Optimal scheduling of buildings with energy generation and thermal energy storage under dynamic electricity pricing using mixed-integer nonlinear programming
The DOI matches its Crossref record; 16 of the 16 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Skoplaki, E., & Palyvos, J. A. (2009) · Solar Energy · doi:10.1016/j.solener.2008.10.008 · Cited by 2,697 · cited 1×
“(8) [29,30].”
Mixed-integer nonlinear optimization
Belotti, P., Kirches, C., Leyffer, S., Linderoth, J., Luedtke, J., & Mahajan, A. (2013) · Acta Numerica · doi:10.1017/s0962492913000032 · Cited by 712
Distributed energy generation and sustainable development
Alanne, K., & Saari, A. (2006) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2004.11.004 · Cited by 710 · cited 1×
“The use of renewable energy resources has been recognized as a solution to the energy problems in future for low carbon society construction and sustainable development [1,2].”
BackgroundMorais, H., Kádár, P., Faria, P., Vale, Z. A., & Khodr, H. M. (2010) · Renewable Energy · doi:10.1016/j.renene.2009.02.031 · Cited by 548 · cited 1×
“Nearly all the energy systems have the scheduling problem [13,14].”
BackgroundOptimal Investment Planning for Distributed Generation in a Competitive Electricity Market
El-Khattam, W., Bhattacharya, K., Hegazy, Y., & Salama, M. M. A. (2004) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2004.831699 · Cited by 526 · cited 1×
“Nearly all the energy systems have the scheduling problem [13,14].”
BackgroundA two-stage stochastic programming model for the optimal design of distributed energy systems
Zhou, Z., Zhang, J., Liu, P., Li, Z., Georgiadis, M. C., & Pistikopoulos, E. N. (2013) · Applied Energy · doi:10.1016/j.apenergy.2012.09.019 · Cited by 319
Mitra, S., Sun, L., & Grossmann, I. E. (2013) · Energy · doi:10.1016/j.energy.2013.02.030 · Cited by 288 · cited 1×
“The use of renewable energy resources has been recognized as a solution to the energy problems in future for low carbon society construction and sustainable development [1,2].”
BackgroundRueda-Medina, A. C., Franco, J. F., Rider, M. J., Padilha-Feltrin, A., & Romero, R. (2013) · Electric Power Systems Research · doi:10.1016/j.epsr.2012.12.009 · Cited by 227
Mago, P. J., & Hueffed, A. K. (2010) · Energy and Buildings · doi:10.1016/j.enbuild.2010.04.005 · Cited by 202 · cited 1×
“the two basic control strategies in applications [10,11].”
BackgroundModel Predictive Control of thermal energy storage in building cooling systems
Ma, Y., Borrelli, F., Hencey, B., Packard, A., & Bortoff, S. (2009) · Proceedings of the 48h IEEE Conference on Decision and Control (CDC) held jointly with 2009 28th Chinese Control Conference · doi:10.1109/cdc.2009.5400677 · Cited by 196 · cited 2×
“[22] presented a study on the application of model-based predictive control on the operation of thermal energy storage in building cooling systems.”
BackgroundMethod
Cited by
Serale, G., Fiorentini, M., Capozzoli, A., Bernardini, D., & Bemporad, A. (2018) · Energies · doi:10.3390/en11030631 · Cited by 637
“Since in these studies different long-term comfort indicators were used [147], a detailed comparison of the results was not achievable.”
Thomas, D., Deblecker, O., & Ioakimidis, C. S. (2018) · Applied Energy · doi:10.1016/j.apenergy.2017.07.035 · Cited by 387
Méndez Echenagucia, T., Capozzoli, A., Cascone, Y., & Sassone, M. (2015) · Applied Energy · doi:10.1016/j.apenergy.2015.04.090 · Cited by 324
Jin, X., Mu, Y., Jia, H., Wu, J., Jiang, T., & Yu, X. (2017) · Applied Energy · doi:10.1016/j.apenergy.2016.07.080 · Cited by 268
Tang, H., Wang, S., & Li, H. (2021) · Energy · doi:10.1016/j.energy.2020.119598 · Cited by 259
Self-citationHierarchical microgrid energy management in an office building
Jin, X., Wu, J., Mu, Y., Wang, M., Xu, X., & Jia, H. (2017) · Applied Energy · doi:10.1016/j.apenergy.2017.10.002 · Cited by 165
“In [17], the electric power consumption of an EC was dispatched in the dynamic economic dispatch process with the discrete EC operating constraints.”
MethodGhaffarianhoseini, A., Berardi, U., AlWaer, H., Chang, S., Halawa, E., Ghaffarianhoseini, A., & Clements-Croome, D. (2016) · Architectural Science Review · doi:10.1080/00038628.2015.1079164 · Cited by 162
“ment is achievable using these approaches (Lu et al. 2015).”
MOD-DR: Microgrid optimal dispatch with demand response
Jin, M., Feng, W., Liu, P., Marnay, C., & Spanos, C. (2017) · Applied Energy · doi:10.1016/j.apenergy.2016.11.093 · Cited by 158
“, minimum run time and notification time, both are viable for practical deployment [20,33,37,29,64].”
BackgroundBuilding life cycle assessment research: A review by bibliometric analysis
Geng, S., Wang, Y., Zuo, J., Zhou, Z., Du, H., & Mao, G. (2017) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2017.03.068 · Cited by 158
Lv, C., Yu, H., Li, P., Wang, C., Xu, X., Li, S., & Wu, J. (2019) · Applied Energy · doi:10.1016/j.apenergy.2019.03.205 · Cited by 131
Metadata
- Authors
- Lu, Y., Wang, S., Sun, Y., & Yan, C.
- Venue
- Applied Energy
- Publisher
- Elsevier BV
- Published
- 2015-06
- Volume
- 147
- Pages
- 49-58
- ISSN
- 0306-2619 (ISSN-L)
- OpenAlex
- W1997990017
- Cited by
- 198
- References
- 16
- FWCI
- 25.70
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.