The DOI matches its Crossref record; 44 of the 44 references it cites were found in a registry or an index.
Real-time scheduling for a smart factory using a reinforcement learning approach
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Citations
Cites
LeCun, Y., Bengio, Y., & Hinton, G. (2015) · Nature · doi:10.1038/nature14539 · Cited by 84,126
The Nature of Statistical Learning Theory
Vapnik, V. (2000) · Statistics for Engineering and Information Science · doi:10.1007/978-1-4757-3264-1 · Cited by 46,387
Data mining: concepts and techniques
Sharma, R., Shah, K., Shirahatti, Y., Patel, S., Sharma, R., Shah, K., Patel, S., Sharma, R., & Han, J. (2012) · Choice Reviews Online · doi:10.5860/choice.49-3305 · Cited by 28,665
Reinforcement Learning: An Introduction
Sutton, R. S., & Barto, A. G. (1998) · IEEE Transactions on Neural Networks · doi:10.1109/tnn.1998.712192 · Cited by 27,225
Reinforcement Learning: An Introduction
Sutton, R. S., & Barto, A. (2005) · IEEE Transactions on Neural Networks · doi:10.1109/tnn.2004.842673 · Cited by 25,268
Davies, D. L., & Bouldin, D. W. (1979) · IEEE Transactions on Pattern Analysis and Machine Intelligence · doi:10.1109/tpami.1979.4766909 · Cited by 9,145
Watkins, C. J. C. H., & Dayan, P. (1992) · Machine Learning · doi:10.1007/bf00992698 · Cited by 9,083
Learning Deep Architectures for AI
Bengio, Y. (2009) · Foundations and Trends® in Machine Learning · doi:10.1561/2200000006 · Cited by 7,330
A Cyber-Physical Systems architecture for Industry 4.0-based manufacturing systems
Lee, J., Bagheri, B., & Kao, H.-A. (2015) · Manufacturing Letters · doi:10.1016/j.mfglet.2014.12.001 · Cited by 5,113
Learning Deep Architectures for AI
Bengio, Y. (2009) · now publishers, Inc. eBooks · doi:10.1561/9781601982957 · Cited by 5,050
Research works printed but not linked: 1
- Herrmann, M., Pentek, T., & Otto, B. (2016). Design principles for industrie 4.0 scenarios. In: 49th Hawaii international conference on system sciences, Koloa, HI, USA (pp. 3928–3937).
Cited by
Sorted by citations
Zhang, J., & Tao, D. (2021) · IEEE Internet of Things Journal · doi:10.1109/jiot.2020.3039359 · Cited by 774
Dynamic scheduling for flexible job shop with new job insertions by deep reinforcement learning
Luo, S. (2020) · Applied Soft Computing · doi:10.1016/j.asoc.2020.106208 · Cited by 593
Cadavid, J. P. U., Lamouri, S., Grabot, B., Pellerin, R., & Fortin, A. (2020) · Journal of Intelligent Manufacturing · doi:10.1007/s10845-019-01531-7 · Cited by 420
Smart Manufacturing Scheduling With Edge Computing Using Multiclass Deep Q Network
Lin, C., Deng, D., Chih, Y.-L., & Chiu, H.-T. (2019) · IEEE Transactions on Industrial Informatics · doi:10.1109/tii.2019.2908210 · Cited by 352
Firdose, S., Avgeris, M., Spatharakis, D., Santi, N., Dechouniotis, D., Violos, J., Leivadeas, A., Αθανασόπουλος, Ν., Mitton, N., & Papavassiliou, S. (2021) · Computer Networks · doi:10.1016/j.comnet.2021.108177 · Cited by 283
Zhang, Y., Zhu, H., Tang, D., Zhou, T., & Gui, Y. (2022) · Robotics and Computer-Integrated Manufacturing · doi:10.1016/j.rcim.2022.102412 · Cited by 263
Li, Y., Gu, W., Yuan, M., & Tang, Y. (2021) · Robotics and Computer-Integrated Manufacturing · doi:10.1016/j.rcim.2021.102283 · Cited by 262
Dynamic multi-objective scheduling for flexible job shop by deep reinforcement learning
Luo, S., Zhang, L., & Fan, Y. (2021) · Computers & Industrial Engineering · doi:10.1016/j.cie.2021.107489 · Cited by 272
