Predicting construction cost overruns using text mining, numerical data and ensemble classifiers

Williams, Trefor P., Gong, Jie · 2014 · Automation in Construction

Overview

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1016/j.autcon.2014.02.014

Cites

1 of 1 references verified0 citation errors · 0 not checkable

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cites

Research works printed but not linked: 15

  1. Caldas, 2003, Automating hierarchical document classification for construction management information systems, Autom. Constr., 12, 395, 10.1016/S0926-5805(03)00004-9 · DOI · Paper page
  2. Soibelman, 2002, Data preparation process for construction knowledge generation through knowledge discovery in databases, J. Comput. Civil Eng., 16, 39, 10.1061/(ASCE)0887-3801(2002)16:1(39) · doi:10.1061/(asce)0887-3801(2002)16:1(39 · Paper page
  3. Soibelman, 2008, Management and analysis of unstructured construction data types, Adv. Eng. Inform., 22, 15, 10.1016/j.aei.2007.08.011 · doi:10.1016/j.aei.2007.08.011
  4. Son, 2012, Hybrid principal component analysis and support vector machine model for predicting the cost performance of commercial building projects using pre-project planning variables, Autom. Constr., 27, 60, 10.1016/j.autcon.2012.05.013 · DOI
  5. Gkritska, 2008, Estimating cost discrepancies in highway contracts: multistep econometric approach, J. Constr. Eng., 134, 953, 10.1061/(ASCE)0733-9364(2008)134:12(953) · doi:10.1061/(asce)0733-9364(2008)134:12(953
  6. Trost, 2003, Predicting accuracy of early cost estimates using factor analysis and multivariate regression, J. Constr. Eng., 129, 198, 10.1061/(ASCE)0733-9364(2003)129:2(198) · doi:10.1061/(asce)0733-9364(2003)129:2(198
  7. Nassar, 2005, Evaluating cost overruns of asphalt paving project using statistical process control methods, J. Constr. Eng., 131, 1173, 10.1061/(ASCE)0733-9364(2005)131:11(1173) · doi:10.1061/(asce)0733-9364(2005)131:11(1173
  8. Petroutsatou, 2011, Early cost estimating of road tunnel construction using neural networks, J. Constr. Eng., 138, 679, 10.1061/(ASCE)CO.1943-7862.0000479 · doi:10.1061/(asce)co.1943-7862.0000479
  9. Williams, 2005, Bidding ratios to predict highway project costs, Eng. Constr. Archit. Manag., 12, 38, 10.1108/09699980510576880 · doi:10.1108/09699980510576880
  10. Wilmot, 2003, Estimating future highway construction costs, J. Constr. Eng., 129, 272, 10.1061/(ASCE)0733-9364(2003)129:3(272) · doi:10.1061/(asce)0733-9364(2003)129:3(272
  11. Gaines, 1995, 1995, Induction of ripple-down rules applied to modeling large databases, J. Intell. Inf. Syst., 5, 211, 10.1007/BF00962234 · DOI · Paper page
  12. Ivanciuc, 2007, Applications of support vector machines in chemistry, Rev. Comput. Chem., 2007, 291, 10.1002/9780470116449.ch6 · DOI · Paper page
  13. Polikar, 2006, Ensemble based systems in decision making, IEEE Circuits Syst. Mag., 6, 21, 10.1109/MCAS.2006.1688199 · DOI · Paper page
  14. Saha, 2012, A comparative study on feature reduction approaches in Hindi and Bengali named entity recognition, Knowl. Based Syst., 27, 322, 10.1016/j.knosys.2011.09.015 · DOI
  15. Shane, 2009, Construction project cost escalation factors, J. Manag. Eng., 25, 221, 10.1061/(ASCE)0742-597X(2009)25:4(221) · doi:10.1061/(asce)0742-597x(2009)25:4(221 · Paper page

Cited by

See all 164

Metadata

Authors
Williams, T. P., & Gong, J.
Venue
Automation in Construction
Publisher
Elsevier BV
Published
2014-07
Volume
43
Pages
23-29
ISSN
0926-5805 (ISSN-L)
OpenAlex
W1975633953
Cited by
164
References
1
FWCI
9.45
Type
journal article
Language
en
Open access
closed
Licence
www.elsevier.com/tdm/userlicense/1.0/ (tdm)

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.