The DOI matches its Crossref record; the references it cites are not checked yet.
Improving warehouse responsiveness by job priority management: A European distribution centre field study
Open accessAbstract
Abstract Warehouses employ order cut-off times to ensure sufficient time for fulfilment. To satisfy increasing consumer’s expectations for higher order responsiveness, warehouses competitively postpone these cut-off times upholding the same pick-up time. This paper, therefore, aims to schedule jobs more efficiently to meet compressed response times. Secondly, this paper provides a data-driven decision-making methodology to guarantee the right implementation by the practitioners. Priority-based job scheduling using flow-shop models has been used mainly for manufacturing systems but can be ingeniously applied for warehouse job scheduling to accommodate tighter cut-off times. To assist warehouse managers in decision making for the practical value of these models, this study presents a computer simulation approach to decide which priority rule performs best under which circumstances. The application of stochastic simulation models for uncertain real-life operational environments contributes to the previous literature on deterministic models for theoretical environments. The performance of each rule is evaluated in terms of a joint cost criterion that integrates the objectives of low earliness, low tardiness, low labour idleness, and low work-in-process stocks. The simulation outcomes provide several findings about the strategic views for improving responsiveness. In particular, the critical ratio rule using the real-time queue status of jobs has the fastest flow-time and performs best for warehouse scenarios with expensive products and high labour costs. The case study limits the coverage of the findings, but it still closes the existent gap regarding data-driven decision making methodology for practitioners of supply chains.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
The citation lists are queued
They are fetched later and appear here then.
References 55 · Cited by 32
Research works printed but not linked: 50
- Baker, 1990, Sequencing with earliness and tardiness penalties: A review, Operations Research, 38, 22, 10.1287/opre.38.1.22 · doi:10.1287/opre.38.1.22
- Berry, 1975, Critical ratio scheduling: An experimental analysis, Management Science, 22, 192, 10.1287/mnsc.22.2.192 · doi:10.1287/mnsc.22.2.192
- Burke, 1956, The output of a queuing system, Operations Research, 4, 699, 10.1287/opre.4.6.699 · DOI · Paper page
- Cakici, 2012, Multi-objective analysis of an integrated supply chain scheduling problem, International Journal of Production Research, 50, 2624, 10.1080/00207543.2011.578162 · doi:10.1080/00207543.2011.578162
- Chen, 2010, A flexible evaluative framework for order picking systems, Production and Operations Management, 19, 70, 10.1111/j.1937-5956.2009.01047.x · DOI
- Cui, 2018, A proactive approach to solve integrated production scheduling and maintenance planning problem in flow shops, Computers & Industrial Engineering, 115, 342, 10.1016/j.cie.2017.11.020 · DOI
- De Koster, 2008, Benchmarking and monitoring international warehouse operations in Europe, Production and Operations Management, 17, 175, 10.3401/poms.1080.0013 · doi:10.3401/poms.1080.0013
- De Koster, 2007, Design and control of warehouse order picking: A literature review, European Journal of Operational Research, 182, 481, 10.1016/j.ejor.2006.07.009 · DOI · Paper page
- De Koster, 2012, Determining the number of zones in a pick-and-sort order picking system, International Journal of Production Research, 50, 757, 10.1080/00207543.2010.543941 · doi:10.1080/00207543.2010.543941
- De Leeuw, 2015, Warehouse manpower planning strategies in times of financial crisis: Evidence from logistics service providers and retailers in the Netherlands, Production Planning & Control, 26, 328, 10.1080/09537287.2014.904531 · DOI
- Deng, 2012, A hybrid discrete differential evolution algorithm for the no-idle permutation flow shop scheduling problem with makespan criterion, Computers & Operations Research, 39, 2152, 10.1016/j.cor.2011.10.024 · DOI
- Doerr, 2013, A performance metric and goal-setting procedure for deadline-oriented processes, Production and Operations Management, 22, 726, 10.1111/j.1937-5956.2012.01375.x · DOI
