The DOI matches its Crossref record; 42 of the 42 references it cites were found in a registry or an index.
Building Information Modelling, Artificial Intelligence and Construction Tech
Open accessAbstract
Adoption of digital information tools in the construction sector provides fertile ground for the birth and growth of companies that specialize in applications of technologies to design and construction. While some of the technologies are new, many implement ideas proposed in construction research decades ago that were impractical without a sound digital building information foundation. Building Information Modelling (BIM) itself can be traced to a landmark paper from 1975; ideas for artificially intelligent design and code checking tools date from the mid-1980s; and construction robots have laboured in research labs for decades. Yet only within the past five years has venture capital actively sought startup companies in the ‘Construction Tech’ sector. Following a set of digital construction innovations through their known past and their uncertain present, we review their increasingly optimistic future, all through the lens of their dependence on digital information. The review identifies new challenges, yielding a set of research topics with the potential to unlock a range of future applications that apply artificial intelligence.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
(2006) · Springer eBooks · Cited by 8,123
On understanding computers and cognition: A new foundation for design
Winograd, T., & Flores, F. (1987) · Artificial Intelligence · doi:10.1016/0004-3702(87)90026-9 · Cited by 3,677
THE LAST PLANNER SYSTEM OF PRODUCTION CONTROL
Ballard, H. G. (2000) · University of Birmingham Institutional Research Archive (University of Birmingham) · Cited by 2,057
(1986) · Zeitschrift für wirtschaftlichen Fabrikbetrieb · doi:10.1515/zwf-1986-811227 · Cited by 1,932
An exploration towards a production theory and its application to construction
Koskela, L. (2000) · Aaltodoc (Aalto University) · Cited by 1,796
Hayes-Roth, F. A., WATERMAN, D. A., & Lenat, D. B. (1983) · Andalas University Repository (Andalas University) · Cited by 1,702
Understanding computers and cognition: A new foundation for design
Suchman, L. A. (1987) · Artificial Intelligence · doi:10.1016/0004-3702(87)90024-5 · Cited by 1,055
Sacks, R., Eastman, C., Lee, G., & Teicholz, P. (2018) · Wiley eBooks · doi:10.1002/9781119287568 · Cited by 884
Self-citationChi, H.-L., Kang, S.-C., & Wang, X. (2013) · Automation in Construction · doi:10.1016/j.autcon.2012.12.017 · Cited by 476
Augmented Reality in built environment: Classification and implications for future research
Wang, X., Kim, M. J., Love, P. E. D., & Kang, S.-C. (2013) · Automation in Construction · doi:10.1016/j.autcon.2012.11.021 · Cited by 293
Computer age statistical inference algorithms, evidence, and data science
Efron, B., & Hastie, T. J. (2016) · Thammasat University Digital Collections · Cited by 282
Integrating semantic NLP and logic reasoning into a unified system for fully-automated code checking
Zhang, J., & El-Gohary, N. M. (2017) · Automation in Construction · doi:10.1016/j.autcon.2016.08.027 · Cited by 255
Automated project performance control of construction projects
Navon, R. (2005) · Automation in Construction · doi:10.1016/j.autcon.2004.09.006 · Cited by 248
Parametric 3D modeling in building construction with examples from precast concrete
Sacks, R., Eastman, C. M., & Lee, G. (2004) · Automation in Construction · doi:10.1016/s0926-5805(03)00043-8 · Cited by 241
Self-citationAssessing research issues in Automated Project Performance Control (APPC)
Navon, R., & Sacks, R. (2007) · Automation in Construction · doi:10.1016/j.autcon.2006.08.001 · Cited by 225
Self-citationSemantic Enrichment for Building Information Modeling
Belsky, M., Sacks, R., & Brilakis, I. (2016) · Computer-Aided Civil and Infrastructure Engineering · doi:10.1111/mice.12128 · Cited by 191
Self-citationBuchmann, A., & Koldehofe, B. (2009) · itit · doi:10.1524/itit.2009.9058 · Cited by 184
Comparing machine learning and rule-based inferencing for semantic enrichment of BIM models
Bloch, T., & Sacks, R. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.03.018 · Cited by 182
Self-citationAugmented reality-based computational fieldwork support for equipment operations and maintenance
Lee, S., & Akin, Ö. (2011) · Automation in Construction · doi:10.1016/j.autcon.2010.11.004 · Cited by 161
The Use of Computers Instead of Drawings in Building Design.