Fahle, S., Prinz, C., & Kuhlenkötter, B. (2020) · Procedia CIRP · doi:10.1016/j.procir.2020.04.109 · Cited by 257
Hu, H., Jia, X., He, Q., Fu, S., & Liu, K. (2020) · Computers & Industrial Engineering · doi:10.1016/j.cie.2020.106749 · Cited by 254
Production scheduling in the context of Industry 4.0: review and trends
Parente, M. A., Figueira, G., Amorim, P., & Marques, A. S. (2020) · International Journal of Production Research · doi:10.1080/00207543.2020.1718794 · Cited by 236
Li, R., Gong, W., Lu, C., & Wang, L. (2022) · IEEE Transactions on Evolutionary Computation · doi:10.1109/tevc.2022.3175832 · Cited by 231
Ghaleb, M. A., Zolfagharinia, H., & Taghipour, S. (2020) · Computers & Operations Research · doi:10.1016/j.cor.2020.105031 · Cited by 223
A reinforcement learning based RMOEA/D for bi-objective fuzzy flexible job shop scheduling
Li, R., Gong, W., & Lu, C. (2022) · Expert Systems with Applications · doi:10.1016/j.eswa.2022.117380 · Cited by 215
Dynamic scheduling for flexible job shop using a deep reinforcement learning approach
Gui, Y., Tang, D., Zhu, H., Zhang, Y., & Zhang, Z. (2023) · Computers & Industrial Engineering · doi:10.1016/j.cie.2023.109255 · Cited by 196
A Reinforcement Learning Approach to Robust Scheduling of Semiconductor Manufacturing Facilities
Park, I.-B., Huh, J., Kim, J., & Park, J. (2019) · IEEE Transactions on Automation Science and Engineering · doi:10.1109/tase.2019.2956762 · Cited by 197
Adaptive scheduling for assembly job shop with uncertain assembly times based on dual Q-learning
Wang, H., Sarker, B. R., Li, J., & Li, J. (2020) · International Journal of Production Research · doi:10.1080/00207543.2020.1794075 · Cited by 183
Kayhan, B. M., & Yildiz, G. (2021) · Journal of Intelligent Manufacturing · doi:10.1007/s10845-021-01847-3 · Cited by 174
Development capabilities for smart products
Tomiyama, T., Lutters, E., Stark, R., & Abramovici, M. (2019) · CIRP Annals · doi:10.1016/j.cirp.2019.05.010 · Cited by 179
Designing an adaptive production control system using reinforcement learning
Kuhnle, A., Kaiser, J.-P., Theiß, F., Stricker, N., & Lanza, G. (2020) · Journal of Intelligent Manufacturing · doi:10.1007/s10845-020-01612-y · Cited by 176
Reinforcement learning applied to production planning and control
Esteso, A., Peidro, D., Mula, J., & Díaz‐Madroñero, M. (2022) · International Journal of Production Research · doi:10.1080/00207543.2022.2104180 · Cited by 175
Theoretical approaches to AI in supply chain optimization: Pathways to efficiency and resilience
Abaku, E. A., Edunjobi, T. E., & Odimarha, A. C. (2024) · International Journal of Science and Technology Research Archive · doi:10.53771/ijstra.2024.6.1.0033 · Cited by 149
Deep Reinforcement Learning for Dynamic Flexible Job Shop Scheduling with Random Job Arrival
Chang, J., Yu, D., Hu, Y., He, W., & Yu, H. (2022) · Processes · doi:10.3390/pr10040760 · Cited by 147
Qin, Z., & Lu, Y. (2021) · Journal of Manufacturing Systems · doi:10.1016/j.jmsy.2021.04.016 · Cited by 146
Ghaleb, M. A., Taghipour, S., & Zolfagharinia, H. (2021) · Journal of Manufacturing Systems · doi:10.1016/j.jmsy.2021.09.018 · Cited by 146
Kim, Y. G., Lee, S., Son, J., Bae, H., & Chung, B. D. (2020) · Journal of Manufacturing Systems · doi:10.1016/j.jmsy.2020.11.004 · Cited by 133
AI-enabled Enterprise Information Systems for Manufacturing
Zdravković, M. M., Panetto, H., & Weichhart, G. (2021) · Enterprise Information Systems · doi:10.1080/17517575.2021.1941275 · Cited by 159
