterated beam search (IBS) of Blum and Miralles (2011).”
BackgroundMethodA Comparative Evaluation of Heuristic Line Balancing Techniques
Talbot, F. B., Patterson, J. H., & Gehrlein, W. V. (1986) · Management Science · doi:10.1287/mnsc.32.4.430 · Cited by 296 · cited 1×
“For the SALBP, it is known that breaking ties between tasks of the same priority can have a significant effect on the solution quality (Talbot et al. 1986).”
BackgroundA random key based genetic algorithm for the resource constrained project scheduling problem
Mendes, J. J. D. M., Gonçalves, J. F., & Resende, M. G. C. (2007) · Computers & Operations Research · doi:10.1016/j.cor.2007.07.001 · Cited by 273 · cited 1×
“Random-key genetic algorithms are particularly useful for sequencing problems, and have been proposed by Gonçalves and de Almeida (2004) for the SALBP-1 and, by Mendes et al. (2009) for resource constrained project scheduling.”
BackgroundSimple assembly line balancing?Heuristic approaches
Schöll, A., & Voß, S. (1997) · Journal of Heuristics · doi:10.1007/bf00127358 · Cited by 218 · cited 6×
“Scholl and Voß (1996) where E i and L i are the earliest and latest workstations (defined in Sect.”
BackgroundMethodInfluentialA Hybrid Genetic Algorithm for Assembly Line Balancing
Gonçalves, J. F., & de Almeida, J. R. (2002) · Journal of Heuristics · doi:10.1023/a:1020377910258 · Cited by 205 · cited 1×
“Random-key genetic algorithms are particularly useful for sequencing problems, and have been proposed by Gonçalves and de Almeida (2004) for the SALBP-1 and, by Mendes et al. (2009) for resource constrained project scheduling.”
Background
Research works printed but not linked: 4
- Chaves AA, Miralles C, Lorena LAN (2007) Clustering search approach for the assembly line worker assignment and balancing problem. In: Proc. of the 37th International Conference on Computers and Industrial Engineering, Alexandria, Egypt, pp 1469-1478
- Goldberg DE (1989) Genetic Algorithms in Search, Optimization, and Machine Learning. Addison-Wesley
- Holland JH (1975) Adaptation in Natural and Artifical Systems. MIT Press, Cambrigde, MA.
- Moreira MCO, Costa AM (2009) A minimalist yet efficient tabu search for balancing assembly lines with disabled workers. In: Anais do XLI Simp´ osio Brasileiro de Pesquisa Operacional, Porto Seguro
Cited by
Assembly line balancing: What happened in the last fifteen years?
Boysen, N., Schulze, P., & Schöll, A. (2021) · European Journal of Operational Research · doi:10.1016/j.ejor.2021.11.043 · Cited by 309
A branch-and-bound algorithm for assembly line worker assignment and balancing problems
Vilà, M., & Pereira, J. (2013) · Computers & Operations Research · doi:10.1016/j.cor.2013.10.016 · Cited by 133
“The resulting procedure is capable of optimally solving type-2 instances from the reference set with up to 75 tasks, and it reports better solutions than previous heuristics and exact algorithms if the search is truncated by using a time limit.”
BackgroundMethodResultInfluentialBiased random-key genetic algorithms: A review
Londe, M. A., Pessôa, L. F., Andrade, C. E., & Resende, M. G. C. (2024) · European Journal of Operational Research · doi:10.1016/j.ejor.2024.03.030 · Cited by 120
Borba, L., & Ritt, M. (2013) · Computers & Operations Research · doi:10.1016/j.cor.2013.12.002 · Cited by 117
Self-citationMutlu, Ö., Polat, O., & Supçiller, A. A. (2012) · Computers & Operations Research · doi:10.1016/j.cor.2012.07.010 · Cited by 117
“[4] proposed a constructive heuristic methods for the ALWABP types based on the constructive heuristic for the SALBP-2 presented by Scholl and Voß [17].”
