Review of job shop scheduling research and its new perspectives under Industry 4.0
The DOI matches its Crossref record; 56 of the 56 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Optimization by Simulated Annealing
Kirkpatrick, S., Gelatt, C. D., & Vecchi, M. P. (1983) · Science · doi:10.1126/science.220.4598.671 · Cited by 45,134
Storn, R., & Price, K. (1997) · Journal of Global Optimization · doi:10.1023/a:1008202821328 · Cited by 29,569
Particle swarm optimization: An overview
Poli, R., Kennedy, J., & Blackwell, T. (2007) · Swarm Intelligence · doi:10.1007/s11721-007-0002-0 · Cited by 21,101
Glover, F., & Laguna, M. (1997) · Cited by 5,679
Nature-Inspired Metaheuristic Algorithms
Yang, X. (2008) · Medical Entomology and Zoology · Cited by 4,556
Future paths for integer programming and links to artificial intelligence
Glover, F. (1986) · Computers & Operations Research · doi:10.1016/0305-0548(86)90048-1 · Cited by 4,181
Price, K. V. (2004) · Cited by 3,344
Optimization, Learning and Natural Algorithms
Dorigo, M. (1992) · Medical Entomology and Zoology · Cited by 3,307
Optimal two‐ and three‐stage production schedules with setup times included
Johnson, S. M. (1954) · Naval Research Logistics Quarterly · doi:10.1002/nav.3800010110 · Cited by 3,252
Fundamentals of neural networks: architectures, algorithms, and applications
Fausett, L. V. (1994) · CERN Document Server (European Organization for Nuclear Research) · Cited by 3,025
Research works printed but not linked: 68
- Adibi, M. A., Zandieh, M., & Amiri, M. (2010). Multi-objective scheduling of dynamic job shop using variable neighborhood search. Expert Systems with Applications, 37(1), 282–287. · doi:10.1016/j.eswa.2009.05.001
- Barker, J. R., & McMahon, G. B. (1985). Scheduling the general job-shop. Management Science, 31(5), 594–598. · doi:10.1287/mnsc.31.5.594
- Baykasoğlu, A., Hamzadayi, A., & Köse, S. Y. (2014). Testing the performance of teaching-learning based optimization (TLBO) algorithm on combinatorial problems: Flow shop and job shop scheduling cases. Information Sciences, 276, 204–218. · DOI
- Blum, C., & Sampels, M. (2004). An ant colony optimization algorithm for shop scheduling problems. Journal of Mathematical Modelling and Algorithms, 3(3), 285–308. · DOI
- Brooks, G. H., & White, C. R. (1965). An algorithm for finding optimal or near optimal solutions to production scheduling problem. Journal of Industrial Engineering, 16(1), 34–40. https://www.researchgate.net/publication/284046228 .
- Canbolat, Y. B., & Gundogar, E. (2004). Fuzzy priority rule for job shop scheduling. Journal of Intelligent Manufacturing, 15(4), 527–533. · doi:10.1023/b:jims.0000034116.50789.df
- Chen, Y. Y., Fu, L. C., & Chen, Y. C. (1998). Multi-agent based dynamic scheduling for a flexible assembly system. In Proceedings, 1998 IEEE International Conference on Robotics and Automation (Vol. 3, pp. 2122–2127). IEEE. doi: 10.1109/ROBOT.1998.680634 . · doi:10.1109/robot.1998.680634
- Chen, J. C., Wu, C. C., Chen, C. W., et al. (2012). Flexible job shop scheduling with parallel machines using genetic algorithm and grouping genetic algorithm. Expert Systems with Applications, 39(11), 10016–10021. · doi:10.1016/j.eswa.2012.01.211
- Chong, C. S., Sivakumar, A. I., Low, M. Y. H., et al. (2006). A bee colony optimization algorithm to job shop scheduling. In Proceedings of the 38th conference on winter simulation. Winter simulation conference (pp. 1954–1961). http://dl.acm.org/citation.cfm?id=1218469 .
- Dauzere-Peres, S., & Lasserre, J. B. (1993). A modified shifting bottleneck procedure for job-shop scheduling. The International Journal of Production Research, 31(4), 923–932. · doi:10.1080/00207549308956766
- Davis, L. (1985). Job shop scheduling with genetic algorithms. In Proceedings of an international conference on genetic algorithms and their applications (p. 140). Carnegie-Mellon University, Pittsburgh, PA.
