The DOI matches its Crossref record; 17 of the 17 references it cites were found in a registry or an index.
Automated progress tracking using 4D schedule and 3D sensing technologies
Abstract
Abstract Efficient and effective construction progress tracking is critical to construction management. Current manual tracking methods are time consuming and/or error prone. Three dimensional (3D) laser scanners are being investigated in the construction industry and have shown potential for supporting progress tracking. However, their full potential has not yet been achieved. The reason may be that commercial software packages are still too complicated for processing scanned data. Methods have however been developed for the automated recognition of project 3D CAD model objects in site laser scans. A novel system is thus described herein that combines 3D object recognition technology with schedule information into a combined 4D object oriented progress tracking system. This system is tested on a comprehensive field database acquired during the construction of the Engineering V Building at the University of Waterloo. It demonstrates a degree of accuracy for automated progress tracking that meets or exceeds typical manual performance.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Tang, P., Huber, D., Akinci, B., Lipman, R., & Lytle, A. (2010) · Automation in Construction · doi:10.1016/j.autcon.2010.06.007 · Cited by 1,139
A New Approach for Health Monitoring of Structures: Terrestrial Laser Scanning
Park, H. S., Lee, H. M., Adeli, H., & Lee, I. (2007) · Computer-Aided Civil and Infrastructure Engineering · doi:10.1111/j.1467-8667.2006.00466.x · Cited by 589
Bosché, F. (2010) · Advanced Engineering Informatics · doi:10.1016/j.aei.2009.08.006 · Cited by 482
Integrating 3D laser scanning and photogrammetry for progress measurement of construction work
El‐Omari, S., & Moselhi, O. (2008) · Automation in Construction · doi:10.1016/j.autcon.2008.05.006 · Cited by 296
Automated retrieval of 3D CAD model objects in construction range images
Bosche, F., & Haas, C. T. (2008) · Automation in Construction · doi:10.1016/j.autcon.2007.09.001 · Cited by 278
Self-citationGolparvar‐Fard, M., Pena-Mora, F. A., & Savarese, S. (2009) · Journal of Information Technology in Construction · Cited by 277
Assessing research issues in Automated Project Performance Control (APPC)
Navon, R., & Sacks, R. (2007) · Automation in Construction · doi:10.1016/j.autcon.2006.08.001 · Cited by 225
Toward automated generation of parametric BIMs based on hybrid video and laser scanning data
Brilakis, I., Lourakis, M., Sacks, R., Savarese, S., Christodoulou, S., Teizer, J., & Makhmalbaf, A. (2010) · Advanced Engineering Informatics · doi:10.1016/j.aei.2010.06.006 · Cited by 204
Bosché, F., Haas, C. T., & Akinci, B. (2009) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)0887-3801(2009)23:6(311 · Cited by 160
Self-citationPHOTO-NET II: a computer-based monitoring system applied to project management
Abeid, J., Allouche, E. N., Arditi, D., & Hayman, M. (2003) · Automation in Construction · doi:10.1016/s0926-5805(03)00042-6 · Cited by 106
Cited by
Building Information Modeling (BIM) for existing buildings — Literature review and future needs
Volk, R., Stengel, J., & Schultmann, F. (2014) · Automation in Construction · doi:10.1016/j.autcon.2013.10.023 · Cited by 2,199
Geographic information systems and science
(2011) · International Journal of Digital Earth · doi:10.1080/17538947.2011.582276 · Cited by 1,691
Towards a semantic Construction Digital Twin: Directions for future research
Boje, C., Guerriero, A., Kubicki, S., & Rezgui, Y. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103179 · Cited by 1,324
