GPT models in construction industry: Opportunities, limitations, and a use case validation
Open accessAbstract
Large Language Models (LLMs) trained on large data sets came into prominence in 2018 after Google introduced BERT. Subsequently, different LLMs such as GPT models from OpenAI have been released. These models perform well on diverse tasks and have been gaining widespread applications in fields such as business and education. However, little is known about the opportunities and challenges of using LLMs in the construction industry. Thus, this study aims to assess GPT models in the construction industry. A critical review, expert discussion and case study validation are employed to achieve the study's objectives. The findings revealed opportunities for GPT models throughout the project lifecycle. The challenges of leveraging GPT models are highlighted and a use case prototype is developed for materials selection and optimization. The findings of the study would be of benefit to researchers, practitioners and stakeholders, as it presents research vistas for LLMs in the construction industry.
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
During the design phase, LLMs can perform code compliance verification, cost estimation, energy efficiency modeling, and automated design generation.
“During the design phase, they perform code compliance verification, cost estimation, energy efficiency modeling, and automated design generation (Saka et al. 2023a, b ).”
From A review of LLMs and their applications in the architecture, engineering and construction industry (2025) · cites this paper as Saka et al. 2023a, b
Sections 5.2.1, 5.2.2, and 5.2.4 describe design-idea generation, automated code-compliance checks, and project costing as potential design-phase uses of GPT models. Section 5.2.5 discusses improving energy-efficiency analysis, including guidance on simulation tools and interpretation of results, but does not say the models independently perform energy-efficiency modeling. The paper presents these as opportunities rather than established capabilities across all four tasks. (LLM, conf=0.88)
Experimental — accuracy not yet measuredSaka et al. (2023a) present current applications leveraging models from the ChatGPT family, however only a limited number of them.
“They present current applications leveraging models from the ChatGPT family, however only a limited num -ber of them.”
From A review of LLMs and their applications in the architecture, engineering and construction industry (2025) · cites this paper as Saka et al. 2023a
Saka et al. (2023a) did a holistic review of GPT models in the construction industry, focusing on opportunities and limitations in all stages of construction.
“Saka et al. ( 2023a ) did a holistic review of GPT models in the construction industry, focusing on opportunities and limitations in all stages of construction.”
From A review of LLMs and their applications in the architecture, engineering and construction industry (2025) · cites this paper as Saka et al. 2023a
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Cites
BERT: Pre-training of Deep Bidirectional Transformers for Language Understanding
Devlin, J., Chang, M.-W., Lee, K., & Toutanova, K. (2019) · Proceedings of the 2019 Conference of the North American Chapter of the Association for Computational Linguistics: Human Language Technologies, Volume 1 (Long and Short Papers) · doi:10.18653/v1/n19-1423 · Cited by 48,293 · see citing works
Survey of Hallucination in Natural Language Generation
Ji, Z., Lee, N., Frieske, R., Yu, T., Su, D., Xu, Y., Ishii, E., Bang, Y. J., Madotto, A., & Fung, P. (2023) · ACM Computing Surveys · doi:10.1145/3571730 · Cited by 5,025 · see citing works
The Delphi Technique: Making Sense of Consensus
Hsu, C.-C., & Sandford, B. A. (2007) · University of Massachusetts Amherst · doi:10.7275/pdz9-th90 · Cited by 4,500 · see citing works
Liu, P., Yuan, W., Fu, J., Jiang, Z., Hayashi, H., & Neubig, G. (2023) · ACM Computing Surveys · doi:10.1145/3560815 · Cited by 4,361 · see citing works
Liu, P., Yuan, W., Fu, J., Jiang, Z., Hayashi, H., & Neubig, G. (2021) · arXiv · doi:10.48550/arxiv.2107.13586 · Cited by 4,352 · see citing works
Training language models to follow instructions with human feedback
Ouyang, L., Wu, J., Jiang, X., Almeida, D., Wainwright, C. L., Mishkin, P., Zhang, C., Agarwal, S., Slama, K., Ray, A., et al. (2022) · arXiv · doi:10.48550/arxiv.2203.02155 · Cited by 4,208 · see citing works
ChatGPT in healthcare: A taxonomy and systematic review
Li, J., Dada, A., Puladi, B., Kleesiek, J., & Egger, J. (2024) · Computer Methods and Programs in Biomedicine · doi:10.1016/j.cmpb.2024.108013 · Cited by 452 · see citing works
ChatGPT is not all you need. A state-of-the-art review of large generative AI models
Gozalo-Brizuela, R., & Garrido-Merchan, E. C. (2023) · arXiv · doi:10.48550/arxiv.2301.04655 · Cited by 245 · see citing works
Saka, A. B., Oyedele, L. O., Akanbi, L. A., Ganiyu, S. A., Chan, D. W. M., & Bello, S. A. (2023) · Advanced Engineering Informatics · doi:10.1016/j.aei.2022.101869 · Cited by 161 · see citing works
Self-citationLeveraging ChatGPT to Aid Construction Hazard Recognition and Support Safety Education and Training
Uddin, S. M. J., Albert, A., Ovid, A., & Alsharef, A. (2023) · Sustainability · doi:10.3390/su15097121 · Cited by 158 · see citing works
Amer, F., Jung, Y., & Golparvar-Fard, M. (2021) · Automation in Construction · doi:10.1016/j.autcon.2021.103929 · Cited by 68 · cited 1× · see citing works
“On the other hand, Amer et al. (2021), Prieto et al. (2023) and You et al. (2023) leveraged text for the application.”
