The DOI matches its Crossref record; 27 of the 27 references it cites were found in a registry or an index.
A simulation-based risk network model for decision support in project risk management
Open accessOverview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Statistical Methods for Rates and Proportions
Fleiss, J. L., Levin, B., & Paik, M. C. (2003) · Wiley Series in Probability and Statistics · doi:10.1002/0471445428 · Cited by 18,646
Statistical Methods for Rates and Proportions.
Everitt, B. S., & Fleiss, J. L. (1981) · Biometrics · doi:10.2307/2530193 · Cited by 8,990
Engineering Design: A Systematic Approach
(1963) · Students Quarterly Journal · doi:10.1049/sqj.1963.0055 · Cited by 4,100
Discrete-Event System Simulation
Morgan, C. B. (1984) · Technometrics · doi:10.1080/00401706.1984.10487955 · Cited by 3,593
Project management : a systems approach to planning, scheduling, and controlling
Kerzner, H. (1995) · Thammasat University Digital Collections · Cited by 3,099
Project management: A systems approach to planning, scheduling and controlling
Botter, C. H. (1982) · European Journal of Operational Research · doi:10.1016/0377-2217(82)90164-3 · Cited by 2,408
Engineering design — A systematic approach
Edwards, K. L. (1995) · Materials & Design · doi:10.1016/0261-3069(96)84970-3 · Cited by 2,130
The design structure system: A method for managing the design of complex systems
Steward, D. V. (1981) · IEEE Transactions on Engineering Management · doi:10.1109/tem.1981.6448589 · Cited by 1,749
Decision-making with the AHP: Why is the principal eigenvector necessary
Saaty, T. L. (2002) · European Journal of Operational Research · doi:10.1016/s0377-2217(02)00227-8 · Cited by 1,659
Browning, T. R. (2001) · IEEE Transactions on Engineering Management · doi:10.1109/17.946528 · Cited by 1,618
Cited by
Towards a better modelling and assessment of construction risk: Insights from a literature review
Taroun, A. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.03.004 · Cited by 387
Design Structure Matrix Extensions and Innovations: A Survey and New Opportunities
Browning, T. R. (2016) · IEEE Transactions on Engineering Management · doi:10.1109/tem.2015.2491283 · Cited by 337
Afzal, F., Yunfei, S., Nazir, M., & Bhatti, S. M. (2021) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-02-2019-0047 · Cited by 172
Metadata
- Authors
- Fang, C., & Marle, F.
- Venue
- Decision Support Systems
- Publisher
- Elsevier BV
- Published
- 2012-02
- Volume
- 52
- Issue
- 3
- Pages
- 635-644
- ISSN
- 0167-9236 (ISSN-L)
- OpenAlex
- W2027406005
- Cited by
- 268
- References
- 27
- FWCI
- 17.34
- Type
- journal article
- Language
- en
- Open access
- green
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: A simulation-based risk network model for decision support in project risk management. https://app.cochat.ai/papers/10.1016/j.dss.2011.10.021
- The paper
- Fang, C., & Marle, F. (2012). A simulation-based risk network model for decision support in project risk management. Decision Support Systems. https://doi.org/10.1016/j.dss.2011.10.021
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.