Zhang, M., Wang, L., Qiu, F., & Liu, X. (2023) · Computers & Industrial Engineering · doi:10.1016/j.cie.2023.109718 · Cited by 121
Production planning and scheduling in Cyber-Physical Production Systems: a review
Rossit, D. A., Tohmé, F., & Frutos, M. (2019) · International Journal of Computer Integrated Manufacturing · doi:10.1080/0951192x.2019.1605199 · Cited by 109
DeepMAG: Deep reinforcement learning with multi-agent graphs for flexible job shop scheduling
Zhang, J.-D., He, Z., Chan, W.-H., & Chow, C.-Y. (2022) · Knowledge-Based Systems · doi:10.1016/j.knosys.2022.110083 · Cited by 111
Intelligent scheduling of discrete automated production line via deep reinforcement learning
Shi, D., Fan, W., Xiao, Y., Lin, T.-Y., & Xing, C. (2020) · International Journal of Production Research · doi:10.1080/00207543.2020.1717008 · Cited by 104
Smart Production Planning and Control: Concept, Use-Cases and Sustainability Implications
Oluyisola, O., Sgarbossa, F., & Strandhagen, J. (2020) · Sustainability · doi:10.3390/su12093791 · Cited by 89
Dynamic Jobshop Scheduling Algorithm Based on Deep Q Network
Zhao, Y., Wang, Y., Tan, Y., Zhang, J., & Yu, H. (2021) · IEEE Access · doi:10.1109/access.2021.3110242 · Cited by 97
AIoT for sustainable manufacturing: Overview, challenges, and opportunities
Matin, A., Islam, M. R., Wang, X., Huo, H., & Xu, G. (2023) · Internet of Things · doi:10.1016/j.iot.2023.100901 · Cited by 109
Lu, S., Wang, Y., Kong, M., Wang, W., Tan, W., & Song, Y. (2024) · Engineering Applications of Artificial Intelligence · doi:10.1016/j.engappai.2024.108487 · Cited by 95
Distributed Real-Time Scheduling in Cloud Manufacturing by Deep Reinforcement Learning
Zhang, L., Yang, C., Yan, Y., & Hu, Y. (2022) · IEEE Transactions on Industrial Informatics · doi:10.1109/tii.2022.3178410 · Cited by 92
Kuhnle, A., Schäfer, L., Stricker, N., & Lanza, G. (2019) · Procedia CIRP · doi:10.1016/j.procir.2019.03.041 · Cited by 91
Lang, S., Behrendt, F., Lanzerath, N., Reggelin, T., & Müller, M. (2020) · Winter Simulation Conference · doi:10.1109/wsc48552.2020.9383997 · Cited by 83
Reinforcement learning for robotic flow shop scheduling with processing time variations
Lee, J.-H., & Kim, H.-J. (2021) · International Journal of Production Research · doi:10.1080/00207543.2021.1887533 · Cited by 81
Aremu, O. O., Hyland-Wood, D., & McAree, P. R. (2019) · Reliability Engineering & System Safety · doi:10.1016/j.ress.2019.106706 · Cited by 89
Chien, C., & Lan, Y.-B. (2021) · Computers & Industrial Engineering · doi:10.1016/j.cie.2021.107782 · Cited by 79
Zhang, L., Yang, C., Yan, Y., Cai, Z., & Hu, Y. (2024) · Journal of Manufacturing Systems · doi:10.1016/j.jmsy.2023.12.008 · Cited by 85
An improved MOEA/D for low-carbon many-objective flexible job shop scheduling problem
Wang, Z., He, M., Wu, J., Chen, H., & Cao, Y. (2024) · Computers & Industrial Engineering · doi:10.1016/j.cie.2024.109926 · Cited by 70
Hu, H., Jia, X., Liu, K., & Sun, B. (2021) · IEEE Transactions on Industrial Informatics · doi:10.1109/tii.2021.3059676 · Cited by 73
Reinforcement Learning With Composite Rewards for Production Scheduling in a Smart Factory
Zhou, T., Tang, D., Zhu, H., & Wang, L. (2020) · IEEE Access · doi:10.1109/access.2020.3046784 · Cited by 76
Skordilis, E., & Moghaddass, R. (2020) · Computers & Industrial Engineering · doi:10.1016/j.cie.2020.106600 · Cited by 71
A Survey on Scheduling Techniques in Computing and Network Convergence