MethodA survey on human resource allocation problem and its applications
Bouajaja, S., & Dridi, N. (2016) · Operational Research · doi:10.1007/s12351-016-0247-8 · Cited by 114
“…of the problem, and presented new models and approaches in order to provide better solutions (Chaves et al. 2007; Zhang et al. 2008a; Miralles et al. 2007, 2008; Blum and Miralles 2011; Araújo et al. 2012, 2014; Moreira et al. 2012, 2015; Borba and Ritt 2013, 2014; Vilà and Pereira 2014).”
MethodAkyol, Ş. D., & Baykasoğlu, A. (2016) · Journal of Intelligent Manufacturing · doi:10.1007/s10845-016-1246-6 · Cited by 100
Polat, O., Kalaycı, C. B., Mutlu, Ö., & Gupta, S. M. (2015) · International Journal of Production Research · doi:10.1080/00207543.2015.1055344 · Cited by 87
“ALWABP is classified as either type I (ALWABP-1) in which the tasks are assigned to workstations with a predefined cycle time in order to minimise the number of workstations or type II (ALWABP-2) in which the tasks are assigned to a predefined number of workstations in order to minimise the cycle time (Moreira et al.…”
BackgroundMethodResultInfluentialRoshani, A., & Giglio, D. (2016) · International Journal of Production Research · doi:10.1080/00207543.2016.1181286 · Cited by 87
“A special class of such problems have been studied by Miralles et al. (2007, 2008), Moreira et al. (2012), Mutlu, Polat, and Supciller (2013), Moreira, Miralles, and Costa (2015), and Zacharia and Nearchou (2016).”
BackgroundAssembly line balancing with hierarchical worker assignment
Sungur, B., & Yavuz, Y. (2014) · Journal of Manufacturing Systems · doi:10.1016/j.jmsy.2014.08.004 · Cited by 80
The assembly line worker assignment and balancing problem with stochastic worker availability
Ritt, M., Costa, A. M., & Miralles, C. (2015) · International Journal of Production Research · doi:10.1080/00207543.2015.1108534 · Cited by 79
“…proposing different extensions and methods to solve it (see for e.g. Miralles et al. 2008; Blum and Miralles 2011; Araújo, Costa, and Miralles 2012; Moreira et al. 2012; Mutlu, Polat, and Ayca 2013; Borba and Ritt 2014; Vila and Pereira 2014; Cortez and Costa 2015; Moreira, Costa, and Miralles…”
MethodSelf-citationZacharia, P. T., & Nearchou, A. C. (2015) · Engineering Applications of Artificial Intelligence · doi:10.1016/j.engappai.2015.11.007 · Cited by 77
Exact and heuristic methods for solving the Robotic Assembly Line Balancing Problem
Borba, L., Ritt, M., & Miralles, C. (2018) · European Journal of Operational Research · doi:10.1016/j.ejor.2018.03.011 · Cited by 77
Self-citationModel and heuristics for the Assembly Line Worker Integration and Balancing Problem
Moreira, M. C. D. O., Miralles, C., & Costa, A. M. (2014) · Computers & Operations Research · doi:10.1016/j.cor.2014.08.021 · Cited by 74
Self-citationRobust assembly line balancing with heterogeneous workers
Moreira, M. C. D. O., Cordeau, J., Costa, A. M., & Gilbert Laporte, A. (2015) · Computers & Industrial Engineering · doi:10.1016/j.cie.2015.07.004 · Cited by 72
“The problem has been tackled by means of heuristics (Chaves et al., 2009; Moreira and Costa, 2009; Blum and Miralles, 2011; Moreira et al., 2012; Mutlu et al., 2013) and exact algorithms (Miralles et al.”
Self-citationErgonomic workplace design in the fast pick area
Otto, A., Boysen, N., Schöll, A., & Walter, R. (2017) · OR Spectrum · doi:10.1007/s00291-017-0479-x · Cited by 70
“Specific planning methods have, e.g., been proposed for ergonomic line balancing (Carnahan et al. 2001; Otto and Scholl 2011; Moreira et al. 2012; Bautista et al. 2013) and the design of job rotation schedules (Carnahan et al. 2000; Costa and Miralles 2009; Otto and Scholl 2012).”
