The DOI matches its Crossref record; 56 of the 56 references it cites were found in a registry or an index.
Review of job shop scheduling research and its new perspectives under Industry 4.0
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Optimization by Simulated Annealing
Kirkpatrick, S., Gelatt, C. D., & Vecchi, M. P. (1983) · Science · doi:10.1126/science.220.4598.671 · Cited by 45,134
Storn, R., & Price, K. (1997) · Journal of Global Optimization · doi:10.1023/a:1008202821328 · Cited by 29,569
Particle swarm optimization: An overview
Poli, R., Kennedy, J., & Blackwell, T. (2007) · Swarm Intelligence · doi:10.1007/s11721-007-0002-0 · Cited by 21,101
Glover, F., & Laguna, M. (1997) · Cited by 5,679
Nature-Inspired Metaheuristic Algorithms
Yang, X. (2008) · Medical Entomology and Zoology · Cited by 4,556
Future paths for integer programming and links to artificial intelligence
Glover, F. (1986) · Computers & Operations Research · doi:10.1016/0305-0548(86)90048-1 · Cited by 4,181
Price, K. V. (2004) · Cited by 3,344
Optimization, Learning and Natural Algorithms
Dorigo, M. (1992) · Medical Entomology and Zoology · Cited by 3,307
Optimal two‐ and three‐stage production schedules with setup times included
Johnson, S. M. (1954) · Naval Research Logistics Quarterly · doi:10.1002/nav.3800010110 · Cited by 3,252
Fundamentals of neural networks: architectures, algorithms, and applications
Fausett, L. V. (1994) · CERN Document Server (European Organization for Nuclear Research) · Cited by 3,025
Glover, F., & Laguna, M. (1997) · doi:10.1007/978-1-4615-6089-0 · Cited by 3,001
Kennedy, J. (2011) · Encyclopedia of Machine Learning · doi:10.1007/978-0-387-30164-8_630 · Cited by 2,989
Design Principles for Industrie 4.0 Scenarios
Hermann, M., Pentek, T., & Otto, B. (2016) · 2016 49th Hawaii International Conference on System Sciences (HICSS) · doi:10.1109/hicss.2016.488 · Cited by 2,974
Storn, R. (1995) · Medical Entomology and Zoology · Cited by 2,800
Distributed Optimization by Ant Colonies
Colorni, A., Dorigo, M., Maniezzo, V., Varela, F. J., & Bourgine, P. (1992) · Dépôt institutionnel de l'Université libre de Bruxelles (Université Libre de Bruxelles) · Cited by 2,748
Modern heuristic techniques for combinatorial problems
Reeves, C. R. (1993) · Medical Entomology and Zoology · Cited by 2,580
Local Search in Combinatorial Optimization
(2003) · Princeton University Press eBooks · doi:10.1515/9780691187563 · Cited by 2,057
The Shifting Bottleneck Procedure for Job Shop Scheduling
Adams, J., Balas, E., & Zawack, D. J. (1988) · Management Science · doi:10.1287/mnsc.34.3.391 · Cited by 1,603
Sequencing and Scheduling: An Introduction to the Mathematics of the Job-Shop
Rand, G. K., & French, S. D. (1982) · Journal of the Operational Research Society · doi:10.1057/jors.1982.184 · Cited by 1,047
Principles of Constraint Programming
Apt, K. (2003) · Cambridge University Press eBooks · doi:10.1017/cbo9780511615320 · Cited by 888
Change Through Digitization—Value Creation in the Age of Industry 4.0
Kagermann, H. (2015) · Management of Permanent Change · doi:10.1007/978-3-658-05014-6_2 · Cited by 838
An Analysis of Several Heuristics for the Traveling Salesman Problem
Rosenkrantz, D. J., Stearns, R. E., & Lewis, II (1977) · SIAM Journal on Computing · doi:10.1137/0206041 · Cited by 837
An analysis of several heuristics for the traveling salesman problem