Tang, S., Yu, Y., Wang, H., Wang, G., Chen, W., Xu, Z., Guo, S., & Gao, W. (2023) · IEEE Communications Surveys & Tutorials · doi:10.1109/comst.2023.3329027 · Cited by 77
Wang, Z., Liu, C., & Gombolay, M. (2021) · Autonomous Robots · doi:10.1007/s10514-021-09997-2 · Cited by 69
Top ten intelligent algorithms towards smart manufacturing
Zhang, M., Tao, F., Zuo, Y., Xiang, F., Wang, L., & Nee, A. Y. C. (2023) · Journal of Manufacturing Systems · doi:10.1016/j.jmsy.2023.09.006 · Cited by 66
Gallo, M. D., Ciarapica, F. E., Mazzuto, G., & Bevilacqua, M. (2023) · Electronics · doi:10.3390/electronics12234732 · Cited by 63
A relative entropy based feature selection framework for asset data in predictive maintenance
Aremu, O. O., Cody, R., Hyland-Wood, D., & McAree, P. R. (2020) · Computers & Industrial Engineering · doi:10.1016/j.cie.2020.106536 · Cited by 62
Ding, J., Chen, M., Wang, T., Zhou, J., Fu, X., & Li, K. (2023) · ACM Computing Surveys · doi:10.1145/3590163 · Cited by 58
Yang, S., Xu, Z., & Wang, J. (2021) · Sensors · doi:10.3390/s21031019 · Cited by 53
Bao, H., Pan, Q.-K., Ruíz, R., & Gao, L. (2023) · Swarm and Evolutionary Computation · doi:10.1016/j.swevo.2023.101399 · Cited by 51
Deep reinforcement learning for dynamic scheduling of energy-efficient automated guided vehicles
Zhang, L., Yan, Y., & Hu, Y. (2023) · Journal of Intelligent Manufacturing · doi:10.1007/s10845-023-02208-y · Cited by 50
Seo, G., Yoon, S., Kim, M., Mun, C., & Hwang, E. (2021) · IEEE Access · doi:10.1109/access.2021.3094466 · Cited by 47
Chen, W., Zhang, Z., Tang, D., Liu, C., Gui, Y., Nie, Q., & Zhao, Z. M. (2024) · Computers & Industrial Engineering · doi:10.1016/j.cie.2024.110633 · Cited by 46
Zheng, X., Liang, C., Wang, Y., Shi, J., & Lim, G. J. (2022) · Mathematics · doi:10.3390/math10234575 · Cited by 42
Chen, X., Li, Y., Wang, K., Wang, L., Liu, J., Wang, J., & Wang, X. V. (2024) · Journal of Manufacturing Systems · doi:10.1016/j.jmsy.2024.07.011 · Cited by 41
Modular production control using deep reinforcement learning: proximal policy optimization
Mayer, S., Classen, T., & Endisch, C. (2021) · Journal of Intelligent Manufacturing · doi:10.1007/s10845-021-01778-z · Cited by 45
The Applicability of Reinforcement Learning Methods in the Development of Industry 4.0 Applications
Kegyes, T., Süle, Z., & Abonyi, J. (2021) · Complexity · doi:10.1155/2021/7179374 · Cited by 40
Paeng, B., Park, I.-B., & Park, J. (2021) · IEEE Access · doi:10.1109/access.2021.3097254 · Cited by 40
Lang, S., Reggelin, T., Schmidt, J., Müller, M., & Nahhas, A. (2021) · Expert Systems with Applications · doi:10.1016/j.eswa.2021.114666 · Cited by 37
Zhou, T., Zhu, H., Tang, D., Liu, C., Cai, Q., Shi, W., & Gui, Y. (2022) · Advances in Mechanical Engineering · doi:10.1177/16878132221086120 · Cited by 43
Fuertes, G., Zamorano, J., Alfaro, M. D., Vargas, M., Sabattin, J., Durán, C., Ternero, R., & Rivera, R. (2022) · Sustainability · doi:10.3390/su141811118 · Cited by 38
Smart Manufacturing Scheduling Approaches—Systematic Review and Future Directions
Alemão, D., Rocha, A. D., & Barata, J. (2021) · Applied Sciences · doi:10.3390/app11052186 · Cited by 34
Deep Multilayer Perceptron Neural Network for the Prediction of Iranian Dam Project Delay Risks
Shirazi, D. H., & Toosi, H. (2023) · Journal of Construction Engineering and Management · doi:10.1061/jcemd4.coeng-12367 · Cited by 37
An improved Q-learning based rescheduling method for flexible job-shops with machine failures