BackgroundFrugalGPT: How to Use Large Language Models While Reducing Cost and Improving Performance
Chen, L., Zaharia, M., & Zou, J. (2023) · arXiv · doi:10.48550/arxiv.2305.05176 · Cited by 51 · see citing works
Momade, M., Durdyev, S., Estrella, D., & Ismail, S. (2021) · Frontiers in Engineering and Built Environment · doi:10.1108/febe-07-2021-0036 · Cited by 45 · see citing works
Flagged first, then by citations
Research works printed but not linked: 107
- Abioye, S.O., Oyedele, L.O., Akanbi, L., Ajayi, A., Davila Delgado, J.M., Bilal, M., Akinade, O.O., Ahmed, A., 2021. Artificial intelligence in the construction industry: A review of present status, opportunities and future challenges. J. Build. Eng. 44 https://doi.org/10.1016/j.jobe.2021.103299. · DOI · Paper page
- Abu Bakar, N.N., Hassan, M.Y., Abdullah, H., Rahman, H.A., Abdullah, M.P., Hussin, F., Bandi, M., 2015. Energy efficiency index as an indicator for measuring building energy performance: A review. Renew. Sustain. Energy Rev. 44, 1-11. https://doi. org/10.1016/j.rser.2014.12.018. · DOI
- Adedara, M.L., Taiwo, R., Bork, H.-R., 2023. Municipal solid waste collection and coverage rates in sub-saharan african countries: A comprehensive systematic review and meta-Analysis. Waste 1, 389-413.
- Akanbi, L.A., Oyedele, L.O., Akinade, O.O., Ajayi, A.O., Davila Delgado, M., Bilal, M., Bello, S.A., 2018. Salvaging building materials in a circular economy: A BIM-based whole-life performance estimator. Resour. Conserv. Recycl. 129, 175-186. https:// doi.org/10.1016/j.resconrec.2017.10.026. May 2017. · DOI · Paper page
- Akinosho, T.D., Oyedele, L.O., Bilal, M., Ajayi, A.O., Delgado, M.D., Akinade, O.O., Ahmed, A.A., 2020. Deep learning in the construction industry: A review of present status and future innovations. J. Build. Eng. 32 https://doi.org/10.1016/j. jobe.2020.101827. · DOI
- Alipour-Bashary, M., Ravanshadnia, M., Abbasianjahromi, H., Asnaashari, E., 2022. Building demolition risk assessment by applying a hybrid fuzzy FTA and fuzzy CRITIC-TOPSIS framework. Int. J. Build. Pathol. Adapt. 40 (1), 134-159. https://doi. org/10.1108/IJBPA-08-2020-0063. · DOI
- Al-shihabi, S., Mladenović, N., 2022. A mixed integer linear programming model and a basic variable neighbourhood search algorithm for the repatriation scheduling problem. Expert Syst. Appl. 198 (February), 116728 https://doi.org/10.1016/j. eswa.2022.116728. · DOI
- Amaral, R.E.C., Brito, J., Buckman, M., Drake, E., Ilatova, E., Rice, P., Sabbagh, C., Voronkin, S., Abraham, Y.S., 2020. Waste management and operational energy for sustainable buildings: A review. Sustainability 12 (13). https://doi.org/10.3390/ su12135337. · DOI
- As, I., Pal, S., Basu, P., 2018. Artificial intelligence in architecture: generating conceptual design via deep learning. Int. J. Architect. Comput. 16 (4), 306-327. https://doi.org/ 10.1177/1478077118800982. · DOI
- Asiedu, R.O., Adaku, E., Owusu-Manu, D.-G., 2017. Beyond the causes. Construct. Innovat. 17 (3), 363-380. https://doi.org/10.1108/ci-01-2016-0003. · DOI
- Assaf, M., Hussein, M., Abdelkhalek, S., Zayed, T., 2023. A multi-criteria decision- making model for selecting the best project delivery systems for offsite construction projects. Buildings 13 (2), 571. https://doi.org/10.3390/BUILDINGS13020571/S1. · DOI
- Bach, C., Bernhaupt, R., D'Agostini, C.S., Winckler, M., 2013. Mobile applications for incident reporting systems in urban contexts: lessons learned from an empirical study. ACM International Conference Proceeding Series. https://doi.org/10.1145/ 2501907.2501960. · DOI
- Bavarian, M., Jun, H., Tezak, N., Schulman, J., McLeavey, C., Tworek, J., Chen, M., 2022. Efficient Training of Language Models to Fill in the Middle. http://arxiv.org/abs/22 07.14255.