- Falkenauer, E., & Bouffouixm, S. (1991). A genetic algorithm for job shop. In IEEE international conference on robotics and automation, Proceedings, 1991 (pp. 824–829). IEEE. doi: 10.1109/ROBOT.1991.131689 . · doi:10.1109/robot.1991.131689
- Floudas, C. A., & Lin, X. (2004). Continuous-time versus discrete-time approaches for scheduling of chemical processes: A review. Computers & Chemical Engineering, 28(11), 2109–2129. · doi:10.1016/j.compchemeng.2004.05.002
- Floudas, C. A., & Lin, X. (2005). Mixed integer linear programming in process scheduling: Modeling, algorithms, and applications. Annals of Operations Research, 139(1), 131–162. · doi:10.1007/s10479-005-3446-x
- Fnaiech, N., Hammami, H., Yahyaoui, A., et al. (2012). New Hopfield neural network for joint job shop scheduling of production and maintenance. In IECON 2012-38th Annual Conference on IEEE Industrial Electronics Society (pp. 5535–5541). IEEE. doi: 10.1109/IECON.2012.6389511 . · doi:10.1109/iecon.2012.6389511
- Garey, M. R., Johnson, D. S., & Sethi, R. (1976). The complexity of flowshop and job shops cheduling. Mathematics of Operations Research, 1(2), 117–129. · DOI
- Geyik, F., & Cedimoglu, I. H. (2004). The strategies and parameters of tabu search for job-shop scheduling. Journal of Intelligent Manufacturing, 15(4), 439–448. · doi:10.1023/b:jims.0000034106.86434.46
- Glover, F., & Laguna, M. (2013). Tabu search. New York: Springer.
- Graves, S. C. (1981). A review of production scheduling. Operations Research, 29(4), 646–675. · doi:10.1287/opre.29.4.646
- Güçdemir, H., & Selim, H. (2017). Customer centric production planning and control in job shops: A simulation optimization approach. Journal of Manufacturing Systems, 43, 100–116. · doi:10.1016/j.jmsy.2017.02.004
- Harmanani, H. M., & Ghosn, S. B. (2016). An efficient method for the open-shop scheduling problem using simulated annealing (chapter). In Information technology: New generations (pp. 1183–1193). Berlin: Springer. doi: 10.1007/978-3-319-32467-8_102 . · doi:10.1007/978-3-319-32467-8_102
- Harrison, R. (2016) Engineering the smart factory. Chinese Journal of Mechanical Engineering, 1. http://www.cjmenet.com/CN/article/downloadArticleFile.do?attachType=PDF&id=2905 .
- Hefetz, N., & Adiri, I. (1982). An efficient optimal algorithm for the two-machines unit-time jobshop schedule-length problem. Mathematics of Operations Research, 7(3), 354–360. · doi:10.1287/moor.7.3.354
- Hino, R., & Moriwaki, T. (2002). Decentralized job shop scheduling by recursive propagation method. JSME International Journal Series C Mechanical Systems, Machine Elements and Manufacturing, 45(2), 551–557.
- Huang, S., Tian, N., & Ji, Z. (2016). Particle swarm optimization with variable neighborhood search for multi objective flexible job shop scheduling problem. International Journal of Modeling, Simulation, and Scientific Computing.. doi: 10.1142/S1793962316500240 . · doi:10.1142/s1793962316500240
- Huang, R. H., Yang, C. L., & Cheng, W. C. (2013). Flexible job shop scheduling with due window—A two-pheromone ant colony approach. International Journal of Production Economics, 141(2), 685–697. · doi:10.1016/j.ijpe.2012.10.011
- Ingimundardottir, H., & Runarsson, T. P. (2011). Supervised learning linear priority dispatch rules for job-shop scheduling. In International conference on learning and intelligent optimization (pp. 263–277). Berlin: Springer. http://link.springer.com/chapter/10.1007%2F978-3-642-25566-3_20 . · doi:10.1007/978-3-642-25566-3_20
- Iwamura, K., & Sugimura, N. A. (2010). Study on real-time scheduling for autonomous distributed manufacturing systems. In 2010 IEEE international conference on systems man and cybernetics (SMC) (pp. 1352–1357). IEEE. doi: 10.1109/ICSMC.2010.5642451 . · doi:10.1109/icsmc.2010.5642451
- Jain, A. S., & Meeran, S. (1998). A state-of-the-art review of job-shop scheduling techniques. http://ftp.bstu.by/ai/To-dom/My_research/Paper-0-again/For-courses/Job-SSP/jain.pdf . Technical report, Department of Applied Physics, Electronic and Mechanical Engineering, University of Dundee, Dundee, Scotland.