BackgroundThe robust (minmax regret) assembly line worker assignment and balancing problem
Pereira, J. (2018) · Computers & Operations Research · doi:10.1016/j.cor.2018.01.009 · Cited by 63
Two extensions for the ALWABP: Parallel stations and collaborative approach
Araújo, F. F. B., Costa, A. M., & Miralles, C. (2012) · International Journal of Production Economics · doi:10.1016/j.ijpe.2012.06.032 · Cited by 62
Self-citationFlow shop scheduling with heterogeneous workers
Benavides, A. J., Ritt, M., & Miralles, C. (2014) · European Journal of Operational Research · doi:10.1016/j.ejor.2014.02.012 · Cited by 62
Self-citationA memetic algorithm for the cost-oriented robotic assembly line balancing problem
Pereira, J., Ritt, M., & Vásquez, Ó. C. (2018) · Computers & Operations Research · doi:10.1016/j.cor.2018.07.001 · Cited by 61
Self-citationFang, P., Yang, J., Liao, Q., Zhong, R. Y., & Jiang, Y. (2021) · IEEE Transactions on Industrial Informatics · doi:10.1109/tii.2021.3051896 · Cited by 58
Zhang, Z., Tang, Q., Han, D., & Li, Z. (2018) · Neural Computing and Applications · doi:10.1007/s00521-018-3596-9 · Cited by 58
“[25] developed a constructive heuristic framework based on task and worker priority rules for type-II ALWABP.”
MethodMao, Z., Sun, Y., Fang, K., Huang, D. K., & Zhang, J. (2024) · Computers & Operations Research · doi:10.1016/j.cor.2024.106605 · Cited by 55
Fathi, M., Fontes, D. B. M. M., Moris, M. U., & Ghobakhloo, M. (2018) · Journal of Modelling in Management · doi:10.1108/jm2-03-2017-0027 · Cited by 54
Hybrid heuristics for planning job rotation schedules in assembly lines with heterogeneous workers
Moreira, M. C. D. O., & Costa, A. M. (2012) · International Journal of Production Economics · doi:10.1016/j.ijpe.2012.09.011 · Cited by 51
“, 2012), classical metaheuristics such as tabu search (Moreira and Costa, 2009), GRASP (Blum and Miralles, 2011) and Genetic Algorithms (Moreira et al., 2012) and new metaheuristics such as clustering search (Chaves et al.”
BackgroundMethodInfluentialSelf-citationSequencing mixed-model assembly lines operating with a heterogeneous workforce
Cortez, P. M. C., & Costa, A. M. (2014) · International Journal of Production Research · doi:10.1080/00207543.2014.987881 · Cited by 49
“…et al. (2007), a number of articles have been devoted to the assembly line worker assignment and balancing problem (ALWABP) (Blum and Miralles 2011, Moreira et al. 2012, Mutlu et al. 2013, Vil`a and Pereira 2014, Borba and Ritt 2014) and to variants of it including job rotation objectives (Costa…”
BackgroundInfluentialSelf-citationJanardhanan, M. N., Li, Z., & Nielsen, P. (2018) · Soft Computing · doi:10.1007/s00500-018-03684-8 · Cited by 47
Balancing parallel assembly lines with disabled workers
Araújo, F. F. B., Costa, A. M., & Miralles, C. (2015) · European J of Industrial Engineering · doi:10.1504/ejie.2015.069343 · Cited by 46
Self-citationLiu, Z., Liu, J., Zhuang, C., & Wan, F. (2022) · Journal of Manufacturing Systems · doi:10.1016/j.jmsy.2022.05.003 · Cited by 46
The multi-objective assembly line worker integration and balancing problem of type-2
Moreira, M. C. D. O., Pastor, R., Costa, A. M., & Miralles, C. (2017) · Computers & Operations Research · doi:10.1016/j.cor.2017.01.003 · Cited by 45
“The task assignment phase of the WRCH is based on the ALWABP-2 constructive heuristic (CH) proposed by Moreira et al. (2012).”