- Beach, T.H., Hippolyte, J., Rezgui, Y., 2020. Towards the adoption of automated regulatory compliance checking in the built environment. Autom. ConStruct. 118 (May), 103285 https://doi.org/10.1016/j.autcon.2020.103285. · DOI
- Beata, P.A., Jeffers, A.E., Kamat, V.R., 2018. Real-time fire monitoring and visualization for the post-ignition fire state in a building. Fire Technol. 54 (4), 995-1027. https:// doi.org/10.1007/s10694-018-0723-1. · DOI
- Bilal, M., Oyedele, L.O., Qadir, J., Munir, K., Ajayi, S.O., Akinade, O.O., Owolabi, H.A., Alaka, H.A., Pasha, M., 2016. Big Data in the construction industry: A review of present status, opportunities, and future trends. Adv. Eng. Inf. 30 (3), 500-521.
- Boehm, B.W., 1984. Verifying and validating software requirements and design specifications. IEEE Soft. 1 (1), 75-88. https://doi.org/10.1109/MS.1984.233702. · DOI
- Bouabdallaoui, Y., Lafhaj, Z., Yim, P., Ducoulombier, L., Bennadji, B., 2021. Predictive maintenance in building facilities: A machine learning-based approach. Sensors 21 (4), 1-15. https://doi.org/10.3390/s21041044. · DOI
- Brown, T.B., Mann, B., Ryder, N., Subbiah, M., Kaplan, J., Dhariwal, P., Neelakantan, A., Shyam, P., Sastry, G., Askell, A., Agarwal, S., Herbert-Voss, A., Krueger, G., Henighan, T., Child, R., Ramesh, A., Ziegler, D.M., Wu, J., Winter, C., et al., 2020. Language models are few-shot learners. Advances in Neural Information Processing Systems 33, 1877-1901.
- Budayan, C., Dikmen, I., Birgonul, M.T., 2015. Alignment of project management with business strategy in construction: evidence from the Turkish contractors. J. Civ. Eng. Manag. 21 (1), 94-106. https://doi.org/10.3846/13923730.2013.802737. · DOI
- Castro-lacouture, D., Asce, A.M., Süer, G.A., Gonzalez-joaqui, J., Yates, J.K., 2009. Construction project scheduling with time , cost. Mater. Restrictions Using Fuzzy Math. Mod. Critical Path Method 135, 1096-1104. https://doi.org/10.1061/(ASCE) 0733-9364(2009)135. October. · DOI
- Chaphalkar, N.B., Iyer, K.C., Patil, S.K., 2015. Prediction of outcome of construction dispute claims using multilayer perceptron neural network model. Int. J. Proj. Manag. 33 (8), 1827-1835. https://doi.org/10.1016/j.ijproman.2015.09.002. · DOI
- Chen, Y., Kamara, J.M., 2005. The Use of Mobile Computing in Construction Information Management. 21st Annual Conference of the Association of Researchers in Construction Management. ARCOM) SOAS, London.
- Cheng, M.Y., Tsai, H.C., Hsieh, W.S., 2009. Web-based conceptual cost estimates for construction projects using Evolutionary Fuzzy Neural Inference Model. Autom. ConStruct. 18 (2), 164-172. https://doi.org/10.1016/j.autcon.2008.07.001. · DOI
- Cheriyan, D., Choi, J.-H., 2020. A review of research on particulate matter pollution in the construction industry. J. Clean. Prod. 254, 120077 https://doi.org/10.1016/j. jclepro.2020.120077. · DOI
- Chew, K.C., 2010. Singapore's strategies towards sustainable construction. IES J. Part A Civ. Struct. Eng. 3 (3), 196-202. https://doi.org/10.1080/19373260.2010.491641. · DOI
- Cornwell, N., Bilson, C., Gepp, A., Stern, S., Vanstone, B.J., 2022. The Role of Data Analytics within Operational Risk Management: A Systematic Review from the Financial Services and Energy Sectors, vol. 74, pp. 374-402. https://doi.org/ 10.1080/01605682.2022.2041373, 1. · DOI
- Dannoun, Y., 2022. Application of supply chains management in construction project : a review in the compatibility between the procurements and implementation process. Int. J. Adv. Eng., Sci. Appl. 3 (1), 18-21.
- Dikbas, A., Ergen, E., Giritli, H., 2010. A review of the artificial intelligence applications in construction dispute resolution. In: Managing IT in Construction/Managing Construction for Tomorrow. Routledge.
