Towards a better modelling and assessment of construction risk: Insights from a literature review
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
The literature still does not contain references that use data obtained in a qualitative analysis (probability and impact of each identified risk) to perform a quantitative risk analysis integrated into the project model.
“Although Monte Carlo simulation is widely used in project risk assessments (Tong et al. 2018;Taroun, 2014), as far as we know, the literature still does not contain references that use the data obtained in a qualitative analysis (data related to the probability and impact of each identified risk) to perform a quantitative risk analysis integrated into the project model.”
From Beyond probability-impact matrices in project risk management: A quantitative methodology for risk prioritisation (2024) · cites this paper as Taroun, 2014
Citations
Cites
No references could be resolved yet.
Research works printed but not linked: 96
- Ackermann, 2007, Systemic risk assessment: a case study, Journal of the Operational Research Society, 58, 39, 10.1057/palgrave.jors.2602105 · DOI
- Akintoye, 1997, Risk analysis and management in construction, International Journal of Project Management, 15, 31, 10.1016/S0263-7863(96)00035-X · DOI
- Al Bahar, 1990, Systematic risk management approach for construction projects, Journal of Construction Engineering and Management, 116, 533, 10.1061/(ASCE)0733-9364(1990)116:3(533) · DOI
- Aven, 2007, A decision framework for risk management, with application to the offshore oil and gas industry, Reliability Engineering and System Safety, 92, 433, 10.1016/j.ress.2005.12.009 · DOI
- Baccarini, 2001, The risk ranking of projects: a methodology, International Journal of Project Management, 19, 139, 10.1016/S0263-7863(99)00074-5 · DOI
- Baker, 1998, Techniques for the analysis of risks in major projects, Journal of the Operational Research Society, 49, 567, 10.1057/palgrave.jors.2600548 · DOI
- Baker, 1999, Risk response techniques employed currently for major projects, Construction Management and Economics, 17, 205, 10.1080/014461999371709 · DOI
- Baker, 1999, Survey of risk management in major UK companies, Journal of Professional Issues in Engineering Education and Practice, 125, 94, 10.1061/(ASCE)1052-3928(1999)125:3(94) · DOI
- Baloi, 2003, Modelling global risk factors affecting construction cost performance, International Journal of Project Management, 21, 261, 10.1016/S0263-7863(02)00017-0 · DOI
- Barnes, 1983, How to allocate risks in construction contracts, International Journal of Project Management, 1, 24, 10.1016/0263-7863(83)90034-0 · DOI
- Beeston, 1986, Combining risks in estimating, Construction Management and Economics, 4, 75, 10.1080/01446198600000005 · DOI
- Ben-David, 2001, An integrated approach for risk response development in project planning, Journal of the Operational Research Society, 14–25
- Cagno, 2007, A multi-dimensional analysis of major risks in complex projects, Risk Management, 9, 1, 10.1057/palgrave.rm.8250014 · DOI
- Carr, 1977, Paying the price for construction risk, Journal of the Construction Division, 103, 153, 10.1061/JCCEAZ.0000663 · DOI
- Cervone, 2006, Project risk management, OCLC Systems and Services, 22, 256, 10.1108/10650750610706970 · DOI
- Chan, 2008, Relationship between organizational sizes and contractors' risk pricing behaviors for weather risk under different project values and durations, Journal of Construction Engineering and Management, 134, 673, 10.1061/(ASCE)0733-9364(2008)134:9(673) · DOI
- Chapman, 1983, Risk engineering: basic controlled interval and memory models, Journal of the Operational Research Society, 51–60
