The DOI matches its Crossref record; 61 of the 61 references it cites were found in a registry or an index.
An environmental optimization model to configure a hybrid forward and reverse supply chain network under uncertainty
Abstract
The configuration of facility locations is a strategic decision which is impossible to be changed in a short-term. There are several parameters incorporating to make such decision that fluctuate in different situations. Those unpredictable changes cause some risks and complexities for the businesses in long-run. The objective of this research is to design a multi-echelon lead acid battery closed-loop supply chain (CLSC) network under uncertainty. To this aim, a fully fuzzy programming (FFP) method and stochastic programming are integrated (FFSP) to address various scenarios to maximize network's profit. Furthermore, second objective is introduced to maximize the environmental compliance of suppliers, plants, and battery recovery centers. Then, distance technique is utilized for solving the fuzzy stochastic multi-objective problem. The application of the proposed model is illustrated in a network in Winnipeg, Canada.
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“It has been modeled to evaluate environmental concerns [76,77].”
From Lithium Supply Chain Optimization: A Global Analysis of Critical Minerals for Batteries (2024) · cites this paper as [76]
Citations
Cites
Fuzzy Sets and Fuzzy Logic: Theory and Applications
Klir, G. J., & Yuan, B. (1995) · Medical Entomology and Zoology · Cited by 6,240
Fuzzy sets and fuzzy logic: theory and applications
(1996) · Choice Reviews Online · doi:10.5860/choice.33-2786 · Cited by 1,871
Introduction to fuzzy arithmetic : theory and applications
Kaufmann, A., & Gupta, M. M. (1991) · Medical Entomology and Zoology · Cited by 1,813
Facility location under uncertainty: a review
Snyder, L. V. (2006) · IIE Transactions · doi:10.1080/07408170500216480 · Cited by 1,019
A comparison between Fuzzy AHP and Fuzzy TOPSIS methods to supplier selection
Lima Junior, F. R., Osiro, L., & Carpinetti, L. C. R. (2014) · Applied Soft Computing · doi:10.1016/j.asoc.2014.03.014 · Cited by 820
Banaeian, N., Mobli, H., Fahimnia, B., Nielsen, I. E., & Omid, M. (2016) · Computers & Operations Research · doi:10.1016/j.cor.2016.02.015 · Cited by 513
Amin, S. H., & Zhang, G. (2013) · Applied Mathematical Modelling · doi:10.1016/j.apm.2012.09.039 · Cited by 432
Self-citationEnvironmental supply chain network design using multi-objective fuzzy mathematical programming
Pishvaee, M. S., & Razmi, J. (2012) · Applied Mathematical Modelling · doi:10.1016/j.apm.2011.10.007 · Cited by 395
Zhalechian, M., Tavakkoli-Moghaddam, R. R., Zahiri, B., & Mohammadi, M. (2016) · Transportation Research Part E Logistics and Transportation Review · doi:10.1016/j.tre.2016.02.011 · Cited by 374
Al-e-Hashem, S. M. J. M., Malekly, H., & Aryanezhad, M. B. (2011) · International Journal of Production Economics · doi:10.1016/j.ijpe.2011.01.027 · Cited by 373
Vendor selection in outsourcing
Wadhwa, V., & Ravindran, A. R. (2006) · Computers & Operations Research · doi:10.1016/j.cor.2006.01.009 · Cited by 360
A stochastic approach to a case study for product recovery network design
Listeş, O., & Dekker, R. (2005) · European Journal of Operational Research · doi:10.1016/j.ejor.2001.12.001 · Cited by 354
Robustness and Optimality as Criteria for Strategic Decisions
