Cited by 609BIM and Construction IntegrationDigital Transformation in IndustryConstruction Management and Sustainability

Construction with digital twin information systems

Open access
Sacks, Rafael, Brilakis, Ioannis, Pikas, Ergo, Xie, Haiyan Sally, Girolami, Mark·2020·Data-Centric Engineering

Abstract

The concept of a “digital twin” as a model for data-driven management and control of physical systems has emerged over the past decade in the domains of manufacturing, production, and operations. In the context of buildings and civil infrastructure, the notion of a digital twin remains ill-defined, with little or no consensus among researchers and practitioners of the ways in which digital twin processes and data-centric technologies can support design and construction. This paper builds on existing concepts of Building Information Modeling (BIM), lean project production systems, automated data acquisition from construction sites and supply chains, and artificial intelligence to formulate a mode of construction that applies digital twin information systems to achieve closed loop control systems. It contributes a set of four core information and control concepts for digital twin construction (DTC), which define the dimensions of the conceptual space for the information used in DTC workflows. Working from the core concepts, we propose a DTC information system workflow—including information stores, information processing functions, and monitoring technologies—according to three concentric control workflow cycles. DTC should be viewed as a comprehensive mode of construction that prioritizes closing the control loops rather than an extension of BIM tools integrated with sensing and monitoring technologies.

Integrity signals

Registry

Crossref · 10.1017/dce.2020.16

Cites

88 of 88 references verified0 citation errors · 0 not checkable

Statistics

Recomputing p-values needs the paper’s full text.

Claims the paper makes

We couldn’t retrieve this paper’s full text, so its claims and self-check weren’t run. The registry and citation checks still apply.

Claims other papers make about this one

Each is checked against this paper’s own text: does it say what the citing paper says it does?

Cites

Flagged first, then by citations

3 of the 91 references couldn’t be matched to a known paper.

Cited by

Sorted by citations

Authors
Sacks, R., Brilakis, I., Pikas, E., Xie, H. S., & Girolami, M.
Affiliations
  • Technion – Israel Institute of Technology (IL)
  • University of Cambridge (GB)
  • Aalto University (FI)
Corresponding author
Sacks, Rafael
Venue
Data-Centric Engineering
Published
2020
Volume
1
ISSN
2632-6736 (ISSN-L)
OpenAlex
W3107782157
Cited by
609
References
91
Citations by year
2026: 133 · 2025: 129 · 2024: 128 · 2023: 106 · 2022: 73 · 2021: 40
FWCI
29.01
Type
journal article
Language
en
Open access
Locations
  • Data-Centric Engineering (publishedVersion, cc-by)
  • DOAJ (DOAJ: Directory of Open Access Journals) (submittedVersion)
  • Cambridge University Engineering Department Publications Database (submittedVersion)
  • Apollo (University of Cambridge) (submittedVersion, cc-by)
  • Apollo (cc-by)
Funders
  • Department for Business, Energy and Industrial Strategy, UK Government
  • UK Research and Innovation
  • University of Cambridge
  • Engineering and Physical Sciences Research Council (EP/R034710/1)
  • Innovate UK
Topics
  • Physical Sciences › Engineering › Building and Construction › BIM and Construction Integration
  • Physical Sciences › Engineering › Industrial and Manufacturing Engineering › Digital Transformation in Industry
  • Physical Sciences › Engineering › Building and Construction › Construction Management and Sustainability
Keywords
digital twin, construction, building information modeling, lean construction, feedback control, construction information systems, construction monitoring, data acquisition, artificial intelligence in construction, civil infrastructure

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review