CoChat

Site logistics planning and control for engineer-to-order prefabricated building systems using BIM 4D modeling

Open access
Bortolini, Rafaela, Formoso, Carlos Torres, Viana, Daniela D. · 2019 · Automation in Construction
Cited by 211

The DOI matches its Crossref record; 2 of the 2 references it cites were found in a registry or an index.

Abstract

There has been a growing demand for engineer-to-order (ETO) prefabricated building systems, in which a unique product must fulfill the requirements of specific clients. Although industrialized building systems can potentially simplify the production process, there is usually a high level of complexity in ETO production systems, such as uncertainty in client demands, short lead-time, overlapping between project stages, and resources that are shared among different projects. In this context, logistics management plays a key role in terms of achieving project goals related to cost, time and safety. This research work proposes the combined use of principles from the Lean Production Philosophy and Building Information Modeling (BIM), as a mechanism to cope with the complexity involved in those types of projects. Although these can be regarded as two separate approaches for improving the performance of production systems in the construction industry, there are evidences that there is much synergy between them. This paper reports the development of a logistics planning and control model for site assembly of ETO prefabricated building systems using BIM 4D modeling. The main theoretical contribution of this research work is the understanding of the synergies between Lean principles and BIM functionalities that are applicable to site logistics management, providing an example of how this body of knowledge can be expanded. This investigation also provides some practical contributions on how to carry out logistics planning and control at different hierarchical levels, with the support of BIM 4D modeling, aligning this process with the Last Planner System of production control. Design science research was the methodological approach adopted in this investigation, and the proposed model was developed and tested in empirical studies carried out in a steel fabricator company that designs, fabricates and assemblies steel structures.

Overview

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1016/j.autcon.2018.11.031

Cites

2 of 2 references verified0 citation errors · 0 not checkable

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cites

Cited by

See all 211

Metadata

Authors
Bortolini, R., Formoso, C. T., & Viana, D. D.
Venue
Automation in Construction
Publisher
Elsevier BV
Published
2019-02
Volume
98
Pages
248-264
ISSN
0926-5805 (ISSN-L)
OpenAlex
W2903741251
Cited by
211
References
2
FWCI
12.13
Type
journal article
Language
en
Open access
green

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.