Geographic information systems and science
Retalis, A. (2005) · The Photogrammetric Record · doi:10.1111/j.1477-9730.2005.00343_5.x · Cited by 903
Bosché, F., Ahmed, M., Turkan, Y., Haas, C. T., & Haas, R. (2015) · Automation in Construction · doi:10.1016/j.autcon.2014.05.014 · Cited by 550
Self-citationWang, Q., & Kim, M.-K. (2019) · Advanced Engineering Informatics · doi:10.1016/j.aei.2019.02.007 · Cited by 461
Computer vision techniques in construction: A critical review
Xu, S., Wang, J., Shou, W., Ngo, T., Sadick, A.-M., & Wang, X. (2021) · Archives of Computational Methods in Engineering · doi:10.1007/s11831-020-09504-3 · Cited by 409
Prefabricated construction enabled by the Internet-of-Things
Zhong, R. Y., Peng, Y., Xue, F., Fang, J., Zou, W., Luo, H., Thomas Ng, S., Lu, W., Shen, G. Q. P., & Huang, G. Q. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.01.006 · Cited by 395
Real-time monitoring of construction sites: Sensors, methods, and applications
Rao, A. S., Radanovic, M., Liu, Y., Hu, S., Fang, Y., Khoshelham, K., Palaniswami, M., & Ngo, T. (2022) · Automation in Construction · doi:10.1016/j.autcon.2021.104099 · Cited by 393
Huang, M. Q., Ninić, J., & Zhang, Q. B. (2021) · Tunnelling and Underground Space Technology · doi:10.1016/j.tust.2020.103677 · Cited by 370
Pour Rahimian, F., Seyedzadeh, S., Oliver, S., Rodriguez, S., & Dawood, N. (2020) · Automation in Construction · doi:10.1016/j.autcon.2019.103012 · Cited by 329
State of research in automatic as-built modelling
Pătrăucean, V., Armeni, I., Nahangi, M., Yeung, J., Brilakis, I., & Haas, C. (2015) · Advanced Engineering Informatics · doi:10.1016/j.aei.2015.01.001 · Cited by 328
Self-citationAutomated construction progress measurement using a 4D building information model and 3D data
Kim, C., Son, H., & Kim, C. (2013) · Automation in Construction · doi:10.1016/j.autcon.2012.11.041 · Cited by 317
Geographic Information Systems and Science
(2019) · IntechOpen eBooks · doi:10.5772/intechopen.75243 · Cited by 305
Data acquisition technologies for construction progress tracking
Omar, T., & Nehdi, M. L. (2016) · Automation in Construction · doi:10.1016/j.autcon.2016.06.016 · Cited by 284
Wang, Q., Tan, Y., & Mei, Z. (2020) · Archives of Computational Methods in Engineering · doi:10.1007/s11831-019-09320-4 · Cited by 272
Dimitrov, A., & Golparvar-Fard, M. (2014) · Advanced Engineering Informatics · doi:10.1016/j.aei.2013.11.002 · Cited by 261
Computational methodologies for optimal sensor placement in structural health monitoring: A review
Tan, Y., & Zhang, L. (2020) · Structural Health Monitoring · doi:10.1177/1475921719877579 · Cited by 186
Cyber-physical systems integration of building information models and the physical construction
Akanmu, A., & Anumba, C. J. (2015) · Engineering, Construction and Architectural Management · doi:10.1108/ecam-07-2014-0097 · Cited by 122
The role of geometric characterization in supporting structural steel reuse decisions
Yeung, J., Walbridge, S., & Haas, C. (2015) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2015.08.017 · Cited by 52
Self-citationCyber—physical systems development for construction applications
Anumba, C. J., Akanmu, A., Yuan, X., & Kan, C. (2021) · Frontiers of Engineering Management · doi:10.1007/s42524-020-0130-4 · Cited by 45
Metadata
- Authors
- Turkan, Y., Bosche, F., Haas, C. T., & Haas, R.
- Venue
- Automation in Construction
- Publisher
- Elsevier BV
- Published
- 2012-03
- Volume
- 22
- Pages
- 414-421
- ISSN
- 0926-5805 (ISSN-L)
- OpenAlex
- W2057531282
- Cited by
- 374
- References
- 17
- FWCI
- 27.69
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.