- Elsayed, 1993, Sequencing and batching procedures for minimizing earliness and tardiness penalty of order retrievals, The International Journal of Production Research, 31, 727, 10.1080/00207549308956753 · DOI
- Freiheit, 2017, The effect of work content imbalance and its interaction with scheduling method on sequential flow line performance, International Journal of Production Research, 55, 2791, 10.1080/00207543.2016.1194536 · doi:10.1080/00207543.2016.1194536
- Giannakis, 2016, A multi-agent based system with big data processing for enhanced supply chain agility, Journal of Enterprise Information Management, 29, 706, 10.1108/JEIM-06-2015-0050 · DOI · Paper page
- Gong, 2011, A review on stochastic models and analysis of warehouse operations, Logistics Research, 3, 191, 10.1007/s12159-011-0057-6 · DOI
- Graves, 1977, Storage-retrieval interleaving in automatic warehousing systems, Management Science, 23, 935, 10.1287/mnsc.23.9.935 · DOI
- Györgyi, 2018, Minimizing the maximum lateness on a single machine with raw material constraints by branch-and-cut, Computers & Industrial Engineering, 115, 220, 10.1016/j.cie.2017.11.016 · doi:10.1016/j.cie.2017.11.016
- Hackman, 2001, Benchmarking warehousing and distribution operations: An input-output approach, Journal of Productivity Analysis, 16, 79, 10.1023/A:1011155320454 · doi:10.1023/a:1011155320454
- Hall, 1993, Distance approximations for routing manual pickers in a warehouse, IIE Transactions, 25, 76, 10.1080/07408179308964306 · DOI
- Huang, 2006, The workload balancing problem at aircargo terminals, OR Spectrum, 28, 705, 10.1007/s00291-006-0035-6 · doi:10.1007/s00291-006-0035-6
- Jarvis, 1991, Optimal product layout in an order picking warehouse, IIE Transactions, 23, 93, 10.1080/07408179108963844 · DOI
- Johnson, 1954, Optimal two-and three-stage production schedules with setup times included, Naval Research Logistics, 1, 61, 10.1002/nav.3800010110 · DOI · Paper page
- Kanet, 1982, Priority dispatching with operation due dates in a job shop, Journal of Operations Management, 2, 167, 10.1016/0272-6963(82)90004-3 · doi:10.1016/0272-6963(82)90004-3
- Kheirandish, 2015, An artificial bee colony algorithm for a two-stage hybrid flowshop scheduling problem with multilevel product structures and requirement operations, International Journal of Computer Integrated Manufacturing, 28, 437, 10.1080/0951192X.2014.880805 · doi:10.1080/0951192x.2014.880805
- Kiran, 1984, Simulation studies in job shop sheduling—I a survey, Computers & Industrial Engineering, 8, 87, 10.1016/0360-8352(84)90001-9 · doi:10.1016/0360-8352(84)90001-9
- Krafcik, 1988, Triumph of the lean production system, Sloan Management Review, 30, 41
- Kritchanchai, 1999, Responsiveness of the order fulfilment process, International Journal of Operations & Production Management, 19, 812, 10.1108/01443579910274419 · doi:10.1108/01443579910274419
- Lee, 1997, Job shop scheduling with a genetic algorithm and machine learning, International Journal of Production Research, 35, 1171, 10.1080/002075497195605 · doi:10.1080/002075497195605
- Leung, 2018, A B2C e-commerce intelligent system for re-engineering the e-order fulfilment process, Expert Systems with Applications, 91, 386, 10.1016/j.eswa.2017.09.026 · DOI
- Little, 1961, A proof for the queuing formula: L=λW, Operations Research, 9, 383, 10.1287/opre.9.3.383 · DOI · Paper page
- Nesello, 2018, Mathematical models and decomposition algorithms for makespan minimization in plastic rolls production, Journal of the Operational Research Society, 69, 326, 10.1057/s41274-017-0221-8 · DOI
- Pagh, 1998, Supply chain postponement and speculation strategies: How to choose the right strategy, Journal of Business Logistics, 19, 13
- Petersen, 1997, An evaluation of order picking routeing policies, International Journal of Operations & Production Management, 17, 1098, 10.1108/01443579710177860 · DOI
- Petersen, 2000, An evaluation of order picking policies for mail order companies, Production and Operations Management, 9, 319, 10.1111/j.1937-5956.2000.tb00461.x · DOI
- Petersen, 2004, Improving order-picking performance through the implementation of class-based storage, International Journal of Physical Distribution & Logistics Management, 34, 534, 10.1108/09600030410552230 · DOI
- Putnam, 1971, Updating critical ratio and slack time priority scheduling rules, Production and Inventory Management, 12, 51
