The DOI matches its Crossref record; 33 of the 33 references it cites were found in a registry or an index.
Electric load forecasting by support vector model
Open accessOverview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Time Series Analysis: Forecasting and Control
Geurts, M., Box, G. E. P., & Jenkins, G. M. (1977) · Journal of Marketing Research · doi:10.2307/3150485 · Cited by 19,186
GELB, A. (1974) · CERN Document Server (European Organization for Nuclear Research) · Cited by 6,405
Support Vector Regression Machines
Drucker, H., Burges, C. J. C., Kaufman, L., Smola, A. J., & Vapnik, V. N. (1996) · Cited by 4,658
Practical selection of SVM parameters and noise estimation for SVM regression
Cherkassky, V., & Ma, Y. (2004) · Neural Networks · doi:10.1016/s0893-6080(03)00169-2 · Cited by 2,030
Time Series Analysis Forecasting and Control
Bartholomew, D. J. (1971) · Journal of the Operational Research Society · doi:10.1057/jors.1971.52 · Cited by 1,792
Electric load forecasting using an artificial neural network
Park, D.-C., El-Sharkawi, M. A., Marks, R. J., Atlas, L., & Damborg, M. J. (1991) · IEEE Transactions on Power Systems · doi:10.1109/59.76685 · Cited by 1,440
Learning and Soft Computing: Support Vector Machines, Neural Networks, and Fuzzy Logic Models
Kecman, V. (2001) · Cited by 1,352
Application of support vector machines in financial time series forecasting
Tay, F. E. H., & Cao, L. (2001) · Omega · doi:10.1016/s0305-0483(01)00026-3 · Cited by 1,268
Improving support vector machine classifiers by modifying kernel functions
Amari, S., & Wu, S. (1999) · Neural Networks · doi:10.1016/s0893-6080(99)00032-5 · Cited by 936
Gross, G., & Galiana, F. D. (1987) · Proceedings of the IEEE · doi:10.1109/proc.1987.13927 · Cited by 878
Load Forecasting Using Support Vector Machines: A Study on EUNITE Competition 2001
Chen, B.-J., Chang, M.-W., & Lin, C.-J. (2004) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2004.835679 · Cited by 841
A regression-based approach to short-term system load forecasting
Papalexopoulos, A. D., & Hesterberg, T. C. (1990) · IEEE Transactions on Power Systems · doi:10.1109/59.99410 · Cited by 823
Analysis and evaluation of five short-term load forecasting techniques
Moghram, I., & Rahman, S. (1989) · IEEE Transactions on Power Systems · doi:10.1109/59.41700 · Cited by 706
Introduction to random signal analysis and Kalman filtering
Brown, R. G. (1983) · Medical Entomology and Zoology · Cited by 634
Short-Term Load Forecasting Using General Exponential Smoothing
Christiaanse, W. (1971) · IEEE Transactions on Power Apparatus and Systems · doi:10.1109/tpas.1971.293123 · Cited by 500
Forecasting loads and prices in competitive power markets
Bunn, D. W. (2000) · Proceedings of the IEEE · doi:10.1109/5.823996 · Cited by 458
Support vector machines experts for time series forecasting
Cao, L. (2003) · Neurocomputing · doi:10.1016/s0925-2312(02)00577-5 · Cited by 424
Support vector machines with simulated annealing algorithms in electricity load forecasting
Pai, P.-F., & Hong, W.-C. (2005) · Energy Conversion and Management · doi:10.1016/j.enconman.2005.02.004 · Cited by 388
Self-citationPai, P.-F., & Hong, W.-C. (2005) · Electric Power Systems Research · doi:10.1016/j.epsr.2005.01.006 · Cited by 371
Self-citationForecasting the short-term demand for electricity
Darbellay, G. A., & Slama, M. (2000) · International Journal of Forecasting · doi:10.1016/s0169-2070(99)00045-x · Cited by 316
Models for mid-term electricity demand forecasting incorporating weather influences
Mirasgedis, S., Sarafidis, Y., Georgopoulou, E., Lalas, D. P., MOSCHOVITS, M., Karagiannis, F. E., & PAPAKONSTANTINOU, D. (2005) · Energy · doi:10.1016/j.energy.2005.02.016 · Cited by 286
Forecasting electricity consumption in New Zealand using economic and demographic variables
