The DOI matches its Crossref record; 16 of the 16 references it cites were found in a registry or an index.
Process industry supply chains: Advances and challenges
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Issues in Supply Chain Management
Lambert, D. M., & Cooper, M. C. (2000) · Industrial Marketing Management · doi:10.1016/s0019-8501(99)00113-3 · Cited by 3,099
Industrial Dynamics: A Major Breakthrough for Decision Makers
Forrester, J. W. (2012) · The Roots of Logistics · doi:10.1007/978-3-642-27922-5_13 · Cited by 2,058
Supply chain design and analysis:
Beamon, B. M. (1998) · International Journal of Production Economics · doi:10.1016/s0925-5273(98)00079-6 · Cited by 1,841
Multicommodity Distribution System Design by Benders Decomposition * † ‡
Geoffrion, A. M., & Graves§, G. W. (2010) · International Series in Operations Research & Management Science · doi:10.1007/978-1-4419-6810-4_4 · Cited by 978
Multicommodity Distribution System Design by Benders Decomposition
Geoffrion, A. M., & Graves, G. W. (1974) · Management Science · doi:10.1287/mnsc.20.5.822 · Cited by 906
Vidal, C. J., & Goetschalckx, M. (1997) · European Journal of Operational Research · doi:10.1016/s0377-2217(97)80080-x · Cited by 759
A multi-objective approach to simultaneous strategic and operational planning in supply chain design
Sabri, E. H., & Beamon, B. M. (2000) · Omega · doi:10.1016/s0305-0483(99)00080-8 · Cited by 592
Planning and scheduling in the process industry
Kallrath, J. (2002) · OR Spectrum · doi:10.1007/s00291-002-0101-7 · Cited by 367
Agent-based supply chain management—1: framework
Julka, N., Srinivasan, R., & Karimi, I. (2002) · Computers & Chemical Engineering · doi:10.1016/s0098-1354(02)00150-3 · Cited by 228
Blending OR/MS, Judgment, and GIS: Restructuring P&G's Supply Chain
Camm, J. D., Chorman, T. E., Dill, F. A., Evans, J. R., Sweeney, D. J., & Wegryn, G. W. (1997) · Interfaces · doi:10.1287/inte.27.1.128 · Cited by 212
Gupta, A., Maranas, C. D., & McDonald, C. M. (2000) · Computers & Chemical Engineering · doi:10.1016/s0098-1354(00)00617-7 · Cited by 163
Gjerdrum, J., Shah, N., & Papageorgiou, L. G. (2001) · Production Planning & Control · doi:10.1080/09537280150204013 · Cited by 163
Self-citationA planning model for refinery diesel production
Moro, L. F. L., Zanin, A. C., & Pinto, J. M. (1998) · Computers & Chemical Engineering · doi:10.1016/s0098-1354(98)00209-9 · Cited by 114
Dynamic Modeling and Decentralized Control of Supply Chains
Perea-López, E., Grossmann, I. E., Ydstie, B. E., et al. (2001) · Industrial & Engineering Chemistry Research · doi:10.1021/ie000573k · Cited by 92
An integrated system solution for supply chain optimization in the chemical process industry
Berning, G., Brandenburg, M., Gürsoy, K., Mehta, V. L., & Tölle, F.-J. (2002) · OR Spectrum · doi:10.1007/s00291-002-0104-4 · Cited by 53
Integrating Budgeting Models into Scheduling and Planning Models for the Chemical Batch Industry
Romero, J., Badell, M., Bagajewicz, M. J., & Puigjaner, L. (2003) · Industrial & Engineering Chemistry Research · doi:10.1021/ie030312l · Cited by 44
Cited by
You, F., Tao, L., Graziano, D. J., & Snyder, S. W. (2012) · AIChE Journal · doi:10.1002/aic.12637 · Cited by 669
Sharifzadeh, M., Sadeqzadeh, M., Guo, M., Borhani, T. N., Murthy Konda, N. V. S. N., Garcia, M. C., Wang, L., Hallett, J., & Shah, N. (2019) · Progress in Energy and Combustion Science · doi:10.1016/j.pecs.2018.10.006 · Cited by 473
Self-citationTako, A. A., & Robinson, S. (2012) · Decision Support Systems · doi:10.1016/j.dss.2011.11.015 · Cited by 420
You, F., & Wang, B. (2011) · Industrial & Engineering Chemistry Research · doi:10.1021/ie200850t · Cited by 352
Supply chain design and optimization: Challenges and opportunities
Garcia, D. J., & You, F. (2015) · Computers & Chemical Engineering · doi:10.1016/j.compchemeng.2015.03.015 · Cited by 336
Metadata
- Authors
- Shah, N.
- Venue
- Computers & Chemical Engineering
- Publisher
- Elsevier BV
- Published
- 2005-05
- Volume
- 29
- Issue
- 6
- Pages
- 1225-1235
- ISSN
- 0098-1354 (ISSN-L)
- OpenAlex
- W2046651766
- Cited by
- 364
- References
- 16
- FWCI
- 41.61
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.