- Jalilvand-Nejad, A., & Fattahi, P. (2015). A mathematical model and genetic algorithm to cyclic flexible job shop scheduling problem. Journal of Intelligent Manufacturing, 26(6), 1085–1098. · doi:10.1007/s10845-013-0841-z
- Ju, Q. Y. (2007). Planning and scheduling optimization of job-shop in intelligent manufacturing system (pp. 1–97). Doctoral dissertation of Nanjing University of Aeronautics and Astronautics, Nanjing, China.
- Khadwilard, A., Chansombat, S., Thepphakorn, T., Chainate, W., & Pongcharoen, P. (2012). Application of firefly algorithm and its parameter setting for job shop scheduling. The Journal of Industrial Technology, 8(1), 49–58. https://www.researchgate.net/publication/225274007 .
- Lian, L., & Mesghouni, K. (2014). Comparative study of heuristics algorithms in solving flexible job shop scheduling problem with condition based maintenance. Journal of Industrial Engineering and Management, 7(2), 518–531. · doi:10.3926/jiem.1038
- Lin, L., Hao, X. C., Gen, M., et al. (2012). Network modeling and evolutionary optimization for scheduling in manufacturing. Journal of Intelligent Manufacturing, 23(6), 2237–2253. · doi:10.1007/s10845-011-0569-6
- Liu, S. Q., & Kozan, E. (2012). A hybrid shifting bottleneck procedure algorithm for the parallel-machine job-shop scheduling problem. Journal of the Operational Research Society, 63(2), 168–182. · doi:10.1057/jors.2011.4
- Lomnicki, Z. A. (1965). A “branch-and-bound” algorithm for the exact solution of the three-machine scheduling problem. Journal of the Operational Research Society, 16(1), 89–100. · doi:10.1057/jors.1965.7
- Marichelvam, M. K., & Geetha, M. (2016). A hybrid discrete firefly algorithm to solve flow shop scheduling problems to minimise total flow time. International Journal of Bio-Inspired Computation, 8(5), 318–325. · doi:10.1504/ijbic.2016.079572
- Marichelvam, M. K., Prabaharan, T., & Yang, X. S. (2014). A discrete firefly algorithm for the multi-objective hybrid flowshop scheduling problems. IEEE Transactions on Evolutionary Computation, 18(2), 301–305. · DOI
- McMahon, G., & Florian, M. (1975). On scheduling with ready times and due dates to minimize maximum lateness. Operations Research, 23(3), 475–482. · doi:10.1287/opre.23.3.475
- Min, H. S., & Yih, Y. (2003). Selection of dispatching rules on multiple dispatching decision points in real-time scheduling of a semiconductor wafer fabrication system. International Journal of Production Research, 41(16), 3921–3941. · doi:10.1080/0020754031000118099
- Muthiah, A., Rajkumar, A., & Rajkumar, R. (2016). Hybridization of artificial bee colony algorithm with particle swarm optimization algorithm for flexible job shop scheduling. In 2016 international conference on energy efficient technologies for sustainability (ICEETS) (pp. 896–903). IEEE. · doi:10.1109/iceets.2016.7583875
- Nawaz, M., Enscore, E. E., & Ham, I. (1983). A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem. Omega, 11(1), 91–95. · doi:10.1016/0305-0483(83)90088-9
- Nouiri, M., Bekrar, A., Jemai, A., et al. (2017). Two stage particle swarm optimization to solve the flexible job shop predictive scheduling problem considering possible machine breakdowns. Computers & Industrial Engineering. doi: 10.1016/j.cie.2017.03.006 . · doi:10.1016/j.cie.2017.03.006
- Paul, M., Sridharan, R., & Ramanan, T. R. (2016). A multi-objective decision-making framework using preference selection index for assembly job shop scheduling problem. International Journal of Management Concepts and Philosophy, 9(4), 362–387. · doi:10.1504/ijmcp.2016.079843
- Peng, B., Lü, Z., & Cheng, T. C. E. (2015). A tabu search/path relinking algorithm to solve the job shop scheduling problem. Computers & Operations Research, 53, 154–164. · doi:10.1016/j.cor.2014.08.006
- Pesch, E., & Tetzlaff, U. A. W. (1996). Constraint propagation based scheduling of job shops. INFORMS Journal on Computing, 8(2), 144–157. · DOI
- Ponsich, A., Tapia, M. G. C., & Coello, C. A. C. (2009). Solving permutation problems with differential evolution: An application to the jobshop scheduling problem. In ISDA (pp. 25–30). doi: 10.1109/ISDA.2009.49 . · doi:10.1109/isda.2009.49
- Rossi, F., Van Beek, P., & Walsh, T. (2006). Handbook of constraint programming. Amsterdam: Elsevier. http://www.informatik.uni-ulm.de/pm/fileadmin/pm/home/fruehwirth/Papers/FAI.pdf .
