Hard-rock tunnel lithology prediction with TBM construction big data using a global-attention-mechanism-based LSTM network
The DOI matches its Crossref record; 7 of the 7 references it cites were found in a registry or an index.
Abstract
The TBM-constructed rock tunnel often suffers from low comparability of efficiency between geological condition detection and the TBM real-time operation requirements. This article developed a time-related intelligent model for tunnel lithology prediction using TBM construction big data with illustration by the Yinsong Water Diversion Project. The global attention mechanism based long-short-term-memory (LSTM) network was established to model the cyclic TBM construction data and make predictions of lithology at the tunnel face with 9 selected featuring input parameters. The established global-attention-mechanism-based LSTM network was found to predict well tunnel lithology with TBM construction data and outperformed the conventional LSTM network and other models in accuracy and F1-scores. The results could help the TBM drivers to adjust the operational parameters at real time for high-efficient tunnel construction. With implementation of the establish model into the TBM operational system, we will develop intelligence construction mode for the long TBM-constructed hard rock tunnels.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Breiman, L. (2001) · Machine Learning · doi:10.1023/a:1010933404324 · Cited by 133,538
Adam: A Method for Stochastic Optimization
Kingma, D. P., & Ba, J. (2014) · arXiv · doi:10.48550/arxiv.1412.6980 · Cited by 98,946
A simulation study of the number of events per variable in logistic regression analysis
Peduzzi, P., Concato, J., Kemper, E., Holford, T. R., & Feinstein, A. R. (1996) · Journal of Clinical Epidemiology · doi:10.1016/s0895-4356(96)00236-3 · Cited by 9,655
Effective Approaches to Attention-based Neural Machine Translation
Luong, T., Pham, H., & Manning, C. D. (2015) · Proceedings of the 2015 Conference on Empirical Methods in Natural Language Processing · doi:10.18653/v1/d15-1166 · Cited by 8,382
Improving neural networks by preventing co-adaptation of feature detectors
Hinton, G. E., Srivastava, N., Krizhevsky, A., Sutskever, I., & Salakhutdinov, R. R. (2012) · arXiv · doi:10.48550/arxiv.1207.0580 · Cited by 6,382
Sensitivity Analysis of k-Fold Cross Validation in Prediction Error Estimation
Rodriguez, J. D., Perez, A., & Lozano, J. A. (2010) · IEEE Transactions on Pattern Analysis and Machine Intelligence · doi:10.1109/tpami.2009.187 · Cited by 1,890
Holgado–Tello, F. P., Chacón–Moscoso, S., Barbero–García, I., & Vila–Abad, E. (2010) · Quality & Quantity · doi:10.1007/s11135-008-9190-y · Cited by 1,200
Cited by
Hou, S., Liu, Y., & Yang, Q. (2022) · Journal of Rock Mechanics and Geotechnical Engineering · doi:10.1016/j.jrmge.2021.05.004 · Cited by 267
A Review of Artificial Intelligence in Enhancing Architectural Design Efficiency
Li, Y., Chen, H., Yu, P., & Yang, L. (2025) · Applied Sciences · doi:10.3390/app15031476 · Cited by 76
Metadata
- Authors
- Liu, Z., Li, L., Fang, X., Qi, W., Shen, J., Zhou, H., & Zhang, Y.
- Venue
- Automation in Construction
- Publisher
- Elsevier BV
- Published
- 2021-05
- Volume
- 125
- Pages
- 103647
- ISSN
- 0926-5805 (ISSN-L)
- OpenAlex
- W3134148588
- Cited by
- 208
- References
- 7
- FWCI
- 15.96
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.