Eastman, C. M. (1975) · Cited by 149
BIMQL – An open query language for building information models
Mazairac, W., & Beetz, J. (2013) · Advanced Engineering Informatics · doi:10.1016/j.aei.2013.06.001 · Cited by 147
Costin, A. M., Pradhananga, N., & Teizer, J. (2012) · Automation in Construction · doi:10.1016/j.autcon.2012.02.015 · Cited by 139
Concept Relation Extraction from Construction Documents Using Natural Language Processing
Qady, M. A., & Kandil, A. (2009) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000131 · Cited by 135
Diffusion of Building Information Modeling Functions in the Construction Industry
Gholizadeh, P., Esmaeili, B., & Goodrum, P. M. (2017) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000589 · Cited by 131
Hall, D., Whyte, J. K., & Lessing, J. (2019) · Construction Management and Economics · doi:10.1080/01446193.2019.1656814 · Cited by 130
Location-Based Management for Construction: Planning, scheduling and control
Kenley, R., & Seppänen, O. (2006) · Swinburne figshare (Swinburne University of Technology) · Cited by 125
Sacks, R., Ma, L., Yosef, R., Borrmann, A., Daum, S. O., & Kattel, U. (2017) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000705 · Cited by 119
Self-citationNew Automated BIM Object Classification Method to Support BIM Interoperability
Wu, J., & Zhang, J. (2019) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000858 · Cited by 114
Review of digital technologies to improve productivity of New Zealand construction industry
Chowdhury, T., Adafin, J., & Wilkinson, S. J. (2019) · Journal of Information Technology in Construction · doi:10.36680//j.itcon.2019.032 · Cited by 112
Location‐Based Management for Construction: Planning, Scheduling and Control
Gravitt, D. D. (2011) · Construction Management and Economics · doi:10.1080/01446193.2010.542469 · Cited by 101
What constitutes good production flow in construction?
Sacks, R. (2016) · Construction Management and Economics · doi:10.1080/01446193.2016.1200733 · Cited by 100
Self-citationA knowledge-based standards processor for structural component design
Garrett, J. H., & Fenves, S. J. (1987) · Engineering With Computers · doi:10.1007/bf01276414 · Cited by 95
(1975) · Computer-Aided Design · doi:10.1016/0010-4485(75)90098-6 · Cited by 92
IFC-Based Graph Data Model for Topological Queries on Building Elements
Khalili, A., & Chua, D. K. H. (2013) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000331 · Cited by 87
Material-Based Construction Site Image Retrieval
Brilakis, I., Soibelman, L., & Shinagawa, Y. (2005) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)0887-3801(2005)19:4(341 · Cited by 81
Self-citationKoo, B., & Shin, B. (2018) · Journal of Computational Design and Engineering · doi:10.1016/j.jcde.2018.03.002 · Cited by 67
Philosophy of design: an editorial introduction
Galle, P. (2002) · Design Studies · doi:10.1016/s0142-694x(01)00034-5 · Cited by 43
Song, J. Y., Kim, J., & Lee, J.-K. (2018) · International Symposium on Automation and Robotics in Construction (ISARC) · doi:10.22260/isarc2018/0080 · Cited by 42
2D Bar‐Code Applications in Construction
McCullouch, B. G., & Lueprasert, K. (1994) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1994)120:4(739 · Cited by 27
An Automated System for Projection of Interior Construction Layouts
Degani, A., Li, W. B., Sacks, R., & Ma, L. (2019) · IEEE Transactions on Automation Science and Engineering · doi:10.1109/tase.2019.2897135 · Cited by 23
Self-citationSystemic Innovation of Complex One-off Products: The Case of Green Buildings
Katila, R., Levitt, R. E., & Sheffer, D. A. (2018) · Emerald Group Publishing Limited eBooks · doi:10.1108/s0742-332220180000040011 · Cited by 21
IMPLEMENTATION AND EVALUATION OF A MOBILE AUGMENTED REALITY SYSTEM FOR BUILDING MAINTENANCE 1
Woodward, C., Kuula, T., Honkamaa, P., et al. (2014) · Cited by 6
Cited by
Construction with digital twin information systems
Sacks, R., Brilakis, I., Pikas, E., Xie, H. S., & Girolami, M. (2020) · Data-Centric Engineering · doi:10.1017/dce.2020.16 · Cited by 609
“The results of other research suggest that property graph representations with late binding schema objects are apparently most appropriate (Sacks et al., 2020).”
BackgroundResultSelf-citationDigital technologies can enhance climate resilience of critical infrastructure
Argyroudis, S. A., Mitoulis, S. A., Chatzi, E., Baker, J. W., Brilakis, I., Gkoumas, K., Vousdoukas, M., Hynes, W., Carluccio, S., Keou, O., et al. (2022) · Climate Risk Management · doi:10.1016/j.crm.2021.100387 · Cited by 361
Self-citationAn overview of machine learning applications for smart buildings
Alanne, K., & Sierla, S. (2022) · Sustainable Cities and Society · doi:10.1016/j.scs.2021.103445 · Cited by 280
Regona, M., Yigitcanlar, T., Hon, C., & Teo, M. (2024) · Sustainable Cities and Society · doi:10.1016/j.scs.2024.105499 · Cited by 254
Ghimire, P., Kim, K., & Acharya, M. (2024) · Buildings · doi:10.3390/buildings14010220 · Cited by 175
Metadata
- Authors
- Sacks, R., Girolami, M., & Brilakis, I.
- Venue
- Developments in the Built Environment
- Publisher
- Elsevier BV
- Published
- 2020-11
- Volume
- 4
- Pages
- 100011
- ISSN
- 2666-1659 (ISSN-L)
- OpenAlex
- W3024505128
- Cited by
- 272
- References
- 42
- FWCI
- 15.88
- Type
- journal article
- Language
- en
- Open access
- gold
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.