The DOI matches its Crossref record.
Automated progress tracking using 4D schedule and 3D sensing technologies
Abstract
Abstract Efficient and effective construction progress tracking is critical to construction management. Current manual tracking methods are time consuming and/or error prone. Three dimensional (3D) laser scanners are being investigated in the construction industry and have shown potential for supporting progress tracking. However, their full potential has not yet been achieved. The reason may be that commercial software packages are still too complicated for processing scanned data. Methods have however been developed for the automated recognition of project 3D CAD model objects in site laser scans. A novel system is thus described herein that combines 3D object recognition technology with schedule information into a combined 4D object oriented progress tracking system. This system is tested on a comprehensive field database acquired during the construction of the Engineering V Building at the University of Waterloo. It demonstrates a degree of accuracy for automated progress tracking that meets or exceeds typical manual performance.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cited by
Computer vision techniques in construction: A critical review
Xu, S., Wang, J., Shou, W., Ngo, T., Sadick, A.-M., & Wang, X. (2021) · Archives of Computational Methods in Engineering · doi:10.1007/s11831-020-09504-3 · Cited by 409
Automated construction progress measurement using a 4D building information model and 3D data
Kim, C., Son, H., & Kim, C. (2013) · Automation in Construction · doi:10.1016/j.autcon.2012.11.041 · Cited by 317
Dimitrov, A., & Golparvar-Fard, M. (2014) · Advanced Engineering Informatics · doi:10.1016/j.aei.2013.11.002 · Cited by 261
Computational methodologies for optimal sensor placement in structural health monitoring: A review
Tan, Y., & Zhang, L. (2020) · Structural Health Monitoring · doi:10.1177/1475921719877579 · Cited by 186
Cyber-physical systems integration of building information models and the physical construction
Akanmu, A., & Anumba, C. J. (2015) · Engineering, Construction and Architectural Management · doi:10.1108/ecam-07-2014-0097 · Cited by 122
Metadata
- Authors
- Turkan, Y., Bosche, F., Haas, C. T., & Haas, R.
- Venue
- Automation in Construction
- Publisher
- Elsevier BV
- Published
- 2012-03
- Volume
- 22
- Pages
- 414-421
- ISSN
- 0926-5805 (ISSN-L)
- OpenAlex
- W2057531282
- Cited by
- 374
- References
- 0
- FWCI
- 27.69
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Automated progress tracking using 4D schedule and 3D sensing technologies. https://app.cochat.ai/papers/10.1016/j.autcon.2011.10.003
- The paper
- Turkan, Y., Bosche, F., Haas, C. T., & Haas, R. (2012). Automated progress tracking using 4D schedule and 3D sensing technologies. Automation in Construction. https://doi.org/10.1016/j.autcon.2011.10.003
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.