- Dimyadi, J., Pauwels, P., Spearpoint, M., Clifton, C., Amor, R., 2015. Querying a regulatory model for compliant building design Audit. In: Proc. Of the 32nd CIB W78 Conference 2015, pp. 139-148. https://doi.org/10.13140/RG.2.1.4022.6003, 27th- 29th October 2015, Eindhoven, The Netherlands, October. · DOI
- Dolphin, W.S.Y., Alshami, A.A.M., Tariq, S., Boadu, V., Mohandes, S.R., Ridwan, T., Zayed, T., 2021. Effectiveness of policies and difficulties in improving safety performance of repair, maintenance, minor alteration, and addition works in Hong Kong. Int. J. Construct. Manag. 0 (0), 1-30. https://doi.org/10.1080/ 15623599.2021.1935130. · DOI
- Elghaish, F., Chauhan, J.K., Matarneh, S., Pour Rahimian, F., Hosseini, M.R., 2022. Artificial intelligence-based voice assistant for BIM data management. Autom. ConStruct. 140 https://doi.org/10.1016/j.autcon.2022.104320. · DOI
- El-Omari, S., Moselhi, O., 2009. Integrating automated data acquisition technologies for progress reporting of construction projects. 2009 26th International Symposium on Automation and Robotics in Construction. ISARC 2009 86-94. https://doi.org/ 10.22260/isarc2009/0048. · DOI
- Emovon, I., Oghenenyerovwho, O.S., 2020. Application of MCDM method in material selection for optimal design: A review. Res. Mater. 7 https://doi.org/10.1016/j. rinma.2020.100115. · DOI
- Firat, M., 2023. How ChatGPT Can Transform Autodidactic Experiences and Open Education? Preprint. https://doi.org/10.31219/osf.io/9ge8m. · DOI · Paper page
- Florez, L., Castro-Lacouture, D., 2013. Optimization model for sustainable materials selection using objective and subjective factors. Mater. Des. 46, 310-321. https:// doi.org/10.1016/j.matdes.2012.10.013. · DOI
- Fulford, R., Standing, C., 2014. Construction industry productivity and the potential for collaborative practice. Int. J. Proj. Manag. 32 (2), 315-326. https://doi.org/ 10.1016/j.ijproman.2013.05.007. · DOI
- Gambatese, J.A., Hallowell, M., 2011. Factors that influence the development and diffusion of technical innovations in the construction industry. Construct. Manag. Econ. 29 (5), 507-517. https://doi.org/10.1080/01446193.2011.570355. · DOI
- Grussing, M.N., 2014. Life cycle Asset management methodologies for buildings. J. Infrastruct. Syst. 20 (1), 1-8. https://doi.org/10.1061/(asce)is.1943- 555x.0000157. · DOI
- Globerson, S., Zwikael, O., 2002. Impact of the project manager on project management planning processes. Proj. Manag. J. 31 (3), 58-64. https://doi.org/10.1177/ 875697280203300308. · DOI
- Guo, K., Zhang, L., 2022. Multi-objective optimization for improved project management: current status and future directions. Autom. ConStruct. 139, 104256 https://doi.org/10.1016/J.AUTCON.2022.104256. · DOI
- Hagras, H., Packham, I., Vanderstockt, Y., McNulty, N., Vadher, A., Doctor, F., 2008. An intelligent Agent based Approach for energy management in commercial buildings. Fuzzy Syst. Conf. 156-162.
- Hernández, A., Amigó, J.M., 2021. Attention mechanisms and their Applications to complex systems. Entropy 2021 23 (3), 283. https://doi.org/10.3390/E23030283, 23, Page 283. · DOI
- Hon, C.K.H., Chan, A.P.C., Chan, D.W.M., 2011. Strategies for improving safety performance of repair, maintenance, minor alteration and addition (RMAA) works. Facilities 29 (13/14), 591-610. https://doi.org/10.1108/02632771111178391. · DOI
- Hussin, F., Md Rahim, S.A.N., Hatta, N.S.M., Aroua, M.K., Mazari, S.A., 2023. A systematic review of machine learning approaches in carbon capture applications. J. CO2 Util. 71. https://doi.org/10.1016/J.JCOU.2023.102474. · DOI
- Ibrahim, Y.M., Lukins, T.C., Zhang, X., Trucco, E., Kaka, A.P., 2009. Towards automated progress assessment of workpackage components in construction projects using computer vision. Adv. Eng. Inf. 23 (1), 93-103. https://doi.org/10.1016/j. aei.2008.07.002. · DOI
- Jenkins, D.A., Smith, T.E., 1994. Applying Delphi methodology in family therapy research. Contemp. Fam. Ther. 16 (5), 411-430. https://doi.org/10.1007/ bf02197902. · DOI
- Jiang, H., 2019. Mobile fire evacuation system for large public buildings based on Artificial intelligence and IoT. IEEE Access 7, 64101-64109. https://doi.org/ 10.1109/ACCESS.2019.2915241. · DOI
- Kim, C., Son, H., Kim, C., 2013. Automated construction progress measurement using a 4D building information model and 3D data. Autom. ConStruct. 31, 75-82. https:// doi.org/10.1016/j.autcon.2012.11.041. · DOI
- Kim, Y., Chin, S., Choo, S., 2022. BIM data requirements for 2D deliverables in construction documentation. Autom. ConStruct. 140, 104340 https://doi.org/ 10.1016/J.AUTCON.2022.104340. · DOI
- Kotei, E., Thirunavukarasu, R., 2023. A systematic review of transformer-based pre- trained Language Models through self-supervised learning. Information 2023 14 (3), 187. https://doi.org/10.3390/INFO14030187, 14, Page 187. · DOI · Paper page
