The DOI matches its Crossref record; 38 of the 38 references it cites were found in a registry or an index.
Application of the analytic hierarchy process (AHP) in multi-criteria analysis of the selection of intelligent building systems
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“Developer resistance not to coordinate with DevOps security team [57], [76], [77] slow-downs the whole deployment process, as no proper measures were taken to control security threats during development phase.”
From Prioritization based taxonomy of DevOps security challenges using PROMETHEE (2020) · cites this paper as [76]
Citations
Cites
Fundamentals of Decision Making and Priority Theory With the Analytic Hierarchy Process
Saaty, T. L. (2000) · Medical Entomology and Zoology · Cited by 2,649
Application of the AHP in project management
Al‐Harbi, K. M. A. (2001) · International Journal of Project Management · doi:10.1016/s0263-7863(99)00038-1 · Cited by 1,141
Feature deduction and ensemble design of intrusion detection systems
Chebrolu, S., Abraham, A., & Thomas, J. P. (2004) · Computers & Security · doi:10.1016/j.cose.2004.09.008 · Cited by 608
Intelligent building research: a review
Wong, J. K. W., Li, H., & Wang, S. (2004) · Automation in Construction · doi:10.1016/j.autcon.2004.06.001 · Cited by 412
Self-citationFinal contractor selection using the analytical hierarchy process
Fong, P. S. W., & Choi, S. K.-Y. (2000) · Construction Management and Economics · doi:10.1080/014461900407356 · Cited by 335
Construction Partnering Process and Associated Critical Success Factors: Quantitative Investigation
Cheng, E. W. L., & Li, H. (2002) · Journal of Management in Engineering · doi:10.1061/(asce)0742-597x(2002)18:4(194 · Cited by 319
Self-citationEvaluation of Advanced Construction Technology with AHP Method
Skibniewski, M. J., & Chao, L. (1992) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1992)118:3(577 · Cited by 244
An application of quality function deployment to improve the quality of teaching
Lam, K., & Zhao, X. (1998) · International Journal of Quality & Reliability Management · doi:10.1108/02656719810196351 · Cited by 238
An analytical hierarchy process based procurement selection method
Cheung, S. O., Lam, T.-I., Leung, M., & Wan, Y.-W. (2001) · Construction Management and Economics · doi:10.1080/014461901300132401 · Cited by 166
Love, P. E. D., Irani, Z., & Edwards, D. J. (2004) · Automation in Construction · doi:10.1016/j.autcon.2004.02.002 · Cited by 145
Design and Construction: Building in Value
Best, R., & de Valence, G. (2002) · Cited by 138
Alcalá, R., Casillas, J., Cordón, Ó., González, A., & Herrera, F. (2004) · Engineering Applications of Artificial Intelligence · doi:10.1016/j.engappai.2004.09.007 · Cited by 128
A multicriteria lifespan energy efficiency approach to intelligent building assessment
Chen, Z., Clements-Croome, D. J., Hong, J. Y., Li, H., & Xu, Q. (2005) · Energy and Buildings · doi:10.1016/j.enbuild.2005.08.001 · Cited by 128
Self-citationA multi-attribute utility model for dispute resolution strategy selection
Cheung, S. O., & Suen, H. C. H. (2002) · Construction Management and Economics · doi:10.1080/01446190210157568 · Cited by 114
BACnetTM: a standard communication infrastructure for intelligent buildings
Bushby, S. T. (1997) · Automation in Construction · doi:10.1016/s0926-5805(97)00029-0 · Cited by 108
Multi‐attribute analysis of ISO 9000 registration using AHP
Crowe, T. J., Noble, J. S., & Machimada, J. S. (1998) · International Journal of Quality & Reliability Management · doi:10.1108/02656719810368495 · Cited by 95
Decision support to the application of intelligent building technologies
Yang, J., & Peng, H. (2001) · Renewable Energy · doi:10.1016/s0960-1481(00)00085-9 · Cited by 90
Intelligent office building performance evaluation
Preiser, W., & Schramm, U. (2002) · Facilities · doi:10.1108/02632770210435198 · Cited by 74
So, A. T. P., & Chan, W. L. (1999) · The Kluwer international series on Asian studies in computer and information science · doi:10.1007/978-1-4615-5019-8 · Cited by 73
Development of a conceptual model for the selection of intelligent building systems
Wong, J. K. W., & Li, H. (2005) · Building and Environment · doi:10.1016/j.buildenv.2005.04.021 · Cited by 69
Self-citationAtif, M. R., & Galasiu, A. D. (2003) · Energy and Buildings · doi:10.1016/s0378-7788(02)00142-1 · Cited by 68
Evaluating intelligent buildings according to level of service systems integration
Arkin, H., & Paciuk, M. (1997) · Automation in Construction · doi:10.1016/s0926-5805(97)00025-3 · Cited by 67
Advanced automation or conventional construction process?