Mohamed, Z., & Bodger, P. S. (2004) · Energy · doi:10.1016/j.energy.2004.08.012 · Cited by 279
Using adaptive network based fuzzy inference system to forecast regional electricity loads
Ying, L.-C., & Pan, M.-C. (2007) · Energy Conversion and Management · doi:10.1016/j.enconman.2007.06.015 · Cited by 264
Chen, J.-F., Wang, W.-M., & Huang, C.-M. (1995) · Electric Power Systems Research · doi:10.1016/0378-7796(95)00977-1 · Cited by 253
Regional load forecasting in Taiwan––applications of artificial neural networks
Hsu, C., & Chen, C.-Y. (2003) · Energy Conversion and Management · doi:10.1016/s0196-8904(02)00225-x · Cited by 236
Short-Term Bus Load Forecasting of Power Systems by a New Hybrid Method
Amjady, N. (2007) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2006.889130 · Cited by 203
Cao, J., & Lin, X. (2008) · Energy Conversion and Management · doi:10.1016/j.enconman.2007.12.030 · Cited by 192
Bayesian neural network approach to short time load forecasting
Lauret, P., Fock, E., Randrianarivony, R. N., & Manicom-Ramsamy, J.-F. (2008) · Energy Conversion and Management · doi:10.1016/j.enconman.2007.09.009 · Cited by 190
Medium term system load forecasting with a dynamic artificial neural network model
Ghiassi, M., Zimbra, D. K., & Saidane, H. (2006) · Electric Power Systems Research · doi:10.1016/j.epsr.2005.06.010 · Cited by 179
Saini, L. M. (2008) · Electric Power Systems Research · doi:10.1016/j.epsr.2007.11.003 · Cited by 150
The impacts of temperature forecast uncertainty on Bayesian load forecasting
Douglas, A. P., Breipohl, A. M., Lee, F. N., & Adapa, R. (1998) · IEEE Transactions on Power Systems · doi:10.1109/59.736298 · Cited by 124
Dynamic support vector machines for non-stationary time series forecasting
Cao, L., & Gu, Q. (2002) · Intelligent Data Analysis · doi:10.3233/ida-2002-6105 · Cited by 82
Long-term load forecasting via a hierarchical neural model with time integrators
Carpinteiro, O. A. S., Leme, R. C., de Souza, A. C. Z., Pinheiro, C. A. M., & Moreira, E. M. (2006) · Electric Power Systems Research · doi:10.1016/j.epsr.2006.03.014 · Cited by 71
Cited by
Ahmed, R., Sreeram, V., Mishra, Y., & Arif, M. D. (2020) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2020.109792 · Cited by 1,259
“The literature describes many optimization techniques for inputs of PV output models: PSO [127], grid-search [128], fruit fly optimization algorithm (FOA) [129], firefly (FF) [130], ant colony optimization (ACO) [131], chaotic ant swarm optimization (CAS) [132], chaotic artificial bee colony algorithm [133] and immune…”
MethodForecasting of photovoltaic power generation and model optimization: a review
Das, U. K., Tey, K. S., Seyedmahmoudian, M., Mekhilef, S., Idris, M. Y. I., Van Deventer, W., Horan, B., & Stojcevski, A. (2018) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2017.08.017 · Cited by 1,211
Energy models for demand forecasting—A review
Suganthi, L., & Samuel, A. A. (2012) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2011.08.014 · Cited by 1,189
A review on time series forecasting techniques for building energy consumption
Deb, C., Zhang, F., Yang, J., Lee, S. E., & Shah, K. W. (2017) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2017.02.085 · Cited by 1,006
Greek long-term energy consumption prediction using artificial neural networks
Ekonomou, L. (2010) · Energy · doi:10.1016/j.energy.2009.10.018 · Cited by 435
Metadata
- Authors
- Hong, W.-C.
- Venue
- Applied Mathematical Modelling
- Publisher
- Elsevier BV
- Published
- 2009-05
- Volume
- 33
- Issue
- 5
- Pages
- 2444-2454
- ISSN
- 0307-904X (ISSN-L)
- OpenAlex
- W2081060955
- Cited by
- 312
- References
- 33
- FWCI
- 11.06
- Type
- journal article
- Language
- en
- Open access
- bronze
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.