MethodSelf-citationKaras, A., & Özçelik, F. (2021) · Computers & Industrial Engineering · doi:10.1016/j.cie.2021.107195 · Cited by 44
Akyol, Ş. D., & Baykasoğlu, A. (2016) · Journal of Intelligent Manufacturing · doi:10.1007/s10845-016-1262-6 · Cited by 40
“Moreira et al. (2015) introduced the Assembly Line Worker Integration and Balancing Problem (ALWBP) which contains assembly lines with normal operators and disabled workers simultaneously. They introduced benchmark data andpresentedmathematicalmodels andheuristicmethodologies in order to solve the newly proposed probl…”
BackgroundMethodInfluentialMulti-manned Assembly Line Balancing Problem with Skilled Workers: A New Mathematical Formulation
Giglio, D., Paolucci, M., Roshani, A., & Tonelli, F. (2017) · IFAC-PapersOnLine · doi:10.1016/j.ifacol.2017.08.344 · Cited by 39
Advances in partial disassembly line balancing: A state-of-the-art review
Güler, E., Kalaycı, C. B., Ilgın, M. A., Özceylan, E., & Güngör, A. (2024) · Computers & Industrial Engineering · doi:10.1016/j.cie.2024.109898 · Cited by 38
An adaptive BPSO algorithm for multi-skilled workers assignment problem in aircraft assembly lines
Xin, B., Li, Y., Yu, J., & Zhang, J. (2015) · Assembly Automation · doi:10.1108/aa-06-2015-051 · Cited by 36
Quenehen, A., Klement, N., Abdeljaouad, M. A., Roucoules, L., & Gibaru, O. (2022) · International Journal of Production Research · doi:10.1080/00207543.2022.2039795 · Cited by 32
“…be seen as a particular case of heterogeneous manpower, which has been further studied in ALWABP (Assembly Line Worker Assignment Balancing Problem), with application towards Sheltered Work Centres for Disabled (Moreira et al. 2015; Borba and Ritt 2014; Moreira et al. 2012; Miralles et al. 2007).”
MethodCampana, N. P., Iori, M., & Moreira, M. C. D. O. (2021) · International Journal of Production Research · doi:10.1080/00207543.2021.1884767 · Cited by 31
“…search by Chaves, Miralles, and Lorena (2007), beam search by Blum andMiralles (2011), tabu search by Moreira and Costa (2009), genetic algorithms by Moreira et al. (2012), Mutlu, Polat, and Supciller (2013) and Moreira and Ritt (2019), and variable neighbourhood search by Polat et al. (2016).”
Self-citationSurvey on applications of biased-random key genetic algorithms for solving optimization problems
Prasetyo, H., Fauza, G., Amer, Y. M., & Lee, S. (2015) · IEEE International Conference on Industrial Engineering and Engineering Management (IEEM) · doi:10.1109/ieem.2015.7385771 · Cited by 30
“7 [27] C LSP p = 100 | pe = N/A | pm = N/A | e = 0.”
MethodIşık, E. E., & Topaloğlu, Ş. (2023) · International Journal of Production Research · doi:10.1080/00207543.2023.2290699 · Cited by 21
“Moreira et al. (2012)used a constructive heuristic approach hybridised with a biased random-key genetic algorithm.”
MethodÖzcan, U., Aydoğan, E. K., Himmetoğlu, S., & Delice, Y. (2022) · Applied Soft Computing · doi:10.1016/j.asoc.2022.109727 · Cited by 21
Yılmaz, H. (2021) · Soft Computing · doi:10.1007/s00500-021-06107-3 · Cited by 20
“Moreira et al. have introduced a constructive heuristic based on priority rules of task-worker (Moreira et al. 2012).”
BackgroundMethodTian, B., Kaul, H., & Janardhanan, M. N. (2024) · Swarm and Evolutionary Computation · doi:10.1016/j.swevo.2024.101762 · Cited by 19
Model and heuristics for the multi-manned assembly line worker integration and balancing problem
Michels, A. S., & Costa, A. M. (2024) · International Journal of Production Research · doi:10.1080/00207543.2024.2347572 · Cited by 18
“An example of a fast heuristic is presented in Moreira et al. (2012), in which priority rules are defined for both task and worker assignments.”
