Cost estimation and prediction in construction projects: a systematic review on machine learning techniques
Open accessThe DOI matches its Crossref record; 44 of the 44 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
An Introduction to Genetic Algorithms
Mitchell, M. (1996) · doi:10.7551/mitpress/3927.001.0001 · Cited by 11,340
Case-Based Reasoning: Foundational Issues, Methodological Variations, and System Approaches
Aamodt, A., & Plaza, E. (1994) · AI Communications · doi:10.3233/aic-1994-7104 · Cited by 5,624
Handbook of Evolutionary Computation
(1997) · Institute of Physics eBooks · doi:10.1887/0750308958 · Cited by 2,990
Tu, J. V. (1996) · Journal of Clinical Epidemiology · doi:10.1016/s0895-4356(96)00002-9 · Cited by 1,818
Introduction to Machine Learning
Yu, F. R., & He, Y. (2019) · SpringerBriefs in Electrical and Computer Engineering · doi:10.1007/978-3-030-10546-4_1 · Cited by 1,594
Artificial Neural Network Modeling of the Rainfall‐Runoff Process
Hsu, K., Gupta, H. V., & Sorooshian, S. (1995) · Water Resources Research · doi:10.1029/95wr01955 · Cited by 1,515
An Introduction to Machine Learning
Kubat, M. (2015) · Springer eBooks · doi:10.1007/978-3-319-20010-1 · Cited by 1,007
Kim, G.-H., An, S.-H., & Kang, K.-I. (2004) · Building and Environment · doi:10.1016/j.buildenv.2004.02.013 · Cited by 567
Neural Network Model for Parametric Cost Estimation of Highway Projects
Hegazy, T., & Ayed, A. (1998) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1998)124:3(210 · Cited by 388
Artificial neural networks in business: Two decades of research
Tkáč, M., & Verner, R. (2016) · Applied Soft Computing · doi:10.1016/j.asoc.2015.09.040 · Cited by 340
Predicting Accuracy of Early Cost Estimates Using Factor Analysis and Multivariate Regression
Trost, S. M., & Oberlender, G. D. (2003) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2003)129:2(198 · Cited by 339
A neural network approach for early cost estimation of structural systems of buildings
Murat Günaydın, H., & Zeynep Doğan, S. (2004) · International Journal of Project Management · doi:10.1016/j.ijproman.2004.04.002 · Cited by 285
Cost Estimation During Design Step: Parametric Method versus Case Based Reasoning Method
Duverlie, P., & Castelain, J. M. (1999) · The International Journal of Advanced Manufacturing Technology · doi:10.1007/s001700050147 · Cited by 269
Neural Network Modeling of Highway Construction Costs
Wilmot, C. G., & Mei, B. (2005) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2005)131:7(765 · Cited by 188
Wang, Y.-R., Yu, C.-Y., & Chan, H.-H. (2012) · International Journal of Project Management · doi:10.1016/j.ijproman.2011.09.002 · Cited by 179
A case-based reasoning cost estimating model using experience by analytic hierarchy process
An, S.-H., Kim, G.-H., & Kang, K.-I. (2007) · Building and Environment · doi:10.1016/j.buildenv.2006.06.007 · Cited by 174
Classification and Regression Tree Methods
Loh, W. (2007) · Wiley eBooks · doi:10.1002/9780470061572.eqr492 · Cited by 164 · cited 1×
“The response variable in the former includes a finite set of values, while in the latter contains continuous or discrete set of variables [17].”
