Investigating the Use of ChatGPT for the Scheduling of Construction Projects

Open access
Prieto, Samuel A., Mengiste, Eyob T., García de Soto, Borja · 2023 · Buildings

The DOI matches its Crossref record; 30 of the 30 references it cites were found in a registry or an index.

Abstract

Generative Pre-Trained Transformer (GPT) language models such as ChatGPT have the potential to revolutionize the construction industry by automating repetitive and time-consuming tasks. This paper presents a study in which ChatGPT was used to generate a construction schedule for a simple construction project. The output from ChatGPT was evaluated by a pool of participants that provided feedback regarding their overall interaction experience and the quality of the output. The results show that ChatGPT can generate a coherent schedule that follows a logical approach to fulfill the requirements of the scope indicated. The participants had an overall positive interaction experience and indicated the potential of such a tool in automating many preliminary and time-consuming tasks. However, the technology still has limitations, and further development is needed before it can be widely adopted in the industry. Overall, this study highlights the advantages of using large language models and Natural Language Processing (NLP) techniques in the construction industry and the need for further research.

Overview

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.3390/buildings13040857

Cites

30 of 30 references verified0 citation errors · 0 not checkable

Statistics

Figures

Figure 1 Overview of the main steps for using and assessing ChatGPT in this study. Figure 1. Overview of the main steps for using and assessing ChatGPT in this study.
Figure 1 Overview of the main steps for using and assessing ChatGPT in this study. Figure 1. Overview of the main steps for using and assessing ChatGPT in this study.CC-BY · From the PDF
Figure 2 ( a ) General view of the floorplan and ( b ) Gantt chart of main activities used as the baseline for the required scope summarized in Table 2. Figure 2. ( a ) General view of the floorplan and ( b ) Gantt chart of main activities used as the baseline for the required scope summarized in Table 2.
Figure 2 ( a ) General view of the floorplan and ( b ) Gantt chart of main activities used as the baseline for the required scope summarized in Table 2. Figure 2. ( a ) General view of the floorplan and ( b ) Gantt chart of main activities used as the baseline for the required scope summarized in Table 2.CC-BY · From the PDF
Image 3
CC-BY · From the PDF
Figure 3 Deviation between the durations proposed by ChatGPT and the baseline for each task from each participant (P). Figure 3. Deviation between the durations proposed by ChatGPT and the baseline for each task from each participant (P).
Figure 3 Deviation between the durations proposed by ChatGPT and the baseline for each task from each participant (P). Figure 3. Deviation between the durations proposed by ChatGPT and the baseline for each task from each participant (P).CC-BY · From the PDF
Figure 4 Deviation of the needed workers proposed by ChatGPT with respect to the baseline. Figure 4. Deviation of the needed workers proposed by ChatGPT with respect to the baseline.
Figure 4 Deviation of the needed workers proposed by ChatGPT with respect to the baseline. Figure 4. Deviation of the needed workers proposed by ChatGPT with respect to the baseline.CC-BY · From the PDF
Figure 5 Results from the survey regarding the evaluation of the ChatGPT output. Figure 5. Results from the survey regarding the evaluation of the ChatGPT output. Figure 5. Results from the survey regarding the evaluation of the ChatGPT output.
Figure 5 Results from the survey regarding the evaluation of the ChatGPT output. Figure 5. Results from the survey regarding the evaluation of the ChatGPT output. Figure 5. Results from the survey regarding the evaluation of the ChatGPT output.CC-BY · From the PDF
Figure 6 Results from the survey regarding the evaluation of the interaction with ChatGPT. Figure 6. Results from the survey regarding the evaluation of the interaction with ChatGPT. Figure 6. Results from the survey regarding the evaluation of the interaction with ChatGPT.
Figure 6 Results from the survey regarding the evaluation of the interaction with ChatGPT. Figure 6. Results from the survey regarding the evaluation of the interaction with ChatGPT. Figure 6. Results from the survey regarding the evaluation of the interaction with ChatGPT.CC-BY · From the PDF
Figure A1. Cont .
Figure A1. Cont .CC-BY · From the PDF
Image 9
CC-BY · From the PDF
Figure A1. Extracts of the ChatGPT interface with the prompts regarding ( a ) the initial instruction and the scope of work, ( b ) the request to detail tasks in a given format, and ( c ) displaying the proposed schedule in a table. Figure A1. Extracts of the ChatGPT interface with the prompts regarding ( a ) the initial instruction and the scope of work, ( b ) the request to detail tasks in a given format, and ( c ) displaying the proposed schedule in a table.
Figure A1. Extracts of the ChatGPT interface with the prompts regarding ( a ) the initial instruction and the scope of work, ( b ) the request to detail tasks in a given format, and ( c ) displaying the proposed schedule in a table. Figure A1. Extracts of the ChatGPT interface with the prompts regarding ( a ) the initial instruction and the scope of work, ( b ) the request to detail tasks in a given format, and ( c ) displaying the proposed schedule in a table.CC-BY · From the PDF

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Claims other papers make about this one

Each is checked against this paper’s own text: does it say what the citing paper says it does?

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cites

Show all 30 references

Research works printed but not linked: 1

  1. Jung, Y., Fouad, A., and Golparvar-Fard, M. (2021, January 11–15). A systematic review on the requirements on BIM maturity and formal representation of sequencing knowledge for automated construction scheduling. Proceedings of the 38th International Conference of CIB, Luxembourg. Available online: https://itc.scix.net/paper/w78-2021-paper-043.

Cited by

See all 275

Metadata

Authors
Prieto, S. A., Mengiste, E. T., & García de Soto, B.
Affiliations
  • New York University Abu Dhabi (AE)
  • S.M.A.R.T. Construction Research Group, Division of Engineering, New York University Abu Dhabi (NYUAD), Experimental Research Building, Saadiyat Island, Abu Dhabi P.O. Box 129188, United Arab Emirates
Corresponding author
Prieto, Samuel A.
Venue
Buildings
Publisher
MDPI AG
Published
2023-03-24
Volume
13
Issue
4
Pages
857
ISSN
2075-5309 (ISSN-L)
OpenAlex
W4360847209
Cited by
229
References
24
Citations by year
2026: 50 · 2025: 71 · 2024: 72 · 2023: 36
FWCI
27.50
Type
journal article
Language
en
Open access
Locations
  • Buildings (publishedVersion, cc-by)
  • arXiv (Cornell University) (submittedVersion, cc-by-nc-nd)
  • DOAJ (DOAJ: Directory of Open Access Journals) (submittedVersion, cc-by-sa)
  • arXiv (Cornell University)
Funders
  • New York University Abu Dhabi (G1104, CG001)
  • York University
  • Tamkeen (CG001, G1104)
Topics
  • Physical Sciences › Engineering › Building and Construction › BIM and Construction Integration
  • Physical Sciences › Computer Science › Artificial Intelligence › Artificial Intelligence Applications
  • Social Sciences › Decision Sciences › Management Science and Operations Research › Construction Project Management and Performance
Keywords
ChatGPT, large language models, construction scheduling, schedule generation, user evaluation, interaction experience, output quality

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Investigating the Use of ChatGPT for the Scheduling of Construction Projects. https://app.cochat.ai/papers/10.3390/buildings13040857
The paper
Prieto, S. A., Mengiste, E. T., & García de Soto, B. (2023). Investigating the Use of ChatGPT for the Scheduling of Construction Projects. Buildings. https://doi.org/10.3390/buildings13040857

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.