The DOI matches its Crossref record; 1 of the 1 references it cites were found in a registry or an index.
Evaluating stakeholder satisfaction during public participation in major infrastructure and construction projects: A fuzzy approach
Open accessAbstract
Numerous different and sometimes discrepant interests can be affected, both positively and negatively, throughout the course of a major infrastructure and construction (MIC) project. Failing to address and meet the concerns and expectations of the stakeholders involved has resulted in many project failures. One way to address this issue is through a participatory approach to project decision making. Whether the participation mechanism is effective or not depends largely on the client/owner. This paper provides a means of systematically evaluating the effectiveness of the public participation exercise, or even the whole project, through the measurement of stakeholder satisfaction. Since the process of satisfaction measurement is complicated and uncertain, requiring approximate reasoning involving human intuition, a fuzzy approach is adopted. From this, a multi-factor hierarchical fuzzy comprehensive evaluation model is established to facilitate the evaluation of satisfaction in both single stakeholder group and overall MIC project stakeholders.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
A Ladder Of Citizen Participation
Arnstein, S. R. (1969) · Journal of the American Institute of Planners · doi:10.1080/01944366908977225 · Cited by 17,064
Cited by
Ameyaw, E. E., & Chan, A. P. C. (2015) · Expert Systems with Applications · doi:10.1016/j.eswa.2015.02.041 · Cited by 265
Vera-Puerto, I., Valdes, H., Correa, C., Agredano, R., Vidal, G., Belmonte, M., Olave, J., & Arias, C. (2020) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2020.121717 · Cited by 38
Metadata
- Authors
- Li, T. H. Y., Ng, S. T., & Skitmore, M.
- Venue
- Automation in Construction
- Publisher
- Elsevier BV
- Published
- 2013-01
- Volume
- 29
- Pages
- 123-135
- ISSN
- 0926-5805 (ISSN-L)
- OpenAlex
- W2143381700
- Cited by
- 219
- References
- 1
- FWCI
- 7.16
- Type
- journal article
- Language
- en
- Open access
- green
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Evaluating stakeholder satisfaction during public participation in major infrastructure and construction projects: A fuzzy approach. https://app.cochat.ai/papers/10.1016/j.autcon.2012.09.007
- The paper
- Li, T. H. Y., Ng, S. T., & Skitmore, M. (2013). Evaluating stakeholder satisfaction during public participation in major infrastructure and construction projects: A fuzzy approach. Automation in Construction. https://doi.org/10.1016/j.autcon.2012.09.007
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.