Hastak, M. (1998) · Automation in Construction · doi:10.1016/s0926-5805(98)00047-8 · Cited by 60
Intelligent Buildings in South East Asia
Harrison, A., Loe, E., & Read, J. E. (2005) · Taylor & Francis eBooks · doi:10.4324/9780203982488 · Cited by 42
Environmental Comfort Criteria: Weighting and Integration
Reffat, R. M., & Harkness, E. L. (2001) · Journal of Performance of Constructed Facilities · doi:10.1061/(asce)0887-3828(2001)15:3(104 · Cited by 39
Towards a Performance-Based Conceptual Framework for Systematic Poes
Preiser, W. (1989) · Springer eBooks · doi:10.1007/978-1-4899-3722-3_1 · Cited by 37
Evacuation with smoke control for atria in green and sustainable buildings
Chow, W. K., & Chow, C. L. (2004) · Building and Environment · doi:10.1016/j.buildenv.2004.07.008 · Cited by 36
Pan, Y., Hui, Z., Huang, Z., Zeng, Y. J., & Long, W. (2003) · Energy and Buildings · doi:10.1016/s0378-7788(02)00245-1 · Cited by 32
Is IP everywhere the way ahead for building automation?
Finch, E. F. (2001) · Facilities · doi:10.1108/02632770110403365 · Cited by 27
Intelligent building systems in Hong Kong offices
Cho, M. C. T., & Fellows, R. F. (2000) · Facilities · doi:10.1108/02632770010328072 · Cited by 19
A matrix tool for assessing the performance of intelligent buildings
Kolokotsa, D. D., Sutherland, G., Stavrakakis, G. M., Karatasou, S., & Santamouris, M. (2007) · Management of Environmental Quality An International Journal · doi:10.1108/14777830710717703 · Cited by 17
Expert System for Environmental Quality Evaluation
Reffat, R. M., & Harkness, E. L. (2001) · Journal of Performance of Constructed Facilities · doi:10.1061/(asce)0887-3828(2001)15:3(109 · Cited by 15
Building automation systems on the Internet
So, A. T. P., Chan, W. L., & Tse, W. L. (1997) · Facilities · doi:10.1108/02632779710162115 · Cited by 11
High-technology buildings and the information economy
Gann, D. (1990) · Habitat International · doi:10.1016/0197-3975(90)90047-5 · Cited by 7
Remote building control using the Internet
Finch, E. F. (1998) · Facilities · doi:10.1108/02632779810235672 · Cited by 6
Proving the benefits ‐ justifying the costs of intelligent systems
Loe, E. (1996) · Facilities · doi:10.1108/02632779610108530 · Cited by 6
Johnson, T. A., & Tucker, J. M. (1998) · Traffic Technology International · Cited by 5
(1980) · Andalas University Repository (Andalas University)
Flagged first, then by citations
Research works printed but not linked: 3
- Smith S. The use of quality functional deployment in the design of the office of the future. In: Proceedings of the second international conference on construction management, Sydney; 1999. p. 146–55.
- Trankler HR, Kanoun O. Sensor systems in intelligent buildings. In: Gassmann O, Meixner H, editors. Hesse J., Gardner JW, Gopel W, series editors. Sensor application, vol. 2: Sensors in Intelligent Buildings; 2001.
- Sobchak, 2003, Upping a building's IQ, Building, 53, 52
Cited by
Sorted by citations
Mardani, A., Jusoh, A., Nor, K. M., Khalifah, Z., Zakwan, N. M., & Valipour, A. (2015) · Economic Research-Ekonomska Istraživanja · doi:10.1080/1331677x.2015.1075139 · Cited by 1,223
The analytic hierarchy process and analytic network process: an overview of applications
Sipahi, S., & Timor, M. (2010) · Management Decision · doi:10.1108/00251741011043920 · Cited by 602
Multi-criteria evaluation model for the selection of sustainable materials for building projects
Akadiri, P. O., Olomolaiye, P. O., & Chinyio, E. (2012) · Automation in Construction · doi:10.1016/j.autcon.2012.10.004 · Cited by 389
AlWaer, H., & Clements-Croome, D. J. (2009) · Building and Environment · doi:10.1016/j.buildenv.2009.08.019 · Cited by 359
Ameen, R. F. M., & Mourshed, M. M. (2018) · Sustainable Cities and Society · doi:10.1016/j.scs.2018.10.020 · Cited by 278
Metadata
- Authors
- Wong, J. K. W., & Li, H.
- Affiliations
- Hong Kong Polytechnic University (HK)
- Corresponding author
- Wong, Johnny K.W.
- Venue
- Building and Environment
- Publisher
- Elsevier BV
- Published
- 2008-01
- Volume
- 43
- Issue
- 1
- Pages
- 108-125
- ISSN
- 0360-1323 (ISSN-L)
- OpenAlex
- W2016714167
- Cited by
- 432
- References
- 38
- Citations by year
- 2026: 10 · 2025: 19 · 2024: 25 · 2023: 25 · 2022: 44 · 2021: 41 · 2020: 46 · 2019: 31 · 2018: 18 · 2017: 22 · 2016: 16 · 2015: 22 · 2014: 21 · 2013: 26 · 2012: 13
- FWCI
- 18.65
- Type
- journal article
- Language
- en
- Open access
- closed
- Locations
- Building and Environment (publishedVersion)
- PolyU Institutional Research Archive (Hong Kong Polytechnic University) (submittedVersion)
- Topics
- Social Sciences › Decision Sciences › Management Science and Operations Research › Multi-Criteria Decision Making
- Physical Sciences › Engineering › Building and Construction › BIM and Construction Integration
- Physical Sciences › Engineering › Building and Construction › Sustainable Building Design and Assessment
- Keywords
- smart buildings, selection criteria, analytic hierarchy process, multi-criteria decision making, criteria weighting, work efficiency, user comfort, cost-effectiveness, reliability, operation and maintenance costs, expert survey
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review