Realizing the Need for Digital Transformation of Stakeholder Management: A Systematic Review in the Construction Industry
Open accessThe DOI matches its Crossref record; 94 of the 96 references it cites were found in a registry or an index.
Abstract
The construction industry is among the least digitized industries, and the lack of innovation in construction project management practices has led to decreases in productivity. The European Directives for Public Procurement are pushing the entire construction supply chain towards more radical digital transformations over the next years, and project managers are left with the difficult task to harness ICT for the involvement and management of project stakeholders. Digitalization of various processes and practices used to manage stakeholders in construction projects is still low, and part of this problem lies in weak systematization of ICT systems which support these practices. Thus, this paper provides a systematic review of how digitalization and digital transformation affect the way stakeholders behave, engage, and communicate in projects. Following the PRISMA methodology, 73 sources from the literature were chosen for the final analysis. Results are presented through descriptive and qualitative content analysis. Six research topics were identified and thoroughly analyzed. Results show that BIM, social network analysis, and web-based applications as means to digitalize stakeholder management are more mature than social media and VR/AR. An important finding is the need to reengineer and digitally transform processes in construction projects and construction firms to enable further digitalization and effectiveness of digital technologies. Suggestions for further studies follow this line of thought.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
The source backs part of the claim, not all of it — or backs it for a different population, condition or comparison.
In the citing paper
“Referred to as Industry 4.0, this transformative paradigm offers promising opportunities and a host of capabilities to enhance procurement processes [42].”
From Transformative Procurement Trends: Integrating Industry 4.0 Technologies for Enhanced Procurement Processes (2023) · cites this paper as [42]
Experimental — accuracy not yet measured
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Preferred reporting items for systematic reviews and meta-analyses: The PRISMA statement
Moher, D., Liberati, A., Tetzlaff, J., & Altman, D. G. (2010) · International Journal of Surgery · doi:10.1016/j.ijsu.2010.02.007 · Cited by 12,156 · cited 1×
“In this study, a selection and analysis of papers is conducted following the established PRISMA statement methodology [34], where PRISMA stands for “preferred reporting items for systematic reviews and meta-analyses”.”
MethodConducting content‐analysis based literature reviews in supply chain management
Seuring, S., & Gold, S. (2012) · Supply Chain Management: An International Journal · doi:10.1108/13598541211258609 · Cited by 1,245 · cited 6×
“We followed a two-step process approach elaborated in [35] of developing a pattern of analytic categories: after the basic frame of categories and dimensions (e.g., codes) has been established on the basis of existing theory, single categories are inductively refined during the coding process.”
MethodInfluentialStakeholder Theory: Reviewing a Theory That Moves Us
Laplume, A. O., Sonpar, K., & Litz, R. A. (2008) · Journal of Management · doi:10.1177/0149206308324322 · Cited by 1,185 · cited 1×
“For content analysis purposes, we iteratively developed precise codes related to our research topic [35] and presented them in a table codebook (Table 1) [36].”
MethodDeveloping design propositions through research synthesis
Denyer, D., Tranfield, D., & van Aken, J. E. (2008) · Organization Studies · doi:10.1177/0170840607088020 · Cited by 1,057 · cited 2×
“The SLR approach is consistent with suggestions made by [33,35].”
BackgroundA Guide to the Project Management Body of Knowledge (PMBOK Guide) Fifth Edition
Rose, K. H. (2013) · Project Management Journal · doi:10.1002/pmj.21345 · Cited by 692
Visualising and mapping stakeholder influence
Bourne, L., & Walker, D. H. T. (2005) · Management Decision · doi:10.1108/00251740510597680 · Cited by 476
Stakeholder impact analysis in construction project management
Olander, S. (2007) · Construction Management and Economics · doi:10.1080/01446190600879125 · Cited by 474
Understanding effects of BIM on collaborative design and construction: An empirical study in China
Liu, Y., van Nederveen, S., & Hertogh, M. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2016.06.007 · Cited by 411 · cited 3×
“Liu et al. [59] echo the BIM-coordinating architect they interviewed that it is not right to bear the responsibility for the BIM model if other project participants drew it, and they conclude that there are too many unaddressed obligation issues in current BIM practices.”
BackgroundMethodHeydarian, A., Carneiro, J. P., Gerber, D., Becerik-Gerber, B., Hayes, T., & Wood, W. (2015) · Automation in Construction · doi:10.1016/j.autcon.2015.03.020 · Cited by 369 · cited 1×
“…improvements to make VR/AR more adjusted to the communication needs of AEC industry stakeholders [71], and one research stream should deal with improving the accuracy of the data collected and analyzed in such environments so that they represent physical environments more realistically [69,101].”