Self-citationGhorbani, E., Keivanpour, S., Sekkay, F., & Imbeau, D. (2024) · Journal of Industrial and Production Engineering · doi:10.1080/21681015.2024.2389963 · Cited by 18
“There have been several hybrid methods for solving ALWABP-2 as well such as clustering-based heuristic approach [25], hybrid clustering algorithm and iterated local search (ILS) [26], constructive heuristic approach via GA [27], and two-phase variable neighborhood search (VNS) algorithm [28].”
The Fuzzy Assembly Line Worker Assignment and Balancing Problem
Zacharia, P. T., & Nearchou, A. C. (2020) · Cybernetics & Systems · doi:10.1080/01969722.2020.1840144 · Cited by 17
Gonçalves, J. F., & Resende, M. G. C. (2018) · Springer eBooks · doi:10.1007/978-3-319-07124-4_30 · Cited by 15
Wu, L., Cai, F., Li, L., & Chu, X. (2018) · Mathematical Problems in Engineering · doi:10.1155/2018/4302062 · Cited by 14
Gonçalves, J. F., & Resende, M. G. C. (2016) · Springer eBooks · doi:10.1007/978-3-319-07153-4_30-1 · Cited by 13
Early years of biased random-key genetic algorithms: a systematic review
Londe, M. A., Pessoa, L. S., Andrade, C. E., & Resende, M. G. C. (2024) · Journal of Global Optimization · doi:10.1007/s10898-024-01446-5 · Cited by 14
“The study from Moreira, Ritt, Costa, and Chaves (2012) introduces an assembly line worker assignment and balancing problem.”
BackgroundZacharia, P. T., & Nearchou, A. C. (2021) · Engineering Computations · doi:10.1108/ec-09-2020-0507 · Cited by 12
Exact and heuristic methods for a workload allocation problem with chain precedence constraints
Pereira, J., & Ritt, M. (2022) · European Journal of Operational Research · doi:10.1016/j.ejor.2022.12.035 · Cited by 12
Self-citationPabolu, V. K. R., Shrivastava, D., & Kulkarni, M. S. (2024) · Journal of Manufacturing Systems · doi:10.1016/j.jmsy.2024.11.016 · Cited by 11
Fagan, F., & van Vuuren, J. H. (2013) · International Journal of Metaheuristics · doi:10.1504/ijmheur.2013.056407 · Cited by 8
A NEW LOOK AT THE BOWL PHENOMENON
Castellucci, P. B., & Costa, A. M. (2015) · Pesquisa Operacional · doi:10.1590/0101-7438.2015.035.01.0057 · Cited by 8
“This problem has fomented an intense amount of research both on the original problem (Blum & Miralles 2011, Moreira et al. 2012, Mutlu et al. 2013, Vilà & Pereira 2014, Borba & Ritt 2014) and on its variants (Costa & Miralles 2009, Araújo et al. 2012, Moreira & Costa 2013, Araújo et al. 2014).”
BackgroundSelf-citationExact and Heuristic Methods for the Assembly Line Worker Assignment and Balancing ProblemPreprint
Borba, L., & Ritt, M. (2013) · arXiv (Cornell University) · doi:10.48550/arxiv.1308.0299 · Cited by 8
Self-citationOn The Assembly Line Balancing Problem: A Simplified Perspective With The Precedence Matrix
Helal, M., Nag, K., & Özdemir, R. G. (2024) · Journal of Applied Engineering and Technological Science (JAETS) · doi:10.37385/jaets.v6i1.5597 · Cited by 7
Conserving workforce while temporarily rebalancing assembly lines under demand disruption
Michels, A. S., & Costa, A. M. (2021) · International Journal of Production Research · doi:10.1080/00207543.2021.1998694 · Cited by 7
“Moreira et al. (2012) assign tasks and workers to stations depending on proposed priority rules, followed by Mutlu, Polat, and Supciller (2013) obtaining new best solutions with a reduced computational processing time.”