Rosenkrantz, D. J., Stearns, R. E., & Lewis, P. M. (2009) · Fundamental Problems in Computing · doi:10.1007/978-1-4020-9688-4_3 · Cited by 772
Ant colony optimization for resource-constrained project scheduling
Merkle, D., Middendorf, M., & Schmeck, H. (2002) · IEEE Transactions on Evolutionary Computation · doi:10.1109/tevc.2002.802450 · Cited by 759
An effective hybrid optimization approach for multi-objective flexible job-shop scheduling problems
Xia, W., & Wu, Z. (2005) · Computers & Industrial Engineering · doi:10.1016/j.cie.2005.01.018 · Cited by 681
On the Job-Shop Scheduling Problem
Manne, A. S. (1960) · Operations Research · doi:10.1287/opre.8.2.219 · Cited by 666
An effective hybrid genetic algorithm and tabu search for flexible job shop scheduling problem
Li, X., & Gao, L. (2016) · International Journal of Production Economics · doi:10.1016/j.ijpe.2016.01.016 · Cited by 618
Multi-objective meta-heuristics: An overview of the current state-of-the-art
Jones, D. F., Mirrazavi, S. K., & Tamiz, M. (2002) · European Journal of Operational Research · doi:10.1016/s0377-2217(01)00123-0 · Cited by 567
An improved Ant System algorithm for theVehicle Routing Problem
Bullnheimer, B., Hartl, R. F., & Strauss, C. (1999) · Annals of Operations Research · doi:10.1023/a:1018940026670 · Cited by 548
Firefly Algorithm for Continuous Constrained Optimization Tasks
Łukasik, S., & Żak, S. (2009) · Lecture Notes in Computer Science · doi:10.1007/978-3-642-04441-0_8 · Cited by 435
Blum, C. (2005) · Computers & Operations Research · doi:10.1016/j.cor.2003.11.018 · Cited by 421
Guided Local Search with Shifting Bottleneck for Job Shop Scheduling
Balas, E., & Vazacopoulos, A. (1998) · Management Science · doi:10.1287/mnsc.44.2.262 · Cited by 407
Heuristic scheduling systems with applications to production systems and project management
(1995) · European Journal of Operational Research · doi:10.1016/0377-2217(95)90067-5 · Cited by 356
Zhang, R., & Chiong, R. (2016) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2015.09.097 · Cited by 344
Cheng, R., Gen, M., & Tsujimura, Y. (1999) · Computers & Industrial Engineering · doi:10.1016/s0360-8352(99)00022-4 · Cited by 323
Cheng, R., Gen, M., & Tsujimura, Y. (1999) · Computers & Industrial Engineering · doi:10.1016/s0360-8352(99)00136-9 · Cited by 303
Sakawa, M., & Kubota, R. (2000) · European Journal of Operational Research · doi:10.1016/s0377-2217(99)00094-6 · Cited by 287
Ant colony optimization combined with taboo search for the job shop scheduling problem
Huang, K.-L., & Liao, C.-J. (2008) · Computers & Operations Research · doi:10.1016/j.cor.2006.07.003 · Cited by 278
A Branch and Bound Algorithm for the Total Weighted Tardiness Problem
Potts, C. N., & Wassenhove, L. N. V. (1985) · Operations Research · doi:10.1287/opre.33.2.363 · Cited by 278
Sayadi, M. K., Ramezanian, R., & Ghaffarinasab, N. (2010) · International Journal of Industrial Engineering Computations · doi:10.5267/j.ijiec.2010.01.001 · Cited by 267
A research survey: review of AI solution strategies of job shop scheduling problem
Çaliş, B., & Bulkan, S. (2015) · Journal of Intelligent Manufacturing · doi:10.1007/s10845-013-0837-8 · Cited by 233
Saidi‐Mehrabad, M., Dehnavi-Arani, S., Evazabadian, F., et al. (2015) · Computers & Industrial Engineering · doi:10.1016/j.cie.2015.01.003 · Cited by 232
Multiobjective evolutionary algorithm for manufacturing scheduling problems: state-of-the-art survey