Zhao, M., Li, X., Gao, L., Wang, L., & Xiao, M. (2019) · IEEE International Conference on Automation Science and Engineering (CASE) · doi:10.1109/coase.2019.8843100 · Cited by 33
Liu, J., Qiao, F., Zou, M., Zinn, J., Ma, Y., & Vogel‐Heuser, B. (2022) · Complex & Intelligent Systems · doi:10.1007/s40747-022-00844-0 · Cited by 39
Machine learning in smart production logistics: a review of technological capabilities
Flores-García, E., Kwak, D. H., Jeong, Y., & Wiktorsson, M. (2024) · International Journal of Production Research · doi:10.1080/00207543.2024.2381145 · Cited by 40
Dynamic scheduling for flexible job shop based on MachineRank algorithm and reinforcement learning
Ren, F., & Liu, H. (2024) · Scientific Reports · doi:10.1038/s41598-024-79593-8 · Cited by 31
Iqbal, N., Khan, A. N., Imran, I., Rizwan, A., Qayyum, F., Malik, S., Ahmad, R., & Kim, D. (2022) · Journal of Manufacturing Systems · doi:10.1016/j.jmsy.2022.05.015 · Cited by 31
Annear, L. M., Akhavan‐Tabatabaei, R., & Schmid, V. (2022) · European Journal of Operational Research · doi:10.1016/j.ejor.2022.08.049 · Cited by 29
Aron, C., Sgarbossa, F., Ballot, É., & Ivanov, D. (2023) · Journal of Intelligent Manufacturing · doi:10.1007/s10845-023-02262-6 · Cited by 29
Heger, J., & Voss, T. (2021) · International Journal of Production Research · doi:10.1080/00207543.2021.1943762 · Cited by 29
Zhang, L., Yan, Y., Hu, Y., & Ren, W. (2022) · IFAC-PapersOnLine · doi:10.1016/j.ifacol.2022.09.413 · Cited by 29
Nguyen, H. D., & Tran, K. P. (2023) · Springer series in reliability engineering · doi:10.1007/978-3-031-30510-8_2 · Cited by 35
Designing an adaptive and deep learning based control framework for modular production systems
Panzer, M., & Gronau, N. (2023) · Journal of Intelligent Manufacturing · doi:10.1007/s10845-023-02249-3 · Cited by 29
Chang, X., Jia, X., Fu, S., Hu, H., & Liu, K. (2022) · Proceedings of the Institution of Mechanical Engineers Part B Journal of Engineering Manufacture · doi:10.1177/09544054221121934 · Cited by 29
A Reinforcement Learning Approach to Dynamic Scheduling in a Product-Mix Flexibility Environment
Shiue, Y.-R., Lee, K.-C., & Su, C. (2020) · IEEE Access · doi:10.1109/access.2020.3000781 · Cited by 28
Self-citationChen, W., Gong, X., Rahman, H. F., Liu, H., & Qi, E. (2021) · Omega · doi:10.1016/j.omega.2021.102499 · Cited by 27
Bunian, S., Al-Ebrahim, M. A., State Audit Bureau (SAB), S. 7., & Nour, A. A. (2024) · Engineered Science · doi:10.30919/es1088 · Cited by 26
Malik, S., & Kim, D. (2020) · IEEE Access · doi:10.1109/access.2020.3046097 · Cited by 24
Development of a Smart Manufacturing Execution System Architecture for SMEs: A Czech Case Study
Pfeifer, M. R. (2021) · Sustainability · doi:10.3390/su131810181 · Cited by 26
A Resource Recommendation Model for Heterogeneous Workloads in Fog-Based Smart Factory Environment
Chen, L., Lu, Z., Xiao, A. Y., Duan, Q., Wu, J., & Hung, P. C. K. (2022) · IEEE Transactions on Automation Science and Engineering · doi:10.1109/tase.2022.3141590 · Cited by 24
Real-Time Production and Logistics Self-Adaption Scheduling Based on Information Entropy Theory
Yang, W., Li, W., Cao, Y., Luo, Y., & He, L. (2020) · Sensors · doi:10.3390/s20164507 · Cited by 23
Lang, S., Kuetgens, M., Reichardt, P., & Reggelin, T. (2021) · IFAC-PapersOnLine · doi:10.1016/j.ifacol.2021.08.093 · Cited by 23
A phased intelligent algorithm for dynamic seru production considering seru formation changes