- Koubaa, A., Boulila, W., Ghouti, L., Alzahem, A., Latif, S., 2023. Exploring ChatGPT capabilities and limitations : A critical review of the NLP game changer. Preprints, March, 1-18. https://doi.org/10.20944/preprints202303.0438.v1. · DOI
- Kraft, K., 2019. Language policies and linguistic competence: new speakers in the Norwegian construction industry. Lang. Pol. 18 (4), 573-591. https://doi.org/ 10.1007/s10993-018-9502-6. · DOI
- Kulkarni, P., Mahabaleshwarkar, A., Kulkarni, M., Sirsikar, N., Gadgil, K., 2019. Conversational AI: an overview of methodologies, applications & future scope. 5th International Conference on Computing, Communication, Control and Automation (ICCUBEA). IEEE, 2019 1-7. https://doi.org/10.1109/ ICCUBEA47591.2019.9129347. · DOI
- Kusimo, H., Oyedele, L., Akinade, O., Oyedele, A., Abioye, S., Agboola, A., Mohammed- Yakub, N., 2019. Optimisation of resource management in construction projects: a big data approach. World J. Sci. Technol. Sustain. Dev. 16 (2), 82-93. https://doi. org/10.1108/wjstsd-05-2018-0044. · DOI
- Lai, V.D., Ngo, N.T., Veyseh, A. P. Ben, Man, H., Dernoncourt, F., Bui, T., Nguyen, T.H., 2023. ChatGPT beyond English: towards a comprehensive evaluation of large Language Models in multilingual learning. http://arxiv.org/abs/2304.05613. · arXiv
- Lewis, R., Séquin, C., 1998. Generation of 3D building models from 2D architectural plans. CAD Comput. Aided Des. 30 (10), 765-779. https://doi.org/10.1016/S0010- 4485(98)00031-1. · DOI
- Linares-Garcia, D.A., Roofigari-Esfahan, N., Pratt, K., Jeon, M., 2022. Voice-based intelligent virtual Agents (VIVA) to support construction worker productivity. Autom. ConStruct. 143 https://doi.org/10.1016/j.autcon.2022.104554. · DOI
- Liu, X., Jing, X., Zhu, Q., Du, W., Wang, X., 2023. Automatic construction hazard identification integrating on-site scene graphs with information extraction in outfield test. Buildings 13 (2), 377. https://doi.org/10.3390/buildings13020377. · DOI
- Lu, Y., Sood, T., Chang, R., Liao, L., 2020. Factors Impacting Integrated Design Process of Net Zero Energy Buildings: an Integrated Framework, vol. 22, pp. 1700-1712. https://doi.org/10.1080/15623599.2020.1742625, 9. · DOI
- Macit ˙Ilal, S., Günaydın, H.M., 2017. Computer representation of building codes for automated compliance checking. Autom. ConStruct. 82, 43-58. https://doi.org/ 10.1016/j.autcon.2017.06.018. May 2016. · DOI
- Marjaba, G.E., Chidiac, S.E., 2016. Sustainability and resiliency metrics for buildings - critical review. Build. Environ. 101, 116-125. https://doi.org/10.1016/j. buildenv.2016.03.002. · DOI
- McAleenan, P., 2020. Moral responsibility and action in the use of artificial intelligence in construction. Proc. Inst. Civil Eng.-Manag. Procurement Law 173 (4), 166-174. https://doi.org/10.1680/jmapl.19.00056. · DOI
- Miller, S., 2016. An aggregated Approach to risk Analysis: risk portfolios. Risk portfolios. Enterprise Risk Manag.: Common Framework Entire Organ. 141-149. https://doi. org/10.1016/B978-0-12-800633-7.00010-9. · DOI
- Mills, A., 2001. A systematic approach to risk management for construction. Struct. Surv. 19 (5), 245-252. https://doi.org/10.1108/02630800110412615/FULL/XML. · DOI
- Na, S., Heo, S., Han, S., Shin, Y., Roh, Y., 2022. Acceptance model of Artificial intelligence (AI)-Based technologies in construction firms: Applying the technology Acceptance model (TAM) in combination with the technology-organisation-environment (TOE) framework. Buildings 12 (2). https:// doi.org/10.3390/buildings12020090. · DOI
- Neelakantan, A., Xu, T., Puri, R., Radford, A., Han, J.M., Tworek, J., Yuan, Q., Tezak, N., Kim, J.W., Hallacy, C., Heidecke, J., Shyam, P., Power, B., Nekoul, T.E., Sastry, G., Krueger, G., Schnurr, D., Such, F.P., Hsu, K., et al., 2022. Text and Code Embeddings by Contrastive Pre-training. http://arxiv.org/abs/2201.10005. · arXiv
- Nyamuchiwa, K., Lei, Z., Aranas, C., 2022. Cybersecurity vulnerabilities in off-site construction. Appl. Sci. 12 (10), 1-25. https://doi.org/10.3390/app12105037. · DOI
- Oluleye, B.I., Chan, D.W.M., Saka, A.B., Olawumi, T.O., 2022. Circular economy research on building construction and demolition waste: A review of current trends and future research directions. J. Clean. Prod. 357 https://doi.org/10.1016/j. jclepro.2022.131927. OpenAI, 2019. GPT-2: 1.5B Release. OpenAI Blog. · DOI
- OpenAI, 2023b. GPT-4 Technical Report. 4, 1-100. http://arxiv.org/abs/2303.08774. · arXiv
- Oraee, M., Hosseini, M.R., Edwards, D.J., Li, H., Papadonikolaki, E., Cao, D., 2019. Collaboration barriers in BIM-based construction networks: A conceptual model. Int. J. Proj. Manag. 37 (6), 839-854. https://doi.org/10.1016/j.ijproman.2019.05.004. · DOI
- Paaß, G., Giesselbach, S., 2023. Foundation Models for Natural Language Processing - Pre-trained Language Models Integrating Media. https://arxiv.org/abs/2302.