Gen, M., & Lin, L. (2014) · Journal of Intelligent Manufacturing · doi:10.1007/s10845-013-0804-4 · Cited by 188
Variable and value ordering heuristics for the job shop scheduling constraint satisfaction problem
Sadeh, N., & Fox, M. S. (1996) · Artificial Intelligence · doi:10.1016/0004-3702(95)00098-4 · Cited by 168
Zandieh, M., Khatami, A. R., & Rahmati, S. H. A. (2017) · Applied Soft Computing · doi:10.1016/j.asoc.2017.04.060 · Cited by 147
Huang, R., & Yu, T.-H. (2017) · Applied Soft Computing · doi:10.1016/j.asoc.2017.04.062 · Cited by 112
Ponsich, A., & Coello, C. A. C. (2012) · Applied Soft Computing · doi:10.1016/j.asoc.2012.07.034 · Cited by 108
Neto, R. F. T., & Filho, M. G. (2012) · Engineering Applications of Artificial Intelligence · doi:10.1016/j.engappai.2012.03.011 · Cited by 106
Karthikeyan, S., Asokan, P., Savarimuthu, N., & Page, T. (2015) · International Journal of Bio-Inspired Computation · doi:10.1504/ijbic.2015.073165 · Cited by 105
A hybrid genetic tabu search algorithm for solving job shop scheduling problems: a case study
Meeran, S., & Morshed, M. S. (2011) · Journal of Intelligent Manufacturing · doi:10.1007/s10845-011-0520-x · Cited by 101
A review on evolution of production scheduling with neural networks
Akyol, D. E., & Bayhan, G. M. (2007) · Computers & Industrial Engineering · doi:10.1016/j.cie.2007.04.006 · Cited by 100
Constraint satisfaction techniques in planning and scheduling
Barták, R., Salido, M. Á., & Rossi, F. (2008) · Journal of Intelligent Manufacturing · doi:10.1007/s10845-008-0203-4 · Cited by 95
Artificial neural networks for job shop simulation
Fonseca, D. J., & Navaresse, D. O. (2002) · Advanced Engineering Informatics · doi:10.1016/s1474-0346(03)00005-3 · Cited by 78
Zhao, F., Shao, Z., Wang, J., & Zhang, C. (2015) · International Journal of Production Research · doi:10.1080/00207543.2015.1041575 · Cited by 59
Wang, C., & Jiang, P. (2016) · Journal of Intelligent Manufacturing · doi:10.1007/s10845-016-1194-1 · Cited by 57
An artificial neural network for resource leveling problems
Kartam, N., & Tongthong, T. (1998) · Artificial intelligence for engineering design analysis and manufacturing · doi:10.1017/s0890060498123053 · Cited by 16
Cited by
Industry 4.0, digitization, and opportunities for sustainability
Ghobakhloo, M. (2020) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2019.119869 · Cited by 2,115
The future of manufacturing industry: a strategic roadmap toward Industry 4.0
Ghobakhloo, M. (2018) · Journal of Manufacturing Technology Management · doi:10.1108/jmtm-02-2018-0057 · Cited by 1,381
Understanding the adoption of Industry 4.0 technologies in improving environmental sustainability
Javaid, M., Haleem, A., Singh, R. P., Suman, R., & Gonzalez, E. S. (2022) · Sustainable Operations and Computers · doi:10.1016/j.susoc.2022.01.008 · Cited by 859
Zheng, T., Ardolino, M., Bacchetti, A., & Perona, M. (2021) · International Journal of Production Research · doi:10.1080/00207543.2020.1824085 · Cited by 728
Diez-Olivan, A., Del Ser, J., Galar, D., & Sierra, B. (2019) · Information Fusion · doi:10.1016/j.inffus.2018.10.005 · Cited by 633
Metadata
- Authors
- Zhang, J., Ding, G., Zou, Y., Qin, S., & Fu, J.
- Venue
- Journal of Intelligent Manufacturing
- Published
- 2017-08-21
- Volume
- 30
- Issue
- 4
- Pages
- 1809-1830
- ISSN
- 0956-5515 (ISSN-L)
- 1572-8145
- OpenAlex
- W2747092504
- Cited by
- 558
- References
- 56
- FWCI
- 29.99
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.