BackgroundCheng, M.-Y., Tsai, H.-C., & Sudjono, E. (2010) · Expert Systems with Applications · doi:10.1016/j.eswa.2009.11.080 · Cited by 163
Cheng, M., Tsai, H., & Hsieh, W.-S. (2008) · Automation in Construction · doi:10.1016/j.autcon.2008.07.001 · Cited by 154
Knowledge-Based Systems Engineering
Kantola, J., & Karwowski, W. (2012) · CRC Press eBooks · doi:10.1201/b12043-10 · Cited by 152
Cost premium prediction of certified green buildings: A neural network approach
Tatari, O., & Küçükvar, M. (2010) · Building and Environment · doi:10.1016/j.buildenv.2010.11.009 · Cited by 137
Using Intelligent Techniques in Construction Project Cost Estimation: 10-Year Survey
Elfaki, A. O., Alatawi, S., & Abushandi, E. (2014) · Advances in Civil Engineering · doi:10.1155/2014/107926 · Cited by 134
Conceptual cost estimation of building projects with regression analysis and neural networks
Sönmez, R. (2004) · Canadian Journal of Civil Engineering · doi:10.1139/l04-029 · Cited by 129
Preliminary Cost Estimation Model Using Case-Based Reasoning and Genetic Algorithms
Kim, K. J., & Kim, K. (2010) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000054 · Cited by 107
Cost estimation in road construction using artificial neural network
Tijanić, K., Car-Pušić, D., & Šperac, M. (2019) · Neural Computing and Applications · doi:10.1007/s00521-019-04443-y · Cited by 105
Hybrid Models of Neural Networks and Genetic Algorithms for Predicting Preliminary Cost Estimates
Kim, G. H., Seo, D., & Kang, K.-I. (2005) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)0887-3801(2005)19:2(208 · Cited by 101
MRA-based revised CBR model for cost prediction in the early stage of construction projects
Jin, R.-Z., Cho, K., Hyun, C.-T., & Son, M.-J. (2011) · Expert Systems with Applications · doi:10.1016/j.eswa.2011.11.018 · Cited by 98
A neural networks approach for cost flow forecasting
Boussabaine, A., & Kaka, A. P. (1998) · Construction Management and Economics · doi:10.1080/014461998372240 · Cited by 96
Estimating water treatment plants costs using factor analysis and artificial neural networks
Marzouk, M. M., & Elkadi, M. (2015) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2015.09.015 · Cited by 87
AHP- and simulation-based budget determination procedure for public building construction projects
Lai, Y.-T., Wang, W.-C., & Wang, H.-H. (2008) · Automation in Construction · doi:10.1016/j.autcon.2007.10.007 · Cited by 86
Forecasting final budget and duration of highway construction projects
Pewdum, W., Rujirayanyong, T., & Sooksatra, V. (2009) · Engineering Construction & Architectural Management · doi:10.1108/09699980911002566 · Cited by 79
Son, H., Kim, C., & Kim, C. (2012) · Automation in Construction · doi:10.1016/j.autcon.2012.05.013 · Cited by 78
Kim, S. (2013) · Journal of Civil Engineering and Management · doi:10.3846/13923730.2012.737829 · Cited by 70
Swei, O., Gregory, J. R., & Kirchain, R. (2017) · Transportation Research Part B Methodological · doi:10.1016/j.trb.2017.04.013 · Cited by 60
Generalized linear model-based expert system for estimating the cost of transportation projects
Chou, J. (2008) · Expert Systems with Applications · doi:10.1016/j.eswa.2008.03.017 · Cited by 58
Khalaf, T. Z., Çağlar, H., Çağlar, A., & Hanoon, A. N. (2020) · Civil Engineering Journal · doi:10.28991/cej-2020-03091478 · Cited by 57
Kim, S., & Shim, J. H. (2013) · Canadian Journal of Civil Engineering · doi:10.1139/cjce-2013-0223 · Cited by 57
Conceptual Cost Estimation Model for Engineering Services in Public Construction Projects
Hyari, K. H., Al-Daraiseh, A. A., & El-Mashaleh, M. S. (2015) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000381 · Cited by 54
Alex, D. P., Al‐Hussein, M., Bouferguène, A., & Fernando, S. (2009) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000184 · Cited by 50
A Neural Network Model for Building Construction Projects Cost Estimating
El-Sawalhi, N. I., & Shehatto, O. M. (2014) · Journal of Construction Engineering and Project Management · doi:10.6106/jcepm.2014.4.4.009 · Cited by 47 · cited 1×
“Furthermore, [35] have conducted a survey to investigate the most influencing factors on the cost estimating process, then developed the ANN model, and eventually conducted a sensitivity analysis.”
MethodNeural networks for modelling the final target cost of water projects.
Ahiaga-Dagbui, D. D., & Smith, S. D. (2012) · ERA · doi:10.13140/2.1.3660.6402 · Cited by 46
Cost Estimation Model Using Modified Parameters for Construction Projects
Ji, S., Ahn, J., Lee, H., & Han, K. (2019) · Advances in Civil Engineering · doi:10.1155/2019/8290935 · Cited by 42
Decision Tree Induction Methods and Their Application to Big Data
Perner, P. (2014) · Modeling and optimization in science and technologies · doi:10.1007/978-3-319-09177-8_3 · Cited by 27
A classification algorithm based on the complete decision tree
Djukova, E. V., & Peskov, N. V. (2007) · Pattern Recognition and Image Analysis · doi:10.1134/s1054661807030030 · Cited by 20
Metadata
- Authors
- Tayefeh Hashemi, S., Ebadati, O. M., & Kaur, H.
- Venue
- SN Applied Sciences
- Published
- 2020-09-15
- Volume
- 2
- Issue
- 10
- ISSN
- 2523-3963 (ISSN-L)
- 2523-3971
- OpenAlex
- W3086242700
- Cited by
- 209
- References
- 44
- FWCI
- 3.28
- Type
- journal article
- Language
- en
- Open access
- bronze
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.