Site logistics planning and control for engineer-to-order prefabricated building systems using BIM 4D modeling
Open accessThe DOI matches its Crossref record; 2 of the 2 references it cites were found in a registry or an index.
Abstract
There has been a growing demand for engineer-to-order (ETO) prefabricated building systems, in which a unique product must fulfill the requirements of specific clients. Although industrialized building systems can potentially simplify the production process, there is usually a high level of complexity in ETO production systems, such as uncertainty in client demands, short lead-time, overlapping between project stages, and resources that are shared among different projects. In this context, logistics management plays a key role in terms of achieving project goals related to cost, time and safety. This research work proposes the combined use of principles from the Lean Production Philosophy and Building Information Modeling (BIM), as a mechanism to cope with the complexity involved in those types of projects. Although these can be regarded as two separate approaches for improving the performance of production systems in the construction industry, there are evidences that there is much synergy between them. This paper reports the development of a logistics planning and control model for site assembly of ETO prefabricated building systems using BIM 4D modeling. The main theoretical contribution of this research work is the understanding of the synergies between Lean principles and BIM functionalities that are applicable to site logistics management, providing an example of how this body of knowledge can be expanded. This investigation also provides some practical contributions on how to carry out logistics planning and control at different hierarchical levels, with the support of BIM 4D modeling, aligning this process with the Last Planner System of production control. Design science research was the methodological approach adopted in this investigation, and the proposed model was developed and tested in empirical studies carried out in a steel fabricator company that designs, fabricates and assemblies steel structures.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Design Science in Information Systems Research1
Hevner, A. R., March, S. T., Park, J., & Ram, S. (2004) · MIS Quarterly · doi:10.2307/25148625 · Cited by 10,707
Design science in information systems research
(2004) · Journal of the Association for Information Systems · doi:10.5555/2017212.2017217 · Cited by 8,254
Cited by
Integrating BIM and AI for Smart Construction Management: Current Status and Future Directions
Pan, Y., & Zhang, L. (2023) · Archives of Computational Methods in Engineering · doi:10.1007/s11831-022-09830-8 · Cited by 441
Núñez-Merino, M., Maqueira-Marín, J. M., Moyano-Fuentes, J., & Martínez-Jurado, P. J. (2020) · International Journal of Production Research · doi:10.1080/00207543.2020.1743896 · Cited by 382
Wang, M., Wang, C. C., Sepasgozar, S., & Zlatanova, S. (2020) · Buildings · doi:10.3390/buildings10110204 · Cited by 357
Metadata
- Authors
- Bortolini, R., Formoso, C. T., & Viana, D. D.
- Venue
- Automation in Construction
- Publisher
- Elsevier BV
- Published
- 2019-02
- Volume
- 98
- Pages
- 248-264
- ISSN
- 0926-5805 (ISSN-L)
- OpenAlex
- W2903741251
- Cited by
- 211
- References
- 2
- FWCI
- 12.13
- Type
- journal article
- Language
- en
- Open access
- green
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.