Rosenhead, J., Elton, M., & Gupta, S. K. (1972) · Journal of the Operational Research Society · doi:10.1057/jors.1972.72 · Cited by 310
A simulation based optimization approach to supply chain management under demand uncertainty
Jung, J. Y., BLAU, G. E., Pekny, J. F., Reklaitis, G. V., & Eversdyk, D. (2004) · Computers & Chemical Engineering · doi:10.1016/j.compchemeng.2004.06.006 · Cited by 301
Keyvanshokooh, E., Ryan, S. M., & Kabir, E. (2016) · European Journal of Operational Research · doi:10.1016/j.ejor.2015.08.028 · Cited by 271
Fuzzy optimization for supply chain planning under supply, demand and process uncertainties
Peidro, D., Mula, J., Poler, R., et al. (2009) · Fuzzy Sets and Systems · doi:10.1016/j.fss.2009.02.021 · Cited by 263
Operational and environmental performance measures in a multi-product closed-loop supply chain
Paksoy, T., Bektaş, T., & Özceylan, E. (2011) · Transportation Research Part E: Logistics and Transportation Review · doi:10.1016/j.tre.2010.12.001 · Cited by 223
Multi-period design and planning of closed-loop supply chains with uncertain supply and demand
Zeballos, L. J., Méndez, C. A., Barbosa-Povoa, A. P., & Novais, A. Q. (2014) · Computers & Chemical Engineering · doi:10.1016/j.compchemeng.2014.02.027 · Cited by 191
Decision Making with Uncertainty Using Hesitant Fuzzy Sets
Faizi, S., Rashid, T., Sałabun, W., Zafar, S., & Wątróbski, J. (2018) · International Journal of Fuzzy Systems · doi:10.1007/s40815-017-0313-2 · Cited by 186
Ghaderi, H., Moini, A., & Pishvaee, M. S. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2017.12.218 · Cited by 184
Marufuzzaman, M., Eksioglu, S. D., & Huang, Y. (2014) · Computers & Operations Research · doi:10.1016/j.cor.2014.03.010 · Cited by 156
Effects of uncertainty on a tire closed-loop supply chain network
Amin, S. H., Zhang, G., & Akhtar, P. (2016) · Expert Systems with Applications · doi:10.1016/j.eswa.2016.12.024 · Cited by 153
Self-citationA new algorithm to solve fully fuzzy linear programming problems using the MOLP problem
Ezzati, R., Khorram, E., & Enayati, R. (2013) · Applied Mathematical Modelling · doi:10.1016/j.apm.2013.03.014 · Cited by 149
A facility location model for global closed-loop supply chain network design
Amin, S. H., & Baki, F. (2016) · Applied Mathematical Modelling · doi:10.1016/j.apm.2016.08.030 · Cited by 149
Self-citationTsao, Y., Thanh, V.-V., Lu, J., et al. (2017) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2017.10.272 · Cited by 147
Subulan, K., Taşan, A. S., & Baykasoğlu, A. (2014) · Applied Mathematical Modelling · doi:10.1016/j.apm.2014.11.004 · Cited by 146
Ramezanian, R., & Behboodi, Z. (2017) · Transportation Research Part E Logistics and Transportation Review · doi:10.1016/j.tre.2017.06.004 · Cited by 146
Solving a multiobjective possibilistic problem through compromise programming
Arenas‐Parra, M., Bilbao‐Terol, A., Pérez‐Gladish, B., et al. (2004) · European Journal of Operational Research · doi:10.1016/j.ejor.2003.11.028 · Cited by 136
A New Operation on Triangular Fuzzy Number for Solving Fuzzy Linear Programming Problem
Gani, A. N., & Assarudeen, S. N. M. (2012) · Cited by 135
Wei, G., Alsaadi, F. E., Hayat, T., et al. (2016) · International Journal of Fuzzy Systems · doi:10.1007/s40815-016-0177-x · Cited by 133
Vahdani, B., & Mohammadi, M. (2015) · International Journal of Production Economics · doi:10.1016/j.ijpe.2015.08.020 · Cited by 130
A multi-stage stochastic programming approach for blood supply chain planning
