The DOI matches its Crossref record; 29 of the 29 references it cites were found in a registry or an index.
An agent-based framework for supply chain coordination in construction
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Decisions with Multiple Objectives: Preferences and Value Tradeoffs.
Tsoukias, A., Keeney, R. L., & Raiffa, H. (1994) · The Journal of the Operational Research Society · doi:10.2307/2584151 · Cited by 8,370
Intelligent agents: theory and practice
Wooldridge, M., & Jennings, N. R. (1995) · The Knowledge Engineering Review · doi:10.1017/s0269888900008122 · Cited by 6,810
The interdisciplinary study of coordination
Malone, T. W., & Crowston, K. (1994) · ACM Computing Surveys · doi:10.1145/174666.174668 · Cited by 3,504
A Roadmap of Agent Research and Development
Jennings, N. R., Sycara, K., & Wooldridge, M. (1998) · Autonomous Agents and Multi-Agent Systems · doi:10.1023/a:1010090405266 · Cited by 2,161
Decisions with Multiple Objectives—Preferences and Value Tradeoffs
Kidd, J. (1977) · Journal of the Operational Research Society · doi:10.1057/jors.1977.126 · Cited by 1,743
Nwana, H. S. (1996) · The Knowledge Engineering Review · doi:10.1017/s026988890000789x · Cited by 1,585
The four roles of supply chain management in construction
Vrijhoef, R., & Koskela, L. (2000) · European Journal of Purchasing & Supply Management · doi:10.1016/s0969-7012(00)00013-7 · Cited by 862
Rosenschein, J. S. (1994) · Cited by 535
Models for Supply Chains in E-Business
Swaminathan, J. M., & Tayur, S. R. (2003) · Management Science · doi:10.1287/mnsc.49.10.1387.17309 · Cited by 480
Proceedings of the 2002 Winter Simulation Conference
(2002) · Proceedings of the Winter Simulation Conference · doi:10.1109/wsc.2002.1166355 · Cited by 456
Material Waste in Building Industry: Main Causes and Prevention
Formoso, C. T., Soibelman, L., De Cesare, C., & Isatto, E. L. (2002) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2002)128:4(316 · Cited by 434
Proceedings of the 2006 Winter Simulation Conference
(2006) · Proceedings of the 2006 Winter Simulation Conference · doi:10.1109/wsc.2006.323029 · Cited by 399
Zeus: A toolkit for building distributed multiagent systems
Nwana, H. S., Ndumu, D. T., Lee, L. C., & Collis, J. C. (1999) · Applied Artificial Intelligence · doi:10.1080/088395199117513 · Cited by 291
Saad, M., Jones, M., & James, P. (2002) · European Journal of Purchasing & Supply Management · doi:10.1016/s0969-7012(02)00007-2 · Cited by 281
A seamless supply chain management model for construction
Love, P. E. D., Irani, Z., & Edwards, D. J. (2004) · Supply Chain Management: An International Journal · doi:10.1108/13598540410517575 · Cited by 249
Client‐led strategies for construction supply chain improvement
Briscoe, G. H., Dainty, A. R. J., Millett, S. J., & Neale, R. H. (2004) · Construction Management and Economics · doi:10.1080/0144619042000201394 · Cited by 192
An industrial organization economic supply chain approach for the construction industry: a review
London, K. A., & Kenley, R. (2001) · Construction Management and Economics · doi:10.1080/01446190110081699 · Cited by 174
Collaborative design of structures using intelligent agents
Anumba, D. O. C., Ugwu, O. O., Newnham, L., & Thorpe, A. (2002) · Automation in Construction · doi:10.1016/s0926-5805(01)00055-3 · Cited by 138
Impact of information sharing on inventory replenishment in divergent supply chains
Lau, J. S. K., Huang, G. Q., & Mak, K. L. (2004) · International Journal of Production Research · doi:10.1080/00207540310001628911 · Cited by 138
Sadeh, N., Hildum, D. W., Kjenstad, D., & Tseng, A. (2001) · Production Planning & Control · doi:10.1080/095372801300107680 · Cited by 130
Multi-agent systems in construction–state of the art and prospects
Ren, Z., & Anumba, D. O. C. (2004) · Automation in Construction · doi:10.1016/j.autcon.2003.12.002 · Cited by 115
Study on multi-agent-based agile supply chain management
Lou, P., Zhou, Z., Chen, Y., & Ai, W. (2004) · The International Journal of Advanced Manufacturing Technology · doi:10.1007/s00170-003-1626-x · Cited by 93
Integrated multi-agent-based supply chain management
Frey, D., Woelk, P.-O., Stockheim, T., & Zimmermann, R. (2004) · IEEE International Conference on Enabling Technologies: Infrastructure for Collaborative Enterprises (WETICE) · doi:10.1109/enabl.2003.1231377 · Cited by 66
The development of a multi-agent system for construction claims negotiation
Ren, Z., Anumba, D. O. C., & Ugwu, O. O. (2003) · Advances in Engineering Software · doi:10.1016/s0965-9978(03)00107-8 · Cited by 52
Kim, K., & Paulson, B. C. (2002) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)0887-3801(2003)17:1(10 · Cited by 52
Web‐based technology in support of construction supply chain networks
Mohamed, S. (2003) · International Journal of Productivity and Performance Management · doi:10.1108/00438020310458688 · Cited by 38
MACE: multi-agents coordination engine to resolve conflicts among functional units in an enterprise
Kwon, O., & Lee, K. C. (2002) · Expert Systems with Applications · doi:10.1016/s0957-4174(02)00023-4 · Cited by 32
Vrijhoef, R., Koskela, L., & Voordijk, H. (2003) · University of Twente Research Information · Cited by 25
An Analysis of Team Rewards at the U.S. Army Corps of Engineers Huntsville Center
Cox, J. M., & Tippett, D. D. (2003) · Engineering Management Journal · doi:10.1080/10429247.2003.11415221 · Cited by 18
Cited by
Artificial intelligence in supply chain management: theory and applications
Min, H. (2010) · International Journal of Logistics Research and Applications · doi:10.1080/13675560902736537 · Cited by 573
Artificial intelligence applications in supply chain management
Pournader, M., Ghaderi, H., Hassanzadegan, A., & Fahimnia, B. (2021) · International Journal of Production Economics · doi:10.1016/j.ijpe.2021.108250 · Cited by 519
Integrating BIM and GIS to improve the visual monitoring of construction supply chain management
Irizarry, J., Karan, E. P., & Jalaei, F. (2013) · Automation in Construction · doi:10.1016/j.autcon.2012.12.005 · Cited by 481
Metadata
- Authors
- Xue, X., Li, X., Shen, Q., & Wang, Y.
- Venue
- Automation in Construction
- Publisher
- Elsevier BV
- Published
- 2005-06
- Volume
- 14
- Issue
- 3
- Pages
- 413-430
- ISSN
- 0926-5805 (ISSN-L)
- OpenAlex
- W2051124757
- Cited by
- 254
- References
- 29
- FWCI
- 7.12
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.