- Prieto, S.A., Mengiste, E.T., García de Soto, B., 2023. Investigating the use of ChatGPT for the scheduling of construction projects. Buildings 13 (4). https://doi.org/10.3390/ buildings13040857. · DOI · Paper page
- Radford, A., Kim, J.W., Xu, T., Brockman, G., McLeavey, C., Sutskever, I., 2022. Robust Speech Recognition via Large-Scale Weak Supervision. http://arxiv.org/abs/2212 .04356.
- Radford, A., Narasimhan, K., Salimans, T., Sutskever, I., 2018. Improving Language understanding by generative pre-training. Homol. Homotopy Appl. 9 (1), 399-438. https://www.cs.ubc.ca/~amuham01/LING530/papers/radford2018improving.pdf.
- Rahman, M.W., Islam, R., Hasan, A., Bithi, N.I., Hasan, M.M., Rahman, M.M., 2022. Intelligent waste management system using deep learning with IoT. J. King Saud University -Comput. Inform. 34 (5), 2072-2087. https://doi.org/10.1016/j. jksuci.2020.08.016. · DOI
- Ratnasabapathy, S., Rameezdeen, R., 2010. A decision support system for the selection of best procurement system in construction. Built-Environ. Sri Lanka 7 (2), 43. https:// doi.org/10.4038/BESL.V7I2.1943. · DOI
- Saka, A.B., Chan, D.W.M., 2019. Knowledge, skills and functionalities requirements for quantity surveyors in building information modelling (BIM) work environment: an international Delphi study. Architect. Eng. Des. Manag. 16 (3), 227-246. https://doi. org/10.1080/17452007.2019.1651247. · DOI
- Saka, A.B., Chan, D.W.M., 2020. Profound barriers to building information modelling (BIM) adoption in construction small and medium-sized enterprises (SMEs). Construct. Innovat.: Inf. Process. Manag. 20 (2), 261-284. https://doi.org/10.1108/ ci-09-2019-0087. · DOI
- Saka, A.B., Chan, D.W.M., Wuni, I.Y., 2022. Knowledge-based decision support for BIM adoption by small and medium-sized enterprises in developing economies. Autom. ConStruct. 141 https://doi.org/10.1016/j.autcon.2022.104407. · DOI
- Sezgin, E., Sirrianni, J., Linwood, S.L., 2022. Operationalizing and implementing pretrained, large Artificial intelligence linguistic models in the US health care system: outlook of generative pretrained transformer 3 (GPT-3) as a service model. JMIR Med. Inform. 10 (2), 1-7. https://doi.org/10.2196/32875. · DOI
- Shaalan, K., 2010. Rule-based Approach in Arabic Natural Language processing. International Journal on Information and Communication Technologies (IJICT). htt p://www.ieee.ma/IJICT/IJICT-SI-Bouzoubaa-3.3/3-Khaledl.pdf.