Zahiri, B., Torabi, S. A., Mohammadi, M., et al. (2018) · Computers & Industrial Engineering · doi:10.1016/j.cie.2018.05.041 · Cited by 127
Closed-loop supply chain network design under a fuzzy environment
Ramezani, M., Kimiagari, A. M., Karimi, B., et al. (2014) · Knowledge-Based Systems · doi:10.1016/j.knosys.2014.01.016 · Cited by 123
Jindal, A., & Sangwan, K. S. (2013) · International Journal of Production Research · doi:10.1080/00207543.2013.861948 · Cited by 123
Using fuzzy numbers in linear programming
Figueredo, J. M. C., & Verdegay, J. L. (1997) · IEEE Transactions on Systems Man and Cybernetics Part B (Cybernetics) · doi:10.1109/3477.650062 · Cited by 121
Ghomi‐Avili, M., Naeini, S. G. J., Tavakkoli-Moghaddam, R. R., et al. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.03.273 · Cited by 119
Redesign of a sustainable reverse supply chain under uncertainty: A case study
Cespón, M. F., Sarache, W. A., Piedra-Jiménez, F., & Castro, R. C. (2017) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2017.03.057 · Cited by 114
Entezaminia, A., Heydari, M., & Rahmani, D. (2016) · Journal of Manufacturing Systems · doi:10.1016/j.jmsy.2016.06.004 · Cited by 107
Modeling sustainable product lifecycle decision support systems
Hu, G., & Bidanda, B. (2009) · International Journal of Production Economics · doi:10.1016/j.ijpe.2009.06.011 · Cited by 98
Vahdani, B., Tavakkoli-Moghaddam, R. R., Jolai, F., et al. (2012) · Engineering Optimization · doi:10.1080/0305215x.2012.704029 · Cited by 94
Soleimani, H., Seyyed‐Esfahani, M., & Shirazi, M. A. (2013) · Annals of Operations Research · doi:10.1007/s10479-013-1435-z · Cited by 91
Tosarkani, B. M., & Amin, S. H. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.07.056 · Cited by 81
Self-citationDesign of a closed-loop supply chain (CLSC) model using an interactive fuzzy goal programming
Zarandi, M. H. F., Sisakht, A. H., & Davari, S. (2011) · The International Journal of Advanced Manufacturing Technology · doi:10.1007/s00170-011-3212-y · Cited by 80
Mohajeri, A., & Fallah, M. (2015) · Transportation Research Part D Transport and Environment · doi:10.1016/j.trd.2015.09.001 · Cited by 78
An approach to the display and analysis of multiobjective problems
Schilling, D. A., ReVelle, C., & Cohon, J. L. (1983) · Socio-Economic Planning Sciences · doi:10.1016/0038-0121(83)90008-3 · Cited by 78
Dai, Z., & Zheng, X. (2015) · Computers & Industrial Engineering · doi:10.1016/j.cie.2015.08.004 · Cited by 70
An agent-based approach for supply chain retrofitting under uncertainty
Mele, F. D., Guillén‐Gosálbez, G., Espuña, A., & Puigjaner, L. (2007) · Computers & Chemical Engineering · doi:10.1016/j.compchemeng.2006.12.013 · Cited by 69
Integrating financial risk measures into the design and planning of closed-loop supply chains
Cardoso, S. R., Barbosa‐Póvoa, A. P., & Relvas, S. (2015) · Computers & Chemical Engineering · doi:10.1016/j.compchemeng.2015.10.012 · Cited by 68
A quantile-based scenario analysis approach to biomass supply chain optimization under uncertainty
Zamar, D., Gopaluni, R. B., Sokhansanj, S., & Newlands, N. K. (2016) · Computers & Chemical Engineering · doi:10.1016/j.compchemeng.2016.11.015 · Cited by 52
Mirakhorli, A. (2013) · The International Journal of Advanced Manufacturing Technology · doi:10.1007/s00170-013-5264-7 · Cited by 51
Network configuration of a bottled water closed-loop supply chain with green supplier selection
Papen, P., & Amin, S. H. (2018) · Journal of remanufacturing · doi:10.1007/s13243-018-0061-y · Cited by 45