- Sarin, S. C., Ahn, S., & Bishop, A. B. (1988). An improved branching scheme for the branch and bound procedure of scheduling n jobs on m parallel machines to minimize total weighted flowtime. The International Journal of Production Research, 26(7), 1183–1191. · doi:10.1080/00207548808947934
- Shivasankaran, N., Kumar, P. S., & Raja, K. V. (2015). Hybrid sorting immune simulated annealing algorithm for flexible job shop scheduling. International Journal of Computational Intelligence Systems, 8(3), 455–466. · doi:10.1080/18756891.2015.1017383
- Simon, F. Y. P., & Takefuji, Y. (1988). Stochastic neural networks for solving job-shop scheduling. I. Problem representation. In IEEE international conference on neural networks (pp. 275–282). IEEE. doi: 10.1109/ICNN.1988.23939 . · doi:10.1109/icnn.1988.23939
- Singh, M. R., & Mahapatra, S. S. (2016). A quantum behaved particle swarm optimization for flexible job shop scheduling. Computers & Industrial Engineering, 93, 36–44. · doi:10.1016/j.cie.2015.12.004
- Sotskov, Y. N., Tautenhahn, T., & Werner, F. (1999). On the application of insertion techniques for job shop problems with setup times. RAIRO-Operations Research, 33(2), 209–245. · doi:10.1051/ro:1999110
- Teekeng, W., Thammano, A., Unkaw, P., et al. (2016). A new algorithm for flexible job-shop scheduling problem based on particle swarm optimization. Artificial Life and Robotics, 21(1), 18–23. · doi:10.1007/s10015-015-0259-0
- Van Dyke Parunak, H., Irish, B. W., Kindrick, J., & Lozo, P. W. (1985). Fractal actors for distributed manufacturing control. In Second conference on artificial intelligence applications: The engineering of knowledge-based systems (pp. 653–660). Miami Beach, FL, USA.
- Wagner, H. M. (1959). An integer linearprogramming model for machine scheduling. Naval Research Logistics Quarterly, 6(2), 131–140. · doi:10.1002/nav.3800060205
- Wang, L., Cai, J., Li, M., et al. (2017). Flexible job shop scheduling problem using an improved ant colony optimization. Scientific Programming. doi: 10.1155/2017/9016303 . · DOI
- Wenqi, H., & Aihua, Y. (2004). An improved shifting bottleneck procedure for the job shop scheduling problem. Computers & Operations Research, 31(12), 2093–2110. · doi:10.1016/s0305-0548(03)00243-0
- Werner, F., & Winkler, A. (1995). Insertion techniques for the heuristic solution of the job shop problem. Discrete Applied Mathematics, 58(2), 191–211. · DOI
- Xanthopoulos, A. S., & Koulouriotis, D. E. (2015). Cluster analysis and neural network-based metamodeling of priority rules for dynamic sequencing. Journal of Intelligent Manufacturing. doi: 10.1007/s10845-015-1090-0 . · doi:10.1007/s10845-015-1090-0
- Xing, L. N., Chen, Y. W., Wang, P., et al. (2010). A knowledge-based ant colony optimization for flexible job shop scheduling problems. Applied Soft Computing, 10(3), 888–896. · DOI
- Xue, H., Zhang, P., & Wei, S. (2015). Applying a hybrid algorithm of immunity and ant colony in job-shop scheduling. In Industrial engineering and manufacturing technology: Proceedings of the 2014 international conference on industrial engineering and manufacturing technology (ICIEMT 2014) (Vol. 4, p. 91), Shanghai, China. CRC Press, 10–11 July 2014.