- Ramaa, 2012, Impact of warehouse management system in a supply chain, International Journal of Computer Applications, 54
- Ramasesh, 1990, Dynamic job shop scheduling: A survey of simulation research, Omega, 18, 43, 10.1016/0305-0483(90)90017-4 · doi:10.1016/0305-0483(90)90017-4
- Roodbergen, 2001, Routing methods for warehouses with multiple cross aisles, International Journal of Production Research, 39, 1865, 10.1080/00207540110028128 · DOI
- Shahrabi, 2017, A reinforcement learning approach to parameter estimation in dynamic job shop scheduling, Computers & Industrial Engineering, 110, 75, 10.1016/j.cie.2017.05.026 · DOI · Paper page
- Smith, 1956, Various optimizers for single-stage production, Naval Research Logistics, 3, 59, 10.1002/nav.3800030106 · DOI · Paper page
- Treleven, 1985, An investigation of labor assignment rules in a dual-constrained job shop, Journal of Operations Management, 6, 51, 10.1016/0272-6963(85)90035-X · DOI
- Van den Berg, 1999, A literature survey on planning and control of warehousing systems, IIE Transactions, 31, 751, 10.1080/07408179908969874 · DOI
- Van Nieuwenhuyse, 2009, Evaluating order throughput time in 2-block warehouses with time window batching, International Journal of Production Economics, 121, 654, 10.1016/j.ijpe.2009.01.013 · doi:10.1016/j.ijpe.2009.01.013
- Vincent, 2011, Multicriteria models for just-in-time scheduling, International Journal of Production Research, 49, 3191, 10.1080/00207541003733783 · DOI
- Wang, 2014, Two-stage hybrid flow shop scheduling with preventive maintenance using multi-objective tabu search method, International Journal of Production Research, 52, 1495, 10.1080/00207543.2013.847983 · DOI
- Welch, 1947, The generalization of ‘Student'’s problem when several different population variances are involved, Biometrika, 34, 28, 10.2307/2332510 · DOI · Paper page
- Won, 2005, Joint order batching and order picking in warehouse operations, International Journal of Production Research, 43, 1427, 10.1080/00207540410001733896 · DOI
- Yazdani, 2017, Optimizing the sum of maximum earliness and tardiness of the job shop scheduling problem, Computers & Industrial Engineering, 107, 12, 10.1016/j.cie.2017.02.019 · doi:10.1016/j.cie.2017.02.019
Metadata
- Authors
- Kim, T. Y.
- Affiliations
- Samsung Electronics (South Korea) (KR)
- Corresponding author
- Kim, Thai Young
- ORCID
- Kim, Thai Young
- Venue
- Computers & Industrial Engineering
- Publisher
- Elsevier BV
- Published
- 2020-01
- Volume
- 139
- Pages
- 105564
- ISSN
- 0360-8352 (ISSN-L)
- OpenAlex
- W2789756536
- Cited by
- 32
- References
- 55
- Citations by year
- 2026: 2 · 2025: 7 · 2024: 9 · 2023: 3 · 2022: 3 · 2021: 4 · 2020: 1
- FWCI
- 1.35
- Type
- journal article
- Language
- en
- Open access
- green
- pure.eur.nl
- Licence
- other-oa
- www.elsevier.com/tdm/userlicense/1.0/ (tdm)
- www.elsevier.com/legal/tdmrep-license (tdm)
- Locations
- Computers & Industrial Engineering (publishedVersion)
- Middlesex University Research Repository (Middlesex University Of London) (acceptedVersion)
- RePEc: Research Papers in Economics (submittedVersion)
- Econometric Institute Research Papers (submittedVersion)
- EUR Research Repository (Erasmus University Rotterdam) (submittedVersion, other-oa)
- RePub (Erasmus University Rotterdam) (submittedVersion, other-oa)
- Topics
- Physical Sciences › Engineering › Industrial and Manufacturing Engineering › Scheduling and Optimization Algorithms
- Physical Sciences › Engineering › Industrial and Manufacturing Engineering › Advanced Manufacturing and Logistics Optimization
- Social Sciences › Decision Sciences › Management Science and Operations Research › Healthcare Operations and Scheduling Optimization
- Keywords
- dispatching rules, flow shop scheduling, stochastic simulation, earliness and tardiness, work-in-process inventory, distribution centers, data-driven decision making
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Improving warehouse responsiveness by job priority management: A European distribution centre field study. https://app.cochat.ai/papers/10.1016/j.cie.2018.12.011
- The paper
- Kim, T. Y. (2020). Improving warehouse responsiveness by job priority management: A European distribution centre field study. Computers & Industrial Engineering. https://doi.org/10.1016/j.cie.2018.12.011
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.