- Chapman, 2000, Estimation and evaluation of uncertainty: a minimalist first pass approach, International Journal of Project Management, 18, 369, 10.1016/S0263-7863(00)00016-8 · DOI
- Choi, 2004, Risk assessment methodology for underground construction projects, Journal of Construction Engineering and Management, 130, 258, 10.1061/(ASCE)0733-9364(2004)130:2(258) · DOI
- Cioffi, 2009, A practical method of determining project risk contingency budgets, Journal of the Operational Research Society, 60, 565, 10.1057/palgrave.jors.2602586 · DOI
- Clark, 1987, The development of computer software for risk analysis: a decision support system development case study, European Journal of Operational Research, 29, 252, 10.1016/0377-2217(87)90239-6 · DOI
- Cooper, 1985, Risk analysis of a construction cost estimate, International Journal of Project Management, 3, 141, 10.1016/0263-7863(85)90065-1 · DOI
- Dawood, 1998, Estimating project and activity duration: a risk management approach using network analysis, Construction Management and Economics, 16, 41, 10.1080/014461998372574 · DOI
- Dey, 2001, Decision support system for risk management: a case study, Management Decision, 39, 634, 10.1108/00251740110399558 · DOI
- Dey, 1994, Planning for project control through risk analysis: a petroleum pipeline-laying project, International Journal of Project Management, 12, 23, 10.1016/0263-7863(94)90006-X · DOI
- Diekmann, 1983, Probabilistic estimating: mathematics and applications, Journal of Construction Engineering and Management, 109, 297, 10.1061/(ASCE)0733-9364(1983)109:3(297) · DOI
- Diekmann, 1992, Risk analysis: lessons from artificial intelligence, International Journal of Project Management, 10, 75, 10.1016/0263-7863(92)90059-I · DOI
- Dikmen, 2006, An analytic hierarchy process based model for risk and opportunity assessment of international construction projects, Canadian Journal of Civil Engineering, 33, 58, 10.1139/l05-087 · DOI
- Dikmen, 2004, A critical review of risk management support tools, 1145
- Dikmen, 2007, A case-based decision support tool for bid mark-up estimation of international construction projects, Automation in Construction, 17, 30, 10.1016/j.autcon.2007.02.009 · DOI
- Dikmen, 2007, Using fuzzy risk assessment to rate cost overrun risk in international construction projects, International Journal of Project Management, 25, 494, 10.1016/j.ijproman.2006.12.002 · DOI
- Dikmen, 2007, Project appraisal and selection using the analytic network process, Canadian Journal of Civil Engineering, 34, 786, 10.1139/l07-006 · DOI
- Edwards, 1998, Risk and risk management in construction: a review and future directions for research, Engineering Construction and Architectural Management, 5, 339, 10.1108/eb021087 · DOI
- Fan, 2004, BBN-based software project risk management, Journal of Systems and Software, 73, 193, 10.1016/j.jss.2003.12.032 · DOI
- Fang, 2012, A simulation-based risk network model for decision support in project risk management, Decision Support Systems, 52, 635, 10.1016/j.dss.2011.10.021 · DOI
- Franke, 1987, Risk analysis in project management, International Journal of Project Management, 5, 29, 10.1016/0263-7863(87)90007-X · DOI
- Friedman, 1956, A competitive-bidding strategy, Operations Research, 4, 104, 10.1287/opre.4.1.104 · DOI
- Fung, 2010, Developing a Risk Assessment Model for construction safety, International Journal of Project Management, 28, 593, 10.1016/j.ijproman.2009.09.006 · DOI
- Gates, 1960, Statistical and economic analysis of a bidding trend, Journal of the Construction Division, ASCE, 75
- Gates, 1967, Bidding strategies and probabilities, Journal of the Construction Division, ASCE, 93, 74
- Gates, 1971, Bidding contingencies and probabilities, Journal of the Construction Division, ASCE, 97, 277, 10.1061/JCCEAZ.0000312 · DOI