Self-citationFrancie, K. A., Jean-Pierre, K., Dejax, P. J., et al. (2015) · Journal of Manufacturing Systems · doi:10.1016/j.jmsy.2014.11.019 · Cited by 43
Fallahtafti, A., Sahraeian, R., Tavakkoli-Moghaddam, R. R., et al. (2012) · International Journal of Systems Science · doi:10.1080/00207721.2012.720296 · Cited by 42
A perspective on the reverse logistics of plastic pallets in Canada
Amin, S. H., Wu, H., & Karaphillis, G. (2018) · Journal of remanufacturing · doi:10.1007/s13243-018-0051-0 · Cited by 37
Self-citationTai, P. D., & Yenradee, P. (2017) · Computers & Industrial Engineering · doi:10.1016/j.cie.2017.04.012 · Cited by 36
Englberger, J., Herrmann, F., & Manitz, M. (2016) · International Journal of Production Research · doi:10.1080/00207543.2016.1162917 · Cited by 29
Managing demand uncertainty through fuzzy inference in supply chain planning
Jung, H., & Jeong, S. (2011) · International Journal of Production Research · doi:10.1080/00207543.2011.631606 · Cited by 26
A fuzzy approach for container positioning considering sustainable profit optimization
von Westarp, A. G., & Schinas, O. D. (2016) · Transportation Research Part E Logistics and Transportation Review · doi:10.1016/j.tre.2016.04.014 · Cited by 23
Multiperiod and stochastic formulations for a closed loop supply chain with incentives
Litvinchev, I. S., Solis, Y. R., Özdemir, D., et al. (2014) · Journal of Computer and Systems Sciences International · doi:10.1134/s1064230714020129 · Cited by 21
Alimoradi, A., Yussuf, R. M., Ismail, N. B., et al. (2014) · International Journal of Sustainable Engineering · doi:10.1080/19397038.2014.906514 · Cited by 20
Fuzzy network design of sustainable supply chains
Costantino, N., Dotoli, M., Falagario, M., et al. (2012) · IFAC Proceedings Volumes · doi:10.3182/20120523-3-ro-2023.00154 · Cited by 9
Cited by
Lithium Supply Chain Optimization: A Global Analysis of Critical Minerals for Batteries
Jones, E. C. (2024) · Energies · doi:10.3390/en17112685 · Cited by 41
Metadata
- Authors
- Tosarkani, B. M., & Amin, S. H.
- Affiliations
- Toronto Metropolitan University (CA)
- Corresponding author
- Amin, Saman Hassanzadeh
- Venue
- Computers & Chemical Engineering
- Publisher
- Elsevier BV
- Published
- 2019-02
- Volume
- 121
- Pages
- 540-555
- ISSN
- 0098-1354 (ISSN-L)
- OpenAlex
- W2901020748
- Cited by
- 68
- References
- 61
- Citations by year
- 2026: 4 · 2025: 11 · 2024: 9 · 2023: 7 · 2022: 15 · 2021: 9 · 2020: 11 · 2019: 2
- FWCI
- 9.19
- Type
- journal article
- Language
- en
- Open access
- closed
- Licence
- www.elsevier.com/tdm/userlicense/1.0/ (tdm)
- www.elsevier.com/legal/tdmrep-license (tdm)
- Locations
- Computers & Chemical Engineering (publishedVersion)
- Funders
- Natural Sciences and Engineering Research Council of Canada (RGPIN-2017)
- Topics
- Social Sciences › Business, Management and Accounting › Strategy and Management › Sustainable Supply Chain Management
- Social Sciences › Decision Sciences › Management Science and Operations Research › Optimization and Mathematical Programming
- Social Sciences › Decision Sciences › Management Science and Operations Research › Supply Chain and Inventory Management
- Keywords
- closed-loop supply chain, facility location, lead-acid battery recycling, reverse logistics, multi-echelon supply chain, multi-objective optimization, environmental compliance, supply chain network design, uncertainty
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.