A critical analysis of Building Information Modelling systems used in construction projects
The DOI matches its Crossref record; 25 of the 25 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Contrasting the capabilities of building energy performance simulation programs
Crawley, D. B., Hand, J. W., Kummert, M., & Griffith, B. T. (2008) · Building and Environment · doi:10.1016/j.buildenv.2006.10.027 · Cited by 1,858
Merging Qualitative and Quantitative Data in Mixed Methods Research: How To and Why Not
Driscoll, D., Appiah-Yeboah, A., Salib, P., & Rupert, D. J. (2007) · Lincoln (University of Nebraska) · Cited by 831
BIM implementation throughout the UK construction project lifecycle: An analysis
Eadie, R., Browne, M., Odeyinka, H., McKeown, C., & McNiff, S. (2013) · Automation in Construction · doi:10.1016/j.autcon.2013.09.001 · Cited by 749
A Guide to Writing the Dissertation Literature Review
Randolph, J. (2020) · ScholarWorks@UMassAmherst (University of Massachusetts Amherst) · doi:10.7275/b0az-8t74 · Cited by 722
The origins and growth of action learning
(1982) · Industrial and Commercial Training · doi:10.1108/eb003898 · Cited by 720
Mixed methods: A review of literature and the future of the new research paradigm
Migiro, S. O., & Magangi, B. A. (2011) · AFRICAN JOURNAL OF BUSINESS MANAGEMENT · doi:10.5897/ajbm09.082 · Cited by 361
Building Information Modeling in Support of Sustainable Design and Construction
Bynum, P., Issa, R. R. A., & Olbina, S. (2013) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000560 · Cited by 297
Exploring how information exchanges can be enhanced through Cloud BIM
Redmond, A., Hore, A., Alshawi, M., & West, R. (2012) · Automation in Construction · doi:10.1016/j.autcon.2012.02.003 · Cited by 281
BIM adoption and implementation for architectural practices
Arayıcı, Y., Coates, P., Koskela, L., Kagioglou, M., Usher, C., & O'Reilly, K. (2011) · International Journal of Building Pathology and Adaptation · doi:10.1108/02630801111118377 · Cited by 279
A review of cloud-based BIM technology in the construction sector
Wong, J. K. W., Wang, X., Li, H., Chan, G., & Li, H. (2014) · ORCA Online Research @Cardiff (Cardiff University) · Cited by 204
3D and VR models in Civil Engineering education: Construction, rehabilitation and maintenance
Sampaio, A. Z., Ferreira, M. M., Rosário, D. P., & Martins, O. P. (2010) · Automation in Construction · doi:10.1016/j.autcon.2010.05.006 · Cited by 185
Component based engineering of a mobile BIM-based augmented reality system
Meža, S., Turk, Ž., & Dolenc, M. (2014) · Automation in Construction · doi:10.1016/j.autcon.2014.02.011 · Cited by 165
Interoperability evaluation models: A systematic review
Rezaei, R., Chiew, T. K., Lee, S. P., & Aliee, Z. S. (2013) · Computers in Industry · doi:10.1016/j.compind.2013.09.001 · Cited by 160
Integrating BIM and augmented reality for interactive architectural visualisation
Wang, J., Wang, X., Shou, W., & Xu, B. (2014) · Construction Innovation · doi:10.1108/ci-03-2014-0019 · Cited by 137
BIM2MAR: An Efficient BIM Translation to Mobile Augmented Reality Applications
Williams, G., Gheisari, M., Chen, P.-J., & Irizarry, J. (2014) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000315 · Cited by 127
Towards cloud Augmented Reality for construction application by BIM and SNS integration
Jiao, Y., Zhang, S., Li, Y., Wang, Y., & Yang, B. (2012) · Automation in Construction · doi:10.1016/j.autcon.2012.09.018 · Cited by 107
Blogs – The New Source of Data Analysis
Jones, M., & Alony, I. (2008) · Issues in Informing Science and Information Technology · doi:10.28945/1019 · Cited by 81
Wu, S., Wood, G., Ginige, K., & Jong, S. W. (2014) · University of Huddersfield Repository (University of Huddersfield) · Cited by 79
Rezaei, R., Chiew, T. K., Lee, S. P., & Aliee, Z. S. (2014) · Expert Systems with Applications · doi:10.1016/j.eswa.2014.03.020 · Cited by 68
Developing Mobile BIM/2D Barcode-Based Automated Facility Management System
Lin, Y., Su, Y.-C., & Chen, Y.-P. (2014) · The Scientific World JOURNAL · doi:10.1155/2014/374735 · Cited by 63
Social media: a guide for researchers
Cann, A. J., Dimitriou, K., & Hooley, T. (2011) · University of Derby Online Research Archive. (University of Derby) · Cited by 55
Ren, Y., Skibniewski, M. J., & Jiang, S. (2012) · Journal of Civil Engineering and Management · doi:10.3846/13923730.2012.719835 · Cited by 50
Eastman, C. M., & Henrion, M. (1977) · ACM SIGGRAPH Conference (SIGGRAPH) · doi:10.1145/563858.563863 · Cited by 49
Building Information Modelling in Cameroon: Overcoming Existing Challenges
Abanda, F. H., Manjia, M. B., Pettang, C., Tah, J. H. M., & Nkeng, G. E. (2014) · International Journal of 3-D Information Modeling · doi:10.4018/ij3dim.2014100101 · Cited by 25
Self-citation
Cited by
Building Information Modeling (BIM) for green buildings: A critical review and future directions
Lu, Y., Wu, Z., Chang, R., & Li, Y. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.08.024 · Cited by 555
Cloud computing in construction industry: Use cases, benefits and challenges
Bello, S. A., Oyedele, L. O., Akinade, O. O., Bilal, M., Davila Delgado, J. M., Akanbi, L. A., Ajayi, A. O., & Owolabi, H. A. (2021) · Automation in Construction · doi:10.1016/j.autcon.2020.103441 · Cited by 452
Chan, D. W. M., Olawumi, T. O., & Ho, A. M. L. (2019) · Journal of Building Engineering · doi:10.1016/j.jobe.2019.100764 · Cited by 342
Construction 4.0: A Literature Review
Forcael, E., Ferrari, I., Opazo-Vega, A., & Pulido-Arcas, J. A. (2020) · Sustainability · doi:10.3390/su12229755 · Cited by 319
Santos, R., Costa, A. A., & Grilo, A. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.03.005 · Cited by 318
Metadata
- Authors
- Abanda, F. H., Vidalakis, C., Oti, A. H., & Tah, J. H. M.
- Venue
- Advances in Engineering Software
- Publisher
- Elsevier BV
- Published
- 2015-12
- Volume
- 90
- Pages
- 183-201
- ISSN
- 0965-9978 (ISSN-L)
- OpenAlex
- W1854718667
- Cited by
- 201
- References
- 25
- FWCI
- 13.98
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.