- Gates, 1974, Reward–risk ratio, Journal of the Construction Division, ASCE, 100, 521, 10.1061/JCCEAZ.0000455 · DOI
- Han, 2008, A web-based integrated system for international project risk management, Automation in Construction, 17, 342, 10.1016/j.autcon.2007.05.012 · DOI
- Hashemi, 2011, Bootstrap technique for risk analysis with interval numbers in bridge construction projects, Journal of Construction Engineering and Management, 137, 600, 10.1061/(ASCE)CO.1943-7862.0000344 · DOI
- Hastak, 2000, ICRAM-1: model for international construction risk assessment, Journal of Management in Engineering, 16, 59, 10.1061/(ASCE)0742-597X(2000)16:1(59) · DOI
- Hertz, 1964, Risk analysis in capital investment, Harvard Business Review, 42, 95
- Hsueh, 2007, On-line multi-criterion risk assessment model for construction joint ventures in China, Automation in Construction, 16, 607, 10.1016/j.autcon.2007.01.001 · DOI
- Hull, 1990, Application of risk analysis techniques in proposal assessment, International Journal of Project Management, 8, 152, 10.1016/0263-7863(90)90016-5 · DOI
- Huseby, 1992, Dynamic risk analysis: the DynRisk concept, International Journal of Project Management, 10, 160, 10.1016/0263-7863(92)90005-T · DOI
- Jannadi, 2003, Risk assessment in construction, Journal of Construction Engineering and Management, 129, 492, 10.1061/(ASCE)0733-9364(2003)129:5(492) · DOI
- Kangari, 1989, Construction risk assessment by linguistics, IEEE Transactions on Engineering Management, 36, 126, 10.1109/17.18829 · DOI
- Larsson, 2002, The distribution of occupational injury risks in the Victorian construction industry, Safety Science, 40, 439, 10.1016/S0925-7535(01)00015-7 · DOI
- Laryea, 2008, How contractors price risk in bids: theory and practice, Construction Management and Economics, 26, 911, 10.1080/01446190802317718 · DOI
- Lazzerini, 2011, Analyzing risk impact factors using extended fuzzy cognitive maps, IEEE Systems Journal, 5, 288, 10.1109/JSYST.2011.2134730 · DOI
- Liu, 2002, Review of uncertainty reasoning approaches as guidance for maritime and offshore safety-based assessment, Journal of United Kingdom Safety and Reliability Society, 23, 63, 10.1080/09617353.2002.11690751 · DOI
- Luu, 2009, Quantifying schedule risk in construction projects using Bayesian belief networks, International Journal of Project Management, 27, 39, 10.1016/j.ijproman.2008.03.003 · DOI
- Lyons, 2004, Project risk management in the Queensland engineering construction industry: a survey, International Journal of Project Management, 22, 51, 10.1016/S0263-7863(03)00005-X · DOI
- Marle, 2011, Project risk management processes: improving coordination using a clustering approach, Research in Engineering Design, 22, 189, 10.1007/s00163-011-0106-9 · DOI
- Mojtahedi, 2010, Project risk identification and assessment simultaneously using multi-attribute group decision making technique, Safety Science, 48, 499, 10.1016/j.ssci.2009.12.016 · DOI
- Molenaar, 2005, Programmatic cost risk analysis for highway megaprojects, Journal of Construction Engineering and Management, 131, 343, 10.1061/(ASCE)0733-9364(2005)131:3(343) · DOI
- Morin, 1969, OPBID: competitive bidding strategy model, Journal of the Construction Division, 95, 85, 10.1061/JCCEAZ.0000262 · DOI
- Mulholland, 1999, Risk assessment in construction schedules, Journal of Construction Engineering and Management, 125, 8, 10.1061/(ASCE)0733-9364(1999)125:1(8) · DOI
- Mustafa, 1991, Project risk assessment using the analytic hierarchy process, IEEE Transactions on Engineering Management, 38, 46, 10.1109/17.65759 · DOI
- Nieto-Morote, 2011, A fuzzy approach to construction project risk assessment, International Journal of Project Management, 29, 220, 10.1016/j.ijproman.2010.02.002 · DOI