BackgroundMethodSelf-citationPossan, M. C., Michels, A. S., & Magatão, L. (2024) · Expert Systems with Applications · doi:10.1016/j.eswa.2024.125294 · Cited by 7
Assembly Line Worker Assignment and Balancing Problem with Positional Constraints
Yang, H., Lee, J.-H., & Kim, H.-J. (2021) · IFIP advances in information and communication technology · doi:10.1007/978-3-030-85914-5_1 · Cited by 7
A Risk-averse Assembly Line Worker Assignment and Balancing Problem with Uncertain Processing Time
Liu, M., Liang, B., & Chu, F. (2019) · International Conference on Industrial Engineering and Systems Management · doi:10.1109/iesm45758.2019.8948211 · Cited by 7
“In heuristic methods, [7], [8] and [9] introduce several genetic algorithms to resolve the ALWABP.”
MethodMellouli, A., Mellouli, R., Triki, H., & Faouzi Masmoudi, A. (2024) · Annals of Operations Research · doi:10.1007/s10479-024-06071-9 · Cited by 6
A New Mathematical Model for Assembly Line Worker Assignment and Balancing
Yılmaz, H., & DEMİR, Y. (2019) · Iğdır Üniversitesi Fen Bilimleri Enstitüsü Dergisi · doi:10.21597/jist.579958 · Cited by 6
Research on the optimal parameters of ACO algorithm for a human resource allocation problem
Bouajaja, S., & Dridi, N. (2015) · IEEE International Conference on Service Operations and Logistics, and Informatics (SOLI) · doi:10.1109/soli.2015.7367412 · Cited by 5
Evolving task priority rules for heterogeneous assembly line balancing
Moreira, J. P. G., & Ritt, M. (2019) · IEEE Congress on Evolutionary Computation (CEC) · doi:10.1109/cec.2019.8790332 · Cited by 5
“In heuristics this is usually a lower Algorithm 1: A SAP for the ALWABP-2.”
BackgroundMethodResultSelf-citationYILDIZ, Ş. T., YILDIZ, G., & CİN, E. (2020) · Afyon Kocatepe Üniversitesi İktisadi ve İdari Bilimler Fakültesi Dergisi · doi:10.33707/akuiibfd.645402 · Cited by 4
Bi-criteria Assembly Line Worker Assignment and Balancing Problem by Considering Labor Cost
Yılmaz, H. (2021) · Journal of Innovative Science and Engineering (JISE) · doi:10.38088/jise.902395 · Cited by 3
Yener, Y., & Can, G. F. (2022) · BOHR International Journal of Advances in Management Research · doi:10.54646/bijamr.2022.07 · Cited by 3
Mirabedini, S. N., Mina, H., Iranmanesh, S. H., & Pay, B. S. (2013) · Research Journal of Applied Sciences Engineering and Technology · doi:10.19026/rjaset.6.3795 · Cited by 3
“…(2006) Becker et al. (2006) Yoosefelahi et al. (2012) Corominas et al. (2008) Manitz (2008) Sabuncuoglu et al. (2009) Boysen et al. (2012) Hamta et al. (2012) Moreira et al. (2012) The main difference of U-Shape with SALB is the direction of task’s movement and the way we assign tasks to stations.”
BackgroundBorba, L., Rolf, M., & Ritt, P. (2012) · Cited by 3
Scheduling Workforce in Decentrally Controlled Production Systems: A Literature Review
Schwemmer, J., Kühn, M., Völker, M., & Schmidt, T. (2022) · Lecture notes in logistics · doi:10.1007/978-3-031-05359-7_32 · Cited by 3
ŞAHİN, M. (2026) · Journal of Industrial and Management Optimization · doi:10.3934/jimo.2026058 · Cited by 2
Michels, A. S., & Costa, A. M. (2020) · Journal of Intelligent Manufacturing · doi:10.1007/s10845-020-01632-8 · Cited by 2
Self-citationIncluding workers with disabilities in flow shop scheduling
Carniel, G. C., Benavides, A. J., Ritt, M., & Miralles, C. (2015) · IEEE International Conference on Automation Science and Engineering (CASE) · doi:10.1109/coase.2015.7294227 · Cited by 2
“This problem is NP-hard and research has focused mainly on heuristic methods for solving it [3]–[6] but effective exact solution techniques are available [7], [8].”
