Construction delays in privately funded large building projects in Bangladesh

Open access
Islam, Muhammad Saiful, Suhariadi, Bambang Trigunarsyah·2018·Asian Journal of Civil Engineering

Abstract

Schedule delay in building construction projects is considered as one of the main reasons for project failure in developing countries. Likewise, privately funded building construction projects in Bangladesh have been suffering due to schedule delays. This study investigated the main causes of delay in privately funded large building projects in Bangladesh. To determine the causes of delay, a structured interview with 70 respondents was conducted with project owners, consultants, and contractors. Using the importance index analysis method, the study identified the critical causes of delays. The ten most important causes are: (1) lack of experienced construction managers; (2) lowest bidder selection; (3) owners’ fund shortage; (4) lack of proper management by the owners; (5) improper planning and scheduling; (6) lack of skilled workers; (7) inaccurate time and cost estimation by the contractors; (8) site constraints; (9) improper progress monitoring and cost control; and (10) contractors’ cash flow problem during construction. Furthermore, Kruskal–Wallis test indicates that there is no significant variation among the three groups of respondents, i.e., owners, consultants, and contractors. The finding of this study is significant for identifying the most important causes of delay in large building projects. It also identifies the responsibility of major stakeholders (i.e., owners, consultants, and contractors) in causing a schedule delay, which helps them to find mitigation measures for the potential delays of upcoming projects in advance. Although this study provides the insight into the causes of delay in privately funded large building projects in Bangladesh, it is also significant for other similar developing countries.

Overview

Integrity signals

Registry

Crossref · 10.1007/s42107-018-0034-3

Cites

Statistics

Recomputing p-values needs the paper’s full text.

Verification

Claims the paper makes

We couldn’t retrieve this paper’s full text, so its claims and self-check weren’t run. The registry and citation checks still apply.

Claims other papers make about this one

Each is checked against this paper’s own text: does it say what the citing paper says it does?

2 more claims about this paper

Create a free account to see every claim other papers make about this one.

See all claims — free account

Citations

The citation lists haven’t been fetched yet

References 65 · Cited by 44

Research works printed but not linked: 5

  1. Amin, A. N. (2014). Housing industry of Bangladesh: Easing the constraints and overcoming the image deficit. Dhaka: Janasharthey Grihonirman.
  2. Faisal, F., & Ridwan, S. M. (2012). Infrastructure financing through domestic capital market in Bangladesh. World Journal of Social Science, 2(5), 31–41.
  3. Hameed, A., Abdul, I., Yasmin, N., & Abd, T. (2013). Social and web-based risk assessment technique for time and cost overrun (WRATTCO)—A framework. In International Conference on Innovation, Management and Technology Research, Malaysia, 22–23 September, pp. 1–7.
  4. Motaleb, O., & Kishk, M. (2010). An Investigation into causes and effects of construction delays in UAE. In Proceeding of 26th Annual ARCOM Conference, 6–8 September 2010, Leeds, UK, pp. 1149–1157.
  5. Salam, M. A., Staines, H. J., Blackwood, D. J., & Sarkar, S. (2001). Analysis of the relationships between causes of delay in construction projects in Bangladesh. In 17th Annual ARCOM Conference, vol. 1, pp. 619–28.

Metadata

Authors
Islam, M. S., & Suhariadi, B. T.
Affiliations
Queensland University of Technology (AU)
Corresponding author
Islam, Muhammad Saiful
Venue
Asian Journal of Civil Engineering
Published
2018-03-28
Volume
19
Issue
4
Pages
415-429
ISSN
  • 1563-0854 (ISSN-L)
  • 2522-011X
OpenAlex
W2795237383
Cited by
44
References
65
Citations by year
2026: 2 · 2025: 5 · 2024: 6 · 2023: 11 · 2022: 7 · 2021: 4 · 2020: 7 · 2019: 2
FWCI
2.59
Type
journal article
Language
en
Open access
Licence
  • cc-by
  • www.springer.com/tdm (tdm)
Locations
  • Asian Journal of Civil Engineering (publishedVersion)
  • RMIT Research Repository (RMIT University Library) (submittedVersion)
  • Figshare (submittedVersion, cc-by)
Topics
  • Social Sciences › Decision Sciences › Management Science and Operations Research › Construction Project Management and Performance
  • Social Sciences › Business, Management and Accounting › Strategy and Management › Value Engineering and Management
  • Physical Sciences › Engineering › Building and Construction › BIM and Construction Integration
Keywords
construction delays, schedule delays, delay causes, construction management, construction planning and scheduling, cost and time estimation, site constraints, progress monitoring, cost control, contractor cash flow, stakeholder responsibility, Bangladesh

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Construction delays in privately funded large building projects in Bangladesh. https://app.cochat.ai/papers/10.1007/s42107-018-0034-3
The paper
Islam, M. S., & Suhariadi, B. T. (2018). Construction delays in privately funded large building projects in Bangladesh. Asian Journal of Civil Engineering. https://doi.org/10.1007/s42107-018-0034-3

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.