- Yin, L., Yang, L., & Hu, M. (2015). Job shop scheduling based on improved discrete particle swarm optimization. In Proceedings of the 21st international conference on industrial engineering and engineering management 2014 (pp. 99–101). Amsterdam: Atlantis Press. doi: 10.2991/978-94-6239-102-4_21 . · doi:10.2991/978-94-6239-102-4_21
- Zahmani, M. H., Atmani, B., Bekrar, A., et al. (2015). Multiple priority dispatching rules for the job shop scheduling problem. In 2015 3rd international conference on control, engineering and information technology (CEIT) (pp. 1–6). IEEE. doi: 10.1109/CEIT.2015.7232991 . · doi:10.1109/ceit.2015.7232991
- Zhang, W., Wen, J. B., Zhu, Y. C., et al. (2017). Multi-objective scheduling simulation of flexible job-shop based on multi-population genetic algorithm. International Journal of Simulation Modelling (IJSIMM). doi: 10.2507/IJSIMM16(2)CO6 . · doi:10.2507/ijsimm16(2)co6
- Zhang, H., Yan, Q., Zhang, G., et al. (2016). A chaotic differential evolution algorithm for flexible job shop scheduling. In Asian simulation conference (pp. 79–88). Singapore: Springer.
- Zhao, B., Gao, J., Chen, K., et al. (2015). Two-generation Pareto ant colony algorithm for multi-objective job shop scheduling problem with alternative process plans and unrelated parallel machines. Journal of Intelligent Manufacturing. doi: 10.1007/s10845-015-1091-z . · doi:10.1007/s10845-015-1091-z
- Zorin, D. A., & Kostenko, V. A. (2014). Simulated annealing algorithm for job shop scheduling on reliable real-time systems. In International conference on operations research and enterprise systems (pp. 31–46). Berlin: Springer. doi: 10.1007/978-3-319-17509-6_3 . · doi:10.1007/978-3-319-17509-6_3
Cited by
Industry 4.0, digitization, and opportunities for sustainability
Ghobakhloo, M. (2020) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2019.119869 · Cited by 2,115
The future of manufacturing industry: a strategic roadmap toward Industry 4.0
Ghobakhloo, M. (2018) · Journal of Manufacturing Technology Management · doi:10.1108/jmtm-02-2018-0057 · Cited by 1,381
Understanding the adoption of Industry 4.0 technologies in improving environmental sustainability
Javaid, M., Haleem, A., Singh, R. P., Suman, R., & Gonzalez, E. S. (2022) · Sustainable Operations and Computers · doi:10.1016/j.susoc.2022.01.008 · Cited by 859
Zheng, T., Ardolino, M., Bacchetti, A., & Perona, M. (2021) · International Journal of Production Research · doi:10.1080/00207543.2020.1824085 · Cited by 728
Diez-Olivan, A., Del Ser, J., Galar, D., & Sierra, B. (2019) · Information Fusion · doi:10.1016/j.inffus.2018.10.005 · Cited by 633
Flexible Job-Shop Scheduling via Graph Neural Network and Deep Reinforcement Learning
Song, W., Chen, X., Li, Q., & Cao, Z. (2023) · IEEE Transactions on Industrial Informatics · doi:10.1109/tii.2022.3189725 · Cited by 519
Corporate survival in Industry 4.0 era: the enabling role of lean-digitized manufacturing
Ghobakhloo, M., & Fathi, M. (2019) · Journal of Manufacturing Technology Management · doi:10.1108/jmtm-11-2018-0417 · Cited by 483
Woschank, M., Rauch, E., & Zsifkovits, H. (2020) · Sustainability · doi:10.3390/su12093760 · Cited by 338
Actor-Critic Deep Reinforcement Learning for Solving Job Shop Scheduling Problems
Liu, C.-L., Chang, C.-C., & Tseng, C.-J. (2020) · IEEE Access · doi:10.1109/access.2020.2987820 · Cited by 281
Zhang, Y., Zhu, H., Tang, D., Zhou, T., & Gui, Y. (2022) · Robotics and Computer-Integrated Manufacturing · doi:10.1016/j.rcim.2022.102412 · Cited by 259
From data to big data in production research: the past and future trends
Kuo, Y.-H., & Kusiak, A. (2019) · International Journal of Production Research · doi:10.1080/00207543.2018.1443230 · Cited by 237
“For instance, data about manufacturing and maintenance processes can be analysed in real time for deriving strategies for cleaner manufacturing and supporting better product life cycle management (Zhang et al. 2017).”