- Shehzad, H.M.F., Ibrahim, R.B., Yusof, A.F., Khaidzir, K.A.M., Iqbal, M., Razzaq, S., 2021. The role of interoperability dimensions in building information modelling. Comput. Ind. 129 https://doi.org/10.1016/j.compind.2021.103444. · DOI
- Shinn, N., Labash, B., Gopinath, A., 2023. Reflexion: an autonomous agent with dynamic memory and self-reflection. arXiv preprint. https://doi.org/10.48550/ arXiv.2303.11366. · DOI · Paper page
- Siraj, N.B., Asce, S.M., Fayek, A.R., Ph, D., Eng, P., Asce, M., 2019. Risk Identification and Common Risks in Construction: Literature Review and Content Analysis, vol. 145. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001685, 9. · DOI
- Taiwo, R., Ben Seghier, M.E.A., Zayed, T., 2023. Towards sustainable water infrastructure : the state-of-the-art for modeling the failure probability of water pipes. Water Resour. Res. 59, e2022WR033256 https://doi.org/10.1029/ 2022WR033256. · DOI
- Taiwo, R., Hussein, M., Zayed, T., 2022. An integrated Approach of simulation and regression Analysis for Assessing productivity in modular integrated construction projects. Buildings 12. https://doi.org/10.3390/buildings12112018. · DOI
- Taiwo, R., Shaban, I.A., Zayed, T., 2023a. Development of sustainable water infrastructure: A proper understanding of water pipe failure. J. Clean. Prod. https:// doi.org/10.1016/j.jclepro.2023. · DOI
- Tezel, A., Koskela, L., 2023. Off-site construction in highways projects: management, technical, and technology perspectives from the United Kingdom. https://doi.org/1 0.1080/01446193.2023.2167218. · DOI
- Tixier, A.J.P., Hallowell, M.R., Rajagopalan, B., Bowman, D., 2016. Application of machine learning to construction injury prediction. Autom. ConStruct. 69, 102-114. https://doi.org/10.1016/j.autcon.2016.05.016. · DOI
- Uzair, M., Chun, D., Han, H., Jeon, G., Chen, K., 2019. Energy & Buildings A review of the applications of artificial intelligence and big data to buildings for energy- efficiency and a comfortable indoor living environment. Energy Build. 202, 109383 https://doi.org/10.1016/j.enbuild.2019.109383. · DOI
- Vaswani, A., Shazeer, N., Parmar, N., Uszkoreit, J., Jones, L., Gomez, A.N., Kaiser, Ł., Polosukhin, I., 2017. Attention Is All You Need 31st Conference on Neural Information Processing Systems (NIPS 2017).
- Volk, R., Luu, T.H., Mueller-Roemer, J.S., Sevilmis, N., Schultmann, F., 2018. Deconstruction project planning of existing buildings based on automated acquisition and reconstruction of building information. Autom. ConStruct. 91, 226-245. https://doi.org/10.1016/j.autcon.2018.03.017. July 2017. · DOI
- Wang, Y.R., Yu, C.Y., Chan, H.H., 2012. Predicting construction cost and schedule success using artificial neural networks ensemble and support vector machines classification models. Int. J. Proj. Manag. 30 (4), 470-478. https://doi.org/10.1016/ j.ijproman.2011.09.002. · DOI
- Wei, C., Wang, Y.-C., Wang, B., Kuo, C.-C.J., 2023. An Overview on Language Models: Recent Developments and Outlook. https://arxiv.org/abs/2303.05759v1. · arXiv
- Wei, J., Wang, X., Schuurmans, D., Bosma, M., Chi, E., Le, Q., Zhou, D., 2022. Chain-of- Thought prompting elicits reasoning in large Language Models. arXiv preprint. https://doi.org/10.48550/arXiv.2201.11903. · DOI · Paper page
- Xia, Y., Lei, X., Wang, P., Sun, L., 2021. Artificial intelligence based structural assessment for regional short-and medium-span concrete beam bridges with inspection information. Rem. Sens. 13 (18) https://doi.org/10.3390/rs13183687. · DOI
- Yang, J., Jin, H., Tang, R., Han, X., Feng, Q., Jiang, H., Yin, B., Hu, X., 2023. Harnessing the Power of LLMs in Practice: A Survey on ChatGPT and beyond, vol. 1, pp. 1-24, 1. http://arxiv.org/abs/2304.13712. · arXiv
- Yeung, H.C., Ridwan, T., Tariq, S., Zayed, T., 2020. BEAM Plus implementation in Hong Kong : assessment of challenges and policies BEAM Plus implementation in Hong Kong : assessment of challenges and policies. Int. J. Construct. Manag. 0 (0), 1-15. https://doi.org/10.1080/15623599.2020.1827692. · DOI
- You, H., Ye, Y., Zhou, T., Zhu, Q., Du, J., 2023. Robot-enabled construction assembly with Automated sequence planning based on ChatGPT: RoboGPT. arXiv preprint. https://doi.org/10.48550/arXiv.2304.11018. · DOI · Paper page
- You, Z., Feng, L., 2020. Integration of industry 4.0 related technologies in construction industry: A framework of cyber-physical system. IEEE Access 8, 122908-122922. https://doi.org/10.1109/ACCESS.2020.3007206. · DOI
- Zhang, H., Song, H., Li, S., Zhou, M., Song, D., 2022. A survey of controllable text generation using transformer-based pre-trained Language Models. J. ACM 37 (4). htt p://arxiv.org/abs/2201.05337.
