AN ALGORITHM FOR A GENERAL CLASS OF PRECEDENCE AND RESOURCE CONSTRAINED SCHEDULING PROBLEMS
The DOI matches its Crossref record; 8 of the 8 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach
Pritsker, A. A. B., Waiters, L. J., & Wolfe, P. M. (1969) · Management Science · doi:10.1287/mnsc.16.1.93 · Cited by 772
Activity networks: Project planning and control by network models
Elmaghraby, S. E. (1977) · Medical Entomology and Zoology · Cited by 582
Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case
Talbot, F. B. (1982) · Management Science · doi:10.1287/mnsc.28.10.1197 · Cited by 456
Self-citationA Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling
Davis, E. W., & Patterson, J. H. (1975) · Management Science · doi:10.1287/mnsc.21.8.944 · Cited by 454
Self-citationProject Scheduling under Resource Constraints—Historical Review and Categorization of Procedures
Davis, E. W. (1973) · A I I E Transactions · doi:10.1080/05695557308974916 · Cited by 211
Talbot, F. B., & Patterson, J. H. (1978) · Management Science · doi:10.1287/mnsc.24.11.1163 · Cited by 209
Self-citationScheduling a Project to Maximize Its Present Value: A Zero-One Programming Approach
Doersch, R. H., & Patterson, J. H. (1977) · Management Science · doi:10.1287/mnsc.23.8.882 · Cited by 147
Self-citationScheduling under resource constraints — Deterministic models
Schmidt, G. (1987) · European Journal of Operational Research · doi:10.1016/0377-2217(87)90051-8 · Cited by 110
Cited by
Resource-constrained project scheduling: Notation, classification, models, and methods
Brucker, P., Drexl, A., Möhring, R., Neumann, K., & Pesch, E. (1999) · European Journal of Operational Research · doi:10.1016/s0377-2217(98)00204-5 · Cited by 1,500
Peteghem, V. V., & Vanhoucke, M. (2010) · European Journal of Operational Research · doi:10.1016/j.ejor.2009.03.034 · Cited by 310
A Robust Genetic Algorithm for Resource Allocation in Project Scheduling
Alcaraz, J., & Maroto, C. (2001) · Annals of Operations Research · doi:10.1023/a:1010949931021 · Cited by 275
Ghoddousi, P., Eshtehardian, E., Jooybanpour, S., & Javanmardi, A. (2013) · Automation in Construction · doi:10.1016/j.autcon.2012.11.014 · Cited by 215
Fuzzy critical chain method for project scheduling under resource constraints and uncertainty
Long, L. D., & Ohsato, A. (2008) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.09.012 · Cited by 201
Lova, A., Tormos, P., Cervantes, M., & Barber, F. (2009) · International Journal of Production Economics · doi:10.1016/j.ijpe.2008.11.002 · Cited by 186
Scheduling of deconstruction projects under resource constraints
Schultmann, F., & Rentz, O. (2002) · Construction Management and Economics · doi:10.1080/01446190210135913 · Cited by 24
“Patterson et al. (1989) proposed an enumeration procedure of the branch and bound type and Sprecher (1994) accelerated and generalized the algorithm.”
Method
Metadata
- Authors
- PATTERSON, J. H., SŁOWIŃSKI, R., TALBOT, F. B., & WĘGLARZ, J.
- Venue
- Advances in Project Scheduling
- Publisher
- Elsevier
- Published
- 1989
- Pages
- 3-28
- OpenAlex
- W1563800566
- Cited by
- 162
- References
- 8
- FWCI
- 7.45
- Type
- book chapter
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.