Fu, G., Cheng, H., Yu, Y., Sun, W., & Kaku, I. (2022) · Applied Intelligence · doi:10.1007/s10489-022-03579-0 · Cited by 23
Evolutionary Trainer-Based Deep Q -Network for Dynamic Flexible Job-Shop Scheduling
Liu, Y., Zhang, F., Sun, Y., & Zhang, M. (2024) · IEEE Transactions on Evolutionary Computation · doi:10.1109/tevc.2024.3367181 · Cited by 23
Kim, H., Quan, Y., Jung, G., Lee, K.-W., Jeong, S., Yun, W.-J., Park, S., & Ahn, S. (2023) · International Journal of Precision Engineering and Manufacturing-Smart Technology · doi:10.57062/ijpem-st.2022.0073 · Cited by 24
Self-citationFang, W., Zhang, H., Qian, W., Guo, Y., Li, S., Liu, Z., Liu, C., & Hong, D. (2023) · Journal of Computing and Information Science in Engineering · doi:10.1115/1.4062349 · Cited by 22
Heger, J., & Voss, T. T. (2020) · Winter Simulation Conference · doi:10.1109/wsc48552.2020.9383903 · Cited by 20
Optimal scheduling in cloud healthcare system using Q-learning algorithm
Li, Y., Wang, H., Wang, N., & Zhang, T. (2022) · Complex & Intelligent Systems · doi:10.1007/s40747-022-00776-9 · Cited by 19
Sagar, K. V., & Jerald, J. (2022) · Materials Today Proceedings · doi:10.1016/j.matpr.2022.04.522 · Cited by 19
Gu, W., Liu, S., Zhang, Z., & Li, Y. (2022) · Journal of Manufacturing Systems · doi:10.1016/j.jmsy.2022.11.006 · Cited by 19
Learning-augmented heuristics for scheduling parallel serial-batch processing machines
Uzunoglu, A., Gahm, C., Wahl, S., & Tuma, A. (2022) · Computers & Operations Research · doi:10.1016/j.cor.2022.106122 · Cited by 19
Wu, R., Zheng, J., Li, X., Tang, H., Wang, X. V., & Li, Y. (2025) · Expert Systems with Applications · doi:10.1016/j.eswa.2025.128280 · Cited by 18
A hybrid fuzzy-neural-based dynamic scheduling method for part feeding of mixed-model assembly lines
Zhou, B., & Zhao, Z. (2021) · Computers & Industrial Engineering · doi:10.1016/j.cie.2021.107794 · Cited by 18
Future-Proof Production Scheduling and Control
Urgo, M., Lanza, G., Vrabič, R., & Gyulai, D. (2025) · CIRP Annals · doi:10.1016/j.cirp.2025.04.095 · Cited by 17
Impact of Industry 4.0 on Corporate Financial Performance: A Moderated Mediation Model
Chen, H. L. (2021) · Sustainability · doi:10.3390/su13116069 · Cited by 19
Metadata
- Authors
- Shiue, Y.-R., Lee, K.-C., & Su, C.-T.
- Affiliations
- Fujian Business University (CN)
- National Tsing Hua University (TW)
- Corresponding author
- Su, Chao-Ton
- Venue
- Computers & Industrial Engineering
- Publisher
- Elsevier BV
- Published
- 2018-11
- Volume
- 125
- Pages
- 604-614
- ISSN
- 0360-8352 (ISSN-L)
- OpenAlex
- W2793262237
- Cited by
- 225
- References
- 44
- Citations by year
- 2026: 13 · 2025: 27 · 2024: 29 · 2023: 38 · 2022: 37 · 2021: 40 · 2020: 32 · 2019: 9
- FWCI
- 16.73
- Type
- journal article
- Language
- en
- Open access
- closed
- Locations
- Computers & Industrial Engineering (publishedVersion)
- Topics
- Physical Sciences › Engineering › Industrial and Manufacturing Engineering › Scheduling and Optimization Algorithms
- Physical Sciences › Engineering › Industrial and Manufacturing Engineering › Advanced Manufacturing and Logistics Optimization
- Physical Sciences › Computer Science › Hardware and Architecture › Real-Time Systems Scheduling
- Keywords
- real-time scheduling, smart factory, reinforcement learning, Q-learning, shop floor control, knowledge base updating, offline learning, production performance, manufacturing systems
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review