The DOI matches its Crossref record.
A conceptual framework for integrating building information modeling with augmented reality
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
Environmental and scene modeling may require weeks or even months.
“whilst environmental and scene modeling may require weeks or even months.”
From Interface design and interaction optimization for spatial computing 3D content creation and immersive environment generation using Apple Vision Pro (2025) · cites this paper as Wang et al., 2013
Creating a commercial-grade character model takes an average of 40-60 hours.
“A survey of professional 3D modelers shows that creating a commercial-grade character model takes an average of 40-60 hours (Wang et al., 2013), whilst environmental and scene modeling may require weeks or even months.”
From Interface design and interaction optimization for spatial computing 3D content creation and immersive environment generation using Apple Vision Pro (2025) · cites this paper as Wang et al., 2013
Citations
Cites
No references could be resolved yet.
Research works printed but not linked: 25
- Froese, 2010, The impact of emerging information technology on project management for construction, Automation in Construction, 19, 531, 10.1016/j.autcon.2009.11.004 · DOI
- Love, 2011, Design error reduction: toward the effective utilization of Building Information Modelling, Research in Engineering Design, 22, 173, 10.1007/s00163-011-0105-x · DOI
- McGraw-Hill Construction, 2008
- Penttilä, 2006, Describing the changes in architectural information technology to design complexity and free form expression, Journal of Information Technology in Construction, 11, 395
- Dossick, 2009, Organizational divisions in BIM enabled commercial construction, ASCE Journal of Construction, Engineering and Management, 136, 459, 10.1061/(ASCE)CO.1943-7862.0000109 · DOI
- Taylor, 2009, Paradigm trajectories of building information modeling practice in project networks, ASCE Journal of Management in Engineering, 25, 69, 10.1061/(ASCE)0742-597X(2009)25:2(69) · DOI
- Milgram, 1994, A taxonomy of mixed reality visual displays, IEICE Transactions on Information and Systems, E77-D, 1321
- Singh, 2011, A theoretical framework of a BIM-based multi-disciplinary collaboration platform, Automation in Construction, 20, 134, 10.1016/j.autcon.2010.09.011 · DOI
- Dunston, 2005, Mixed Reality-based visualization interfaces for the AEC industry, ASCE Journal of Construction, Engineering and Management, 131, 1301, 10.1061/(ASCE)0733-9364(2005)131:12(1301) · DOI
- Wang, 2006, Compatibility issues in Augmented Reality systems for AEC: an experimental prototype study, Automation in Construction, 15, 314, 10.1016/j.autcon.2005.06.002 · DOI
- Wang, 2007, Using augmented reality to plan virtual construction worksite, International Journal of Advanced Robotic Systems, 4, 501, 10.5772/5677 · DOI
- Dunston, 2011, An iterative methodology for mapping mixed reality technologies to AEC operations, Journal of Information Technology in Construction, 16, 509
- Wang, 2007, Design, strategies, and issues towards an augmented reality-based construction training platform, Journal of Information Technology in Construction, 12, 363
- Wang, 2009, Augmented reality in architecture and design: potentials and challenges for application, International Journal of Architectural Computing, 7, 309, 10.1260/147807709788921985 · DOI
- Azuma, 1997, A survey of augmented reality, Presence: Teleoperators and Virtual Environment, 6, 355, 10.1162/pres.1997.6.4.355 · DOI · Paper page
- Dunston, 2011, A hierarchical taxonomy of AEC operations for mixed reality applications, Journal of Information Technology in Construction, 16, 433
- Love, 2009, Project pathogens: the anatomy of omission errors in construction and resource engineering projects, IEEE Transactions on Engineering Management, 56, 425, 10.1109/TEM.2008.927774 · DOI
- Wickens, 1995, Object versus space-based models of visual attention: implications for the design of head-up displays, Journal of Experimental Psychology. Applied, 1, 179, 10.1037/1076-898X.1.3.179 · DOI
- Arayici, 2011, Technology adoption in the BIM implementation for lean architectural practice, Automation in Construction, 20, 189, 10.1016/j.autcon.2010.09.016 · DOI
- Love, 1999, Rework: a symptom of a dysfunctional supply-chain, European Journal of Purchasing and Supply Management, 5, 1, 10.1016/S0969-7012(98)00017-3 · DOI
- Čuš Babič, 2010, Integrating resource production and construction using BIM, Automation in Construction, 19, 539, 10.1016/j.autcon.2009.11.005 · DOI
- Love, 2012, Moving beyond optimism bias and strategic misrepresentation: an explanation for social infrastructure project cost overruns, IEEE Transactions on Engineering Management, 99, 1
- Gu, 2010, Understanding and facilitating BIM adoption in the AEC industry, Automation in Construction, 19, 988, 10.1016/j.autcon.2010.09.002 · DOI
- Standing, 2007, Leveraging global markets: lessons from Alcoa Alumina, International Journal of Information Management, 27, 432, 10.1016/j.ijinfomgt.2007.08.005 · DOI
- Moum, 2010, Design team stories: exploring interdisciplinary use of 3D object models in practice, Automation in Construction, 19, 554, 10.1016/j.autcon.2009.11.007 · DOI
Cited by
Sorted by citations
Shi, Y., Du, J., & Worthy, D. A. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103367 · Cited by 82
Fu, J., Grierson, M., Jiang, R., Fu, S., He, M., & Xu, M. (2025) · Frontiers in Computer Science · doi:10.3389/fcomp.2025.1591289 · Cited by 1
Metadata
- Authors
- Wang, X., Love, P. E. D., Kim, M. J., Park, C.-S., Sing, C.-P., & Hou, L.
- Affiliations
- Curtin University (AU)
- Kyung Hee University (KR)
- Corresponding author
- Kim, Mi Jeong
- Venue
- Automation in Construction
- Publisher
- Elsevier BV
- Published
- 2013-09
- Volume
- 34
- Pages
- 37-44
- ISSN
- 0926-5805 (ISSN-L)
- OpenAlex
- W2074410689
- Cited by
- 263
- References
- 0
- Citations by year
- 2026: 10 · 2025: 16 · 2024: 22 · 2023: 19 · 2022: 25 · 2021: 37 · 2020: 28 · 2019: 25 · 2018: 21 · 2017: 17 · 2016: 6 · 2015: 13 · 2014: 19 · 2013: 3
- FWCI
- 21.14
- Type
- journal article
- Language
- en
- Open access
- closed
- Locations
- Automation in Construction (publishedVersion)
- RMIT Research Repository (RMIT University Library) (submittedVersion)
- eSpace (Curtin University) (submittedVersion)
- Figshare (submittedVersion)
- Topics
- Physical Sciences › Engineering › Building and Construction › BIM and Construction Integration
- Physical Sciences › Computer Science › Computer Vision and Pattern Recognition › Augmented Reality Applications
- Physical Sciences › Engineering › Architecture › Architecture and Computational Design
- Keywords
- building information modeling, augmented reality, real-time visualization, construction site communication, context awareness, ubiquitous computing, radio frequency identification, motion tracking, sensors, construction documentation
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review