- Zhang, J., El-Gohary, N., 2016. Automated information transformation for Automated regulatory compliance checking in construction. J. Comput. Civ. Eng. https://doi. org/10.1061/(ASCE)CP.1943-5487.0000427. November. · DOI
- Zhang, S., Fan, R., Liu, Y., Chen, S., Liu, Q., Zeng, W., 2023. Applications of transformer- based language models in bioinformatics: a survey. Bioinform Adv 3 (1), vbad001. https://doi.org/10.1093/bioadv/vbad001. · DOI · Paper page
- Zheng, J., Fischer, M., 2023. BIM-GPT: a prompt-based virtual Assistant framework for BIM information retrieval. arXiv preprint. https://doi.org/10.48550/arXiv.2304. 09333. · DOI
- Zong, M., Krishnamachari, B., 2022. A Survey on GPT-3. ArXiv. http://arxiv.org/abs/22 12.00857.
- Zuo, J., Zillante, G., Coffey, V., 2012. Project culture in the Chinese construction industry: perceptions of contractors. Australasian J. Construct. Econom. Build. 9 (2), 17-28.
Cited by
Sorted by citations
Generative AI design for building structures
Liao, W., Lu, X., Fei, Y., Gu, Y., & Huang, Y. (2024) · Automation in Construction · doi:10.1016/j.autcon.2023.105187 · Cited by 213 · see citing works
Ghimire, P., Kim, K., & Acharya, M. (2024) · Buildings · doi:10.3390/buildings14010220 · Cited by 175 · see citing works
“…For instance, large language models like GPT require fi ne-tuning and contextual input tailored to the construction domain in order to e ffi ciently generate indus-try-speci fi c insights [149]. input tailored to the construction domain in order to efficiently generate industry-specific insights [149].”
Highway Construction Safety Analysis Using Large Language Models
Smetana, M., Salles de Salles, L., Sukharev, I., & Khazanovich, L. (2024) · Applied Sciences · doi:10.3390/app14041352 · Cited by 87 · see citing works
A review of LLMs and their applications in the architecture, engineering and construction industry
Kampelopoulos, D., Tsanousa, A., Vrochidis, S., & Kompatsiaris, I. (2025) · Artificial Intelligence Review · doi:10.1007/s10462-025-11241-7 · Cited by 69 · see citing works
Ontology-enabled AI agent-driven intelligent digital twins for building operations and maintenance
Yoon, S., Song, J., & Li, J. (2025) · Journal of Building Engineering · doi:10.1016/j.jobe.2025.112802 · Cited by 36 · see citing works
A LLM-informed multi-agent AI system for drone-based visual inspection for infrastructure
Liu, J., Li, H., Chai, C., Chen, K., & Wang, D. (2025) · Advanced Engineering Informatics · doi:10.1016/j.aei.2025.103643 · Cited by 32 · see citing works
Generative AI in the Construction Industry: A State-of-the-art Analysis
Taiwo, R., Bello, I. T., Abdulai, S. F., Yussif, A.-M., Salami, B. A., Saka, A., & Zayed, T. (2024) · arXiv · doi:10.48550/arxiv.2402.09939 · Cited by 21 · see citing works
Self-citation
- Authors
- Saka, A., Taiwo, R., Saka, N., Salami, B. A., Ajayi, S., Akande, K., & Kazemi, H.
- Affiliations
- Leeds Beckett University (GB)
- Hong Kong Polytechnic University (HK)
- Cardiff Metropolitan University (GB)
- Corresponding author
- Ajayi, Saheed
- Venue
- Developments in the Built Environment
- Publisher
- Elsevier BV
- Published
- 2024-03
- Volume
- 17
- Pages
- 100300
- ISSN
- 2666-1659 (ISSN-L)
- OpenAlex
- W4389618734
- Cited by
- 202
- References
- 13
- Citations by year
- 2026: 72 · 2025: 84 · 2024: 41 · 2023: 5
- FWCI
- 24.26
- Type
- journal article
- Language
- en
- Open access
- gold
- doi.org
- Licence
- Locations
- Developments in the Built Environment (publishedVersion, cc-by)
- Leeds Beckett Repository (Leeds Beckett University) (acceptedVersion)
- WestminsterResearch (University of Westminster) (acceptedVersion, cc-by)
- arXiv (Cornell University) (submittedVersion, cc-by)
- DOAJ (DOAJ: Directory of Open Access Journals) (submittedVersion)
- Figshare (submittedVersion, cc-by)
- PolyU Institutional Research Archive (Hong Kong Polytechnic University) (submittedVersion, cc-by)
- arXiv (Cornell University) (cc-by)
- Funders
- Leeds Beckett University
- Topics
- Physical Sciences › Engineering › Building and Construction › BIM and Construction Integration
- Physical Sciences › Computer Science › Artificial Intelligence › Artificial Intelligence Applications
- Physical Sciences › Materials Science › Materials Chemistry › Machine Learning in Materials Science
- Keywords
- GPT models, large language models, construction industry, construction project life cycle, material selection, material optimization
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review