- Paek, 1993, Pricing construction risks: fuzzy set theory, Journal of Construction Engineering and Management, 119, 743, 10.1061/(ASCE)0733-9364(1993)119:4(743) · DOI
- Patterson, 2002, A risk register database system to aid the management of project risk, International Journal of Project Management, 20, 365, 10.1016/S0263-7863(01)00040-0 · DOI
- Poh, 2006, Integrated duration–cost influence network for modelling risk impacts on construction tasks, Construction Management & Economics, 24, 861, 10.1080/01446190600658891 · DOI
- Raz, 2001, Use and benefits of tools for project risk management, International Journal of Project Management, 19, 9, 10.1016/S0263-7863(99)00036-8 · DOI
- Riggs, 1994, Integration of technical, cost, and schedule risks in project management, Computers and Operations Research, 21, 521, 10.1016/0305-0548(94)90101-5 · DOI
- Shang, 2005, An intelligent risk assessment system for distributed construction teams, Engineering Construction and Architectural Management, 12, 391, 10.1108/09699980510608839 · DOI
- Shen, 1997, Project risk management in Hong Kong, International Journal of Project Management, 15, 101, 10.1016/S0263-7863(96)00045-2 · DOI
- Simister, 1994, Usage and benefits of project risk analysis and management, International Journal of Project Management, 12, 5, 10.1016/0263-7863(94)90003-5 · DOI
- Spooner, 1974, Probabilistic estimating, Journal of the Construction Division, 100, 65, 10.1061/JCCEAZ.0000411 · DOI
- Tah, 2000, A proposal for construction project risk assessment using fuzzy logic, Construction Management and Economics, 18, 491, 10.1080/01446190050024905 · DOI
- Tah, 2001, Knowledge-based approach to construction project risk management, Journal of Computing in Civil Engineering, 15, 170, 10.1061/(ASCE)0887-3801(2001)15:3(170) · DOI
- Tah, 1993, Contractor project risks contingency allocation using linguistic approximation, Computing Systems in Engineering, 4, 281, 10.1016/0956-0521(93)90052-X · DOI
- Tah, 1994, A survey of indirect cost estimating in practice, Construction Management and Economics, 12, 31, 10.1080/01446199400000004 · DOI
- Thomas, 2006, Modelling and assessment of critical risks in BOT road projects, Construction Management and Economics, 24, 407, 10.1080/01446190500435275 · DOI
- Uher, 1999, Risk management in the conceptual phase of a project, International Journal of Project Management, 17, 161, 10.1016/S0263-7863(98)00024-6 · DOI
- Vidal, 2012, A systems thinking approach for project vulnerability management, Kybernetes, 41, 206, 10.1108/03684921211213043 · DOI
- Ward, 1999, Assessing and managing important risks, International Journal of Project Management, 17, 331, 10.1016/S0263-7863(98)00051-9 · DOI
- Ward, 2003, Transforming project risk management into project uncertainty management, International Journal of Project Management, 21, 97, 10.1016/S0263-7863(01)00080-1 · DOI
- Warszawski, 2004, Practical multifactor approach to evaluating risk of investment in engineering projects, Journal of Construction Engineering and Management, 130, 357, 10.1061/(ASCE)0733-9364(2004)130:3(357) · DOI
- Williams, 1993, Risk-management infrastructures, International Journal of Project Management, 11, 5, 10.1016/0263-7863(93)90003-6 · DOI
- Williams, 1995, A classified bibliography of recent research relating to project risk management, European Journal of Operational Research, 85, 18, 10.1016/0377-2217(93)E0363-3 · DOI
- Williams, 1996, The two-dimensionality of project risk, International Journal of Project Management, 14, 185, 10.1016/0263-7863(96)00030-0 · DOI
- Wirba, 1996, Risk interdependencies and natural language computations, Engineering Construction and Architectural Management, 3, 251, 10.1108/eb021034 · DOI