BackgroundYang, R. J., & Zou, P. X. W. (2014) · Building and Environment · doi:10.1016/j.buildenv.2013.12.014 · Cited by 321 · cited 1×
“In different contexts, SNA was used either to identify key stakeholder(s) [49,87,90], which requires an analysis of network node characteristics, or to analyze the whole inter-organizational communication network [91,92], which focuses on overall network measures.”
Method
Research works printed but not linked: 3
- Adriaanse, 2004, Alignment between ICT and Communication in Construction Projects, Int. J. Hum. Resour. Dev. Manag., 4, 346, 10.1504/IJHRDM.2004.005043 · doi:10.1504/ijhrdm.2004.005043
- Fink, A. (2014). Conducting Research Literature Reviews: From the Internet to Paper, SAGE Publications Inc.. [4th ed.].
- Winch, G.M. (2010). Managing Construction Projects, Wiley-Blackwell.
Cited by
Martínez-Peláez, R., Ochoa-Brust, A., Rivera, S., Félix, V. G., Ostos, R., Brito, H., Félix, R. A., & Mena, L. J. (2023) · Sustainability · doi:10.3390/su151411221 · Cited by 553
Althabatah, A., Yaqot, M., Menezes, B., & Kerbache, L. (2023) · Logistics · doi:10.3390/logistics7030063 · Cited by 108
“Referred to as Industry 4.0, this transformative paradigm offers promising opportunities and a host of capabilities to enhance procurement processes [42].”
BackgroundInfluentialDigital transformation and marketing: a systematic and thematic literature review
Cioppi, M., Curina, I., Francioni, B., & Savelli, E. (2023) · Italian Journal of Marketing · doi:10.1007/s43039-023-00067-2 · Cited by 160
“…Thekkoote, 2022), production 209 1 3 Italian Journal of Marketing (2023) 2023:207–288 applications (D’Almeida et al., 2022), business management adaptability (Zhang et al., 2021), stakeholder management (Prebanić and Vukomanović, 2021), and sustainability (Gomez-Trujillo and Gonzalez-Perez, 2021).”
BackgroundExploring Stakeholder Engagement Process as the Success Factor for Infrastructure Projects
Prebanić, K. R., & Vukomanović, M. (2023) · Buildings · doi:10.3390/buildings13071785 · Cited by 107
Self-citationZhang, G., Wang, T., Wang, Y., Zhang, S., Lin, W., Dou, Z., & Du, H. (2023) · Sustainability · doi:10.3390/su15076317 · Cited by 56
Metadata
- Authors
- Prebanić, K. R., & Vukomanović, M.
- Affiliations
- University of Zagreb (HR)
- Corresponding author
- Prebanić, Kristijan Robert
- Venue
- Sustainability
- Publisher
- MDPI AG
- Published
- 2021-11-16
- Volume
- 13
- Issue
- 22
- Pages
- 12690
- ISSN
- 2071-1050 (ISSN-L)
- OpenAlex
- W3211453731
- Cited by
- 93
- References
- 96
- Citations by year
- 2026: 16 · 2025: 24 · 2024: 23 · 2023: 25 · 2022: 5
- FWCI
- 1.22
- Type
- journal article
- Language
- en
- Open access
- gold
- doi.org
- Licence
- Locations
- Sustainability (publishedVersion, cc-by)
- RePEc: Research Papers in Economics (submittedVersion)
- DOAJ (DOAJ: Directory of Open Access Journals) (submittedVersion, cc-by-sa)
- Topics
- Physical Sciences › Engineering › Building and Construction › BIM and Construction Integration
- Social Sciences › Decision Sciences › Management Science and Operations Research › Construction Project Management and Performance
- Physical Sciences › Engineering › Building and Construction › Construction Management and Sustainability
- Keywords
- stakeholder management, digital transformation, construction industry, construction project management, ICT in construction, building information modeling, social network analysis, web application, social media, virtual and augmented reality, stakeholder engagement, stakeholder communication, public procurement directives, process reengineering
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Realizing the Need for Digital Transformation of Stakeholder Management: A Systematic Review in the Construction Industry. https://app.cochat.ai/papers/10.3390/su132212690
- The paper
- Prebanić, K. R., & Vukomanović, M. (2021). Realizing the Need for Digital Transformation of Stakeholder Management: A Systematic Review in the Construction Industry. Sustainability. https://doi.org/10.3390/su132212690
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.