BackgroundProduction scheduling in the context of Industry 4.0: review and trends
Parente, M., Figueira, G., Amorim, P., & Marques, A. (2020) · International Journal of Production Research · doi:10.1080/00207543.2020.1718794 · Cited by 232
Technology mining: Artificial intelligence in manufacturing
Zeba, G., Dabić, M., Čičak, M., Daim, T., & Yalcin, H. (2021) · Technological Forecasting and Social Change · doi:10.1016/j.techfore.2021.120971 · Cited by 227
Industrial wearable system: the human-centric empowering technology in Industry 4.0
Kong, X. T. R., Luo, H., Huang, G. Q., & Yang, X. (2019) · Journal of Intelligent Manufacturing · doi:10.1007/s10845-018-1416-9 · Cited by 209
“…al. 2017), cloud computing(Chen and Lin 2015), cyber physical system (Wu et al. 2017), ubiquitous computing (Luo et al. 2016; Wang et al. 2009) and wearable computing (Galzarano et al. 2016) open up a novel industrial revolution, referred to Industry 4.0 (Hofmann and Rusch 2017; Zhang et al. 2017).”
BackgroundInfluentialReview of vision-based defect detection research and its perspectives for printed circuit board
Zhou, Y., Yuan, M., Zhang, J., Ding, G., & Qin, S. (2023) · Journal of Manufacturing Systems · doi:10.1016/j.jmsy.2023.08.019 · Cited by 193
Self-citationBrozzi, R., Forti, D., Rauch, E., & Matt, D. T. (2020) · Sustainability · doi:10.3390/su12093647 · Cited by 187
“Against this background, an increasing number of scholars argue that Industry 4.0 holds great opportunity for realizing sustainable industrial value creation on all three dimensions of sustainability: Economic, social and environmental [12].”
BackgroundInfluentialFlexible Job Shop Scheduling via Dual Attention Network-Based Reinforcement Learning
Wang, R., Wang, G., Sun, J., Deng, F., & Chen, J. (2024) · IEEE Transactions on Neural Networks and Learning Systems · doi:10.1109/tnnls.2023.3306421 · Cited by 183
“The job-shop scheduling problem (JSP), which is a simpler and easier instance of FJSP, is also a core issue in the manufacturing industry [44].”
BackgroundWarke, V., Kumar, S., Bongale, A., & Kotecha, K. (2021) · Sustainability · doi:10.3390/su131810139 · Cited by 103
“As such, the industries thrive on making their product, process, or shop floor intelligent and smart, which involves self-decision-making and parameter optimization [27,28].”
Background
Metadata
- Authors
- Zhang, J., Ding, G., Zou, Y., Qin, S., & Fu, J.
- Venue
- Journal of Intelligent Manufacturing
- Published
- 2017-08-21
- Volume
- 30
- Issue
- 4
- Pages
- 1809-1830
- ISSN
- 0956-5515 (ISSN-L)
- 1572-8145
- OpenAlex
- W2747092504
- Cited by
- 558
- References
- 56
- FWCI
- 29.99
- Type
- journal article
- Language
- en
- Open access
- closed
- Licence
- www.springer.com/tdm (tdm)
- Funders
- The Aircraft Digital Workshop of Large-Scale Complex Structure Parts, Intelligent Manufacturing Special Project of Ministry of Industry and Information Technology of China
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.