- Wood, 2003, Risk management practices of leading UK cost consultants, Engineering Construction and Architectural Management, 10, 254, 10.1108/09699980310489960 · DOI
- Xu, 2001, Risk assessment on contractors' pricing strategies, Construction Management and Economics, 19, 77, 10.1080/01446190010002561 · DOI
- Yeo, 1990, Risks, classification of estimates, and contingency management, Journal of Management in Engineering, 6, 458, 10.1061/(ASCE)9742-597X(1990)6:4(458) · DOI
- Zayed, 2008, Assessing risk and uncertainty inherent in Chinese highway projects using AHP, International Journal of Project Management, 26, 408, 10.1016/j.ijproman.2007.05.012 · DOI
- Zeng, 2007, Application of a fuzzy based decision making methodology to construction project risk assessment, International Journal of Project Management, 25, 589, 10.1016/j.ijproman.2007.02.006 · DOI
- Zhang, 2007, A redefinition of the project risk process: using vulnerability to open up the event-consequence link, International Journal of Project Management, 25, 694, 10.1016/j.ijproman.2007.02.004 · DOI
- Zhang, 2007, Fuzzy analytical hierarchy process risk assessment approach for joint venture construction projects in China, Journal of Construction Engineering and Management, 133, 771, 10.1061/(ASCE)0733-9364(2007)133:10(771) · DOI
- Zhi, 1995, Risk management for overseas construction projects, International Journal of Project Management, 13, 231, 10.1016/0263-7863(95)00015-I · DOI
- Zou, 2007, Understanding the key risks in construction projects in China, International Journal of Project Management, 25, 601, 10.1016/j.ijproman.2007.03.001 · DOI
Cited by
Sorted by citations
Afzal, F., Yunfei, S., Nazir, M., & Bhatti, S. M. (2021) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-02-2019-0047 · Cited by 172
Islam, M. S., Nepal, M. P., Skitmore, M., & Attarzadeh, M. (2017) · Advanced Engineering Informatics · doi:10.1016/j.aei.2017.06.001 · Cited by 163
Acebes, F., González-Varona, J. M., López-Paredes, A., & Pajares, J. (2024) · Humanities and Social Sciences Communications · doi:10.1057/s41599-024-03180-5 · Cited by 74
Ashtari, M. A., Ansari, R., Hassannayebi, E., & Jeong, J. (2022) · Buildings · doi:10.3390/buildings12101660 · Cited by 65
Islam, M. S., Nepal, M. P., & Skitmore, M. (2019) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001593 · Cited by 60
Metadata
- Authors
- Taroun, A.
- Affiliations
- University of Bedfordshire (GB)
- Corresponding author
- Taroun, Abdulmaten
- Venue
- International Journal of Project Management
- Publisher
- Elsevier BV
- Published
- 2014-01
- Volume
- 32
- Issue
- 1
- Pages
- 101-115
- ISSN
- 0263-7863 (ISSN-L)
- OpenAlex
- W2043898642
- Cited by
- 387
- References
- 0
- Citations by year
- 2026: 29 · 2025: 20 · 2024: 36 · 2023: 30 · 2022: 46 · 2021: 44 · 2020: 38 · 2019: 40 · 2018: 27 · 2017: 22 · 2016: 22 · 2015: 22 · 2014: 11
- FWCI
- 23.43
- Type
- journal article
- Language
- en
- Open access
- closed
- Locations
- International Journal of Project Management (publishedVersion)
- Worcester Research and Publications (University of Worcester) (submittedVersion)
- Topics
- Social Sciences › Decision Sciences › Management Science and Operations Research › Construction Project Management and Performance
- Social Sciences › Economics, Econometrics and Finance › Finance › Capital Investment and Risk Analysis
- Physical Sciences › Engineering › Building and Construction › BIM and Construction Integration
- Keywords
- construction risk, risk assessment, risk modeling, probability-impact matrix, risk perception, risk aggregation, risk cost, project objectives, professional experience, construction projects
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review