BackgroundSelf-citationBalancing Assembly Lines and Matching Demand Through Worker Reallocations
Pérez-Wheelock, R. M., & Huynh, V. (2018) · Lecture notes in computer science · doi:10.1007/978-3-030-00202-2_17 · Cited by 2
Çevikcan, E., & Durmuşoğlu, M. B. (2020) · Assembly Automation · doi:10.1108/aa-02-2019-0020 · Cited by 2
Sormaz, D. N., & Sarı, E. B. (2023) · Springer eBooks · doi:10.1007/978-3-031-36121-0_78 · Cited by 2
HİYERARŞİK İŞÇİ ATAMASI İLE TİP-II MONTAJ HATTI DENGELEME PROBLEMİ İÇİN BİR MATEMATİKSEL MODEL
Çelik, A. K., & Özçelik, F. (2023) · Endüstri Mühendisliği · doi:10.46465/endustrimuhendisligi.1333382 · Cited by 1
Sarı, E. B., & Akyol, Ş. D. (2024) · Gazi Üniversitesi Mühendislik-Mimarlık Fakültesi Dergisi · doi:10.17341/gazimmfd.1220997 · Cited by 1
Türkkan, Y. A., & Yılmaz, H. (2026) · Mathematics · doi:10.3390/math14060927 · Cited by 1
Research on Multi-objective Project Scheduling Model Based on Multi-skilled Workers
Zhaoyue, Z., Zhenqiang, B., Yun, K., & Zhu, Y. (2019) · IOP Conference Series Materials Science and Engineering · doi:10.1088/1757-899x/569/5/052004 · Cited by 1
Kurada, G., & Deliktaş, D. (2024) · Journal of Scientific Reports-A · doi:10.59313/jsr-a.1354104 · Cited by 1
Baltazar, I. Á., Ramírez, I. G., Medina, O. D. A., Manzo, J. C., & Zárate, I. M. (2024) · Ciencia Latina Revista Científica Multidisciplinar · doi:10.37811/cl_rcm.v8i6.15132 · Cited by 1
Işık, S., Dinler, E., & Aydemir-Karadag, A. (2025) · International Journal of Systems Science Operations & Logistics · doi:10.1080/23302674.2025.2456212 · Cited by 1
Balanceamento de linhas de produção com trabalhadores deficientes
Moreira, M. C. D. O. (2011) · Digital Library of Theses and Dissertations (Universidade de São Paulo) · doi:10.11606/d.55.2011.tde-18052011-150310 · Cited by 1
Self-citationProblema de balanceamento de linhas de produção e integração de trabalhadores
Moreira, M. C. D. O. (2016) · Digital Library of Theses and Dissertations (Universidade de São Paulo) · doi:10.11606/t.55.2016.tde-08012016-145627 · Cited by 1
Self-citationSimulation model for assembly lines with heterogeneous workersPreprint
Castellucci, P. B., & Costa, A. M. (2012) · arXiv (Cornell University) · Cited by 1
Self-citationAssembly Line Worker Integration and Balancing Problem
Moreira, M., Costa, A. M., & Miralles, C. (2012) · LA Referencia (Red Federada de Repositorios Institucionales de Publicaciones Científicas) · Cited by 1
Self-citationVilà, M. (2014) · UPCommons institutional repository (Universitat Politècnica de Catalunya) · doi:10.5821/dissertation-2117-95590 · Cited by 1
Guo, H., Liu, J., Qinglin, G., Shi, J., & Zhuang, C. (2023) · SSRN Electronic Journal · doi:10.2139/ssrn.4594985 · Cited by 1
Balancing reconfigurable or robotic assembly lines : exact and hybrid methods
Lahrichi, Y. (2021) · theses.fr (ABES) · doi:10.70675/0114ebf8zc9ecz4af2z8736z68d00c0ab0f3 · Cited by 1
Holistic approach to designing hybrid assembly lines
Oesterle, J. (2017) · theses.fr (ABES) · doi:10.70675/4e01969fz4e0cz47c0zb125zcb5e3a681bec · Cited by 1
Quenehen, A. (2022) · theses.fr (ABES) · doi:10.70675/29f49e2ez40f8z4774zb5b7zc79c2636148e · Cited by 1
Assessment of Production Costs in Toyota Production System Simulation Based on Makespan
MANGNGENRE, S., INDAH, A. B. R., IKASARY, D., HAMZI, A., & NOVAWANDA, O. (2025) · Management and Production Engineering Review · doi:10.24425/mper.2025.156146
“These findings support the argument Moreira et al. (2012) that optimization in manufacturing often involves multidimensional trade-offs.”
