The DOI matches its Crossref record; 16 of the 16 references it cites were found in a registry or an index.
Intermittent demand: Linking forecasting to inventory obsolescence
Open accessAbstract
The standard method to forecast intermittent demand is that by Croston. This method is available in ERP-type solutions such as SAP and specialised forecasting software packages (e.g. Forecast Pro), and often applied in practice. It uses exponential smoothing to separately update the estimated demand size and demand interval whenever a positive demand occurs, and their ratio provides the forecast of demand per period. The Croston method has two important disadvantages. First and foremost, not updating after (many) periods with zero demand renders the method unsuitable for dealing with obsolescence issues. Second, the method is positively biased and this is true for all points in time (i.e. considering the forecasts made at an arbitrary time period) and issue points only (i.e. considering the forecasts following a positive demand occurrence only). The second issue has been addressed in the literature by the proposal of an estimator (Syntetos–Boylan Approximation, SBA) that is approximately unbiased. In this paper, we propose a new method that overcomes both these shortcomings while not adding complexity. Different from the Croston method, the new method is unbiased (for all points in time) and it updates the demand probability instead of the demand interval, doing so in every period. The comparative merits of the new estimator are assessed by means of an extensive simulation experiment. The results indicate its superior performance and enable insights to be gained into the linkage between demand forecasting and obsolescence.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Forecasting and Stock Control for Intermittent Demands
Croston, J. D. (1972) · Journal of the Operational Research Society · doi:10.1057/jors.1972.50 · Cited by 753
The accuracy of intermittent demand estimates
Syntetos, A. A., & Boylan, J. E. (2005) · International Journal of Forecasting · doi:10.1016/j.ijforecast.2004.10.001 · Cited by 489
Self-citationOn the categorization of demand patterns
Syntetos, A. A., Boylan, J. E., & Croston, J. D. (2005) · Journal of the Operational Research Society · doi:10.1057/palgrave.jors.2601841 · Cited by 425
Self-citationA new approach to forecasting intermittent demand for service parts inventories
Willemain, T. R., Smart, C. N., & Schwarz, H. F. (2004) · International Journal of Forecasting · doi:10.1016/s0169-2070(03)00013-x · Cited by 394
On the bias of intermittent demand estimates
Syntetos, A. A., & Boylan, J. E. (2001) · International Journal of Production Economics · doi:10.1016/s0925-5273(00)00143-2 · Cited by 362
Self-citationForecasting and operational research: a review
Fildes, R., Nikolopoulos, K., Crone, S. F., & Syntetos, A. A. (2008) · Journal of the Operational Research Society · doi:10.1057/palgrave.jors.2602597 · Cited by 287
Self-citationForecasting intermittent demand in manufacturing: a comparative evaluation of Croston's method
Willemain, T. R., Smart, C. N., Shockor, J. H., & DeSautels, P. A. (1994) · International Journal of Forecasting · doi:10.1016/0169-2070(94)90021-3 · Cited by 237
Ghobbar, A. A., & Friend, C. H. (2003) · Computers & Operations Research · doi:10.1016/s0305-0548(02)00125-9 · Cited by 235
Lumpy demand forecasting using neural networks
Gutierrez, R. S., Solis, A. O., & Mukhopadhyay, S. (2007) · International Journal of Production Economics · doi:10.1016/j.ijpe.2007.01.007 · Cited by 235
Forecasting for the ordering and stock-holding of spare parts
Eaves, A. H. C., & Kingsman, B. G. (2004) · Journal of the Operational Research Society · doi:10.1057/palgrave.jors.2601697 · Cited by 214
Cited by
Forecasting: theory and practice
Petropoulos, F., Apiletti, D., Assimakopoulos, V., Babai, M. Z., Barrow, D. K., Ben Taieb, S., Bergmeir, C., Bessa, R. J., Bijak, J., Boylan, J. E., et al. (2022) · International Journal of Forecasting · doi:10.1016/j.ijforecast.2021.11.001 · Cited by 921
Self-citationM5 accuracy competition: Results, findings, and conclusions
Makridakis, S., Spiliotis, E., & Assimakopoulos, V. (2022) · International Journal of Forecasting · doi:10.1016/j.ijforecast.2021.11.013 · Cited by 554
Retail forecasting: Research and practice
Fildes, R., Ma, S., & Kolassa, S. (2022) · International Journal of Forecasting · doi:10.1016/j.ijforecast.2019.06.004 · Cited by 346
Unconstraining methods for revenue management systems under small demand
Kourentzes, N., Li, D., & Strauss, A. K. (2019) · Journal of Revenue and Pricing Management · doi:10.1057/s41272-017-0117-x · Cited by 9
Metadata
- Authors
- Teunter, R. H., Syntetos, A. A., & Zied Babai, M.
- Venue
- European Journal of Operational Research
- Publisher
- Elsevier BV
- Published
- 2011-11
- Volume
- 214
- Issue
- 3
- Pages
- 606-615
- ISSN
- 0377-2217 (ISSN-L)
- OpenAlex
- W2101906966
- Cited by
- 252
- References
- 16
- FWCI
- 10.40
- Type
- journal article
- Language
- en
- Open access
- hybrid
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Intermittent demand: Linking forecasting to inventory obsolescence. https://app.cochat.ai/papers/10.1016/j.ejor.2011.05.018
- The paper
- Teunter, R. H., Syntetos, A. A., & Zied Babai, M. (2011). Intermittent demand: Linking forecasting to inventory obsolescence. European Journal of Operational Research. https://doi.org/10.1016/j.ejor.2011.05.018
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.