The DOI matches its Crossref record; 1 of the 1 references it cites were found in a registry or an index.
Client‐led strategies for construction supply chain improvement
Abstract
Recent research into the UK construction industry has identified various drivers for change and prominent among these is the need for better client leadership. The aim of this research was to examine the role of the client in securing a greater degree of supply chain integration. It used three diverse case studies to examine the association between clients, the environmental factors that affect their businesses, the procurement decisions made and the level of supply chain integration that can be achieved. The results of this research provide independent empirical support for some of the recommendations of the recently released Accelerating Change report and some practical amplification. Clients are shown to be key drivers of performance improvement and innovation and are the most significant factor in achieving integration in the supply chain.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Stevens, G. C. (1989) · International Journal of Physical Distribution & Materials Management · doi:10.1108/eum0000000000329 · Cited by 1,560
Cited by
Eriksson, P. E., & Westerberg, M. (2011) · International Journal of Project Management · doi:10.1016/j.ijproman.2010.01.003 · Cited by 363
Construction supply chain integration: an elusive goal?
Briscoe, G., & Dainty, A. (2005) · Supply Chain Management: An International Journal · doi:10.1108/13598540510612794 · Cited by 303
Self-citationAn agent-based framework for supply chain coordination in construction
Xue, X., Li, X., Shen, Q., & Wang, Y. (2005) · Automation in Construction · doi:10.1016/j.autcon.2004.08.010 · Cited by 254
Interdependence in supply chains and projects in construction
Bankvall, L., Bygballe, L. E., Dubois, A., & Jahre, M. (2010) · Supply Chain Management: An International Journal · doi:10.1108/13598541011068314 · Cited by 253
Achieving Supply Chain Integration within Construction Industry
McDermotti, P., & Khalfan, M. (2012) · Construction Economics and Building · doi:10.5130/ajceb.v6i2.2983 · Cited by 35
Metadata
- Authors
- Briscoe, G. H., Dainty, A. R. J., Millett, S. J., & Neale, R. H.
- Venue
- Construction Management and Economics
- Publisher
- Informa UK Limited
- Published
- 2004-02
- Volume
- 22
- Issue
- 2
- Pages
- 193-201
- ISSN
- 0144-6193 (ISSN-L)
- 1466-433X
- OpenAlex
- W2078570802
- Cited by
- 192
- References
- 1
- FWCI
- 13.62
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Client‐led strategies for construction supply chain improvement. https://app.cochat.ai/papers/10.1080/0144619042000201394
- The paper
- Briscoe, G. H., Dainty, A. R. J., Millett, S. J., & Neale, R. H. (2004). Client‐led strategies for construction supply chain improvement. Construction Management and Economics. https://doi.org/10.1080/0144619042000201394
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.