The DOI matches its Crossref record; 2 of the 2 references it cites were found in a registry or an index.
Using Mixed Reality for electrical construction design communication
Open accessAbstract
Building Information Modeling (BIM) techniques have enabled the construction industry to realize various benefits. However, most projects still rely on 2D drawings to communicate the 3D BIM content to construction personnel. While Mixed Reality (MR) could theoretically be the primary means of communicating BIM content to onsite personnel in 3D, there is not currently a thorough understanding of how this might impact the construction performance of industry practitioners. This paper explores this topic by examining the field of electrical construction. It addresses research questions related to: MR's influence on the productivity and quality of electrical conduit construction; and the effects of an industry practitioner's background on his or her performance using MR. To address these topics, a quasi-experiment was conducted that compares the performance of eighteen electrical construction personnel who were tasked with building similar conduit assemblies using traditional paper and MR. Participants completed pre- and post-activity questionnaires to provide their perceptions of the experience. The results suggest that MR enabled: a significantly higher productivity rate; reduced the time required to understand the design; led to fewer errors during the assembly process; and increased the number of accurately constructed conduits as compared to the conduits constructed using traditional paper. Additionally, nearly all participants agreed that MR is easy to use, but most still felt that they would prefer to use paper plans for design communication. The findings of this work were noteworthy because many of the participants had substantial prior experience constructing conduit using paper plans, yet they still performed the task better and faster using MR. While the small sample size limits the extent to which these findings can be generalized, the contribution of this work is in demonstrating, as a proof-of-concept, that MR can be a viable option for communicating existing BIM content to current industry practitioners and that it can offer advantages that are not currently observed through the use of a paper-based communication methods.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
The project benefits of Building Information Modelling (BIM)
Bryde, D., Broquetas, M., & Volm, J. M. (2013) · International Journal of Project Management · doi:10.1016/j.ijproman.2012.12.001 · Cited by 1,268
Construction Project Management
(2004) · Structural Survey · doi:10.1108/ss.2004.11022bae.009 · Cited by 340
Cited by
A research agenda for augmented and virtual reality in architecture, engineering and construction
Davila Delgado, J. M., Oyedele, L., Demian, P., & Beach, T. (2020) · Advanced Engineering Informatics · doi:10.1016/j.aei.2020.101122 · Cited by 486
From BIM to extended reality in AEC industry
Alizadehsalehi, S., Hadavi, A., & Huang, J. C. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103254 · Cited by 469
A survey of industrial augmented reality
de Souza Cardoso, L. F., Mariano, F. C. M. Q., & Zorzal, E. R. (2020) · Computers & Industrial Engineering · doi:10.1016/j.cie.2019.106159 · Cited by 322
Prebanić, K. R., & Vukomanović, M. (2021) · Sustainability · doi:10.3390/su132212690 · Cited by 93
Metadata
- Authors
- Chalhoub, J., & Ayer, S. K.
- Venue
- Automation in Construction
- Publisher
- Elsevier BV
- Published
- 2018-02
- Volume
- 86
- Pages
- 1-10
- ISSN
- 0926-5805 (ISSN-L)
- OpenAlex
- W2767299945
- Cited by
- 189
- References
- 2
- FWCI
- 10.30
- Type
- journal article
- Language
- en
- Open access
- hybrid
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.