Balanceamento e sequenciamento de linhas de produção multi-modelo com trabalhadores deficientes
Cortez, P. M. C. (2012) · Digital Library of Theses and Dissertations (Universidade de São Paulo) · doi:10.11606/d.55.2012.tde-12062012-103221
“Em um trabalho subsequente, Moreira et al. (2012) ampliam o número de critérios usados nas heurísticas e propõem um algoritmo genético do tipo biased random-key, obtendo vários dos melhores resultados conhecidos atualmente.”
BackgroundKodakkat, N. K. (2013) · NCSU Libraries Repository (North Carolina State University Libraries)
Fauza, G. (2017) · Adelaide Research & Scholarship (AR&S) (University of Adelaide)
Exact and heuristic methods for heterogeneous assembly line balancing problems of type 2.
Borba, L. (2018) · Americanae (AECID Library)
Evolving Allocation Rules for Beam Search Heuristics in Assembly Line Balancing
Moreira, J. P. G., & Ritt, M. (2021) · Lecture notes in computer science · doi:10.1007/978-3-030-72812-0_14
Self-citationBalanceamento de linhas de produção usando regras de seleção descobertas por Genetic Programming
Moreira, J. P. G. (2020) · Lume (Universidade Federal do Rio Grande do Sul)
An Artificial Bee Colony Algorithm for Assembly Line Worker Assignment and Balancing Problem
Çelik, A. K., & Özçelik, F. (2022) · International Conference on Industrial & Mechanical Engineering and Operations Management (IMEOM) · doi:10.46254/bd05.20220116
“Moreira et al. (2012) presented a heuristic approach based on the assignment priority rules and hybridized t hese rules with a genetic algorithm.”
BackgroundMethod
Metadata
- Authors
- Moreira, M. C. O., Ritt, M., Costa, A. M., & Chaves, A. A.
- Affiliations
- Universidade de São Paulo (BR)
- Universidade Federal do Rio Grande do Sul (BR)
- Universidade Estadual Paulista (Unesp) (BR)
- Corresponding author
- Ritt, Marcus
- ORCID
- Ritt, Marcus
- Venue
- Journal of Heuristics
- Published
- 2012-02-29
- Volume
- 18
- Issue
- 3
- Pages
- 505-524
- ISSN
- 1381-1231 (ISSN-L)
- 1572-9397
- OpenAlex
- W1710954067
- Cited by
- 95
- References
- 15
- Citations by year
- 2026: 2 · 2025: 1 · 2024: 14 · 2023: 4 · 2022: 8 · 2021: 10 · 2020: 5 · 2019: 4 · 2018: 10 · 2017: 3 · 2016: 6 · 2015: 10 · 2014: 5 · 2013: 5 · 2012: 7
- FWCI
- 21.23
- Type
- journal article
- Language
- en
- Open access
- green
- arxiv.org
- Licence
- www.springer.com/tdm (tdm)
- Locations
- Journal of Heuristics (publishedVersion)
- Scientific Electronic Library Online (São Paulo Research Foundation, Latin American and Caribbean Center on Health Sciences Information, Conselho Nacional de Desenvolvimento Científico e Tecnológico) (publishedVersion)
- arXiv (Cornell University) (submittedVersion)
- Acervo Digital da Universidade Estadual Paulista (Universidade Estadual Paulista) (submittedVersion)
- UNESP Institutional Repository (São Paulo State University) (submittedVersion)
- arXiv (Cornell University)
- Topics
- Physical Sciences › Engineering › Industrial and Manufacturing Engineering › Assembly Line Balancing Optimization
- Physical Sciences › Engineering › Industrial and Manufacturing Engineering › Scheduling and Optimization Algorithms
- Social Sciences › Decision Sciences › Management Science and Operations Research › Scheduling and Timetabling Solutions
- Keywords
- assembly line balancing, job assignment, disabled workers, constructive heuristics, initial solution generation, hybrid genetic algorithm
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.