The DOI matches its Crossref record; 25 of the 25 references it cites were found in a registry or an index.
Green scheduling of a two-machine flowshop: Trade-off between makespan and energy consumption
Open accessAbstract
Sustainability considerations in manufacturing scheduling, which is traditionally influenced by service oriented performance metrics, have rarely been adopted in the literature. This paper aims to address this gap by incorporating energy consumption as an explicit criterion in shop floor scheduling. Leveraging the variable speed of machining operations leading to different energy consumption levels, we explore the potential for energy saving in manufacturing. We analyze the trade-off between minimizing makespan, a measure of service level and total energy consumption, an indicator for environmental sustainability of a two-machine sequence dependent permutation flowshop. We develop a mixed integer linear multi-objective optimization model to find the Pareto frontier comprised of makespan and total energy consumption. To cope with combinatorial complexity, we also develop a constructive heuristic for fast trade-off analysis between makespan and energy consumption. We define lower bounds for the two objectives under some non-restrictive conditions and compare the performance of the constructive heuristic with CPLEX through design of experiments. The lower bounds that we develop are valid under realistic assumptions since they are conditional on speed factors. The Pareto frontier includes solutions ranging from expedited, energy intensive schedules to prolonged, energy efficient schedules. It can serve as a visual aid for production and sales planners to consider energy consumption explicitly in making quick decisions while negotiating with customers on due dates. We provide managerial insights by analyzing the areas along the Pareto frontier where energy saving can be justified at the expense of reduced service level and vice versa.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Faul, F., Erdfelder, E., Lang, A.-G., & Buchner, A. (2007) · Behavior Research Methods · doi:10.3758/bf03193146 · Cited by 65,971
Scheduling: Theory, Algorithms, and Systems
(1996) · IIE Transactions · doi:10.1080/15458830.1996.11770714 · Cited by 6,210
Cohen, J. (1992) · Current Directions in Psychological Science · doi:10.1111/1467-8721.ep10768783 · Cited by 5,870
Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
Graham, R. L., Lawler, E. L., Lenstra, J. K., & Kan, A. H. G. R. (1979) · Annals of Discrete Mathematics · doi:10.1016/s0167-5060(08)70356-x · Cited by 5,854
Optimal two‐ and three‐stage production schedules with setup times included
Johnson, S. M. (1954) · Naval Research Logistics Quarterly · doi:10.1002/nav.3800010110 · Cited by 3,252
A survey of scheduling problems with setup times or costs
Allahverdi, A., Ng, C. T., Cheng, T. C. E., & Kovalyov, M. Y. (2006) · European Journal of Operational Research · doi:10.1016/j.ejor.2006.06.060 · Cited by 1,398
Towards energy and resource efficient manufacturing: A processes and systems approach
Duflou, J. R., Sutherland, J. W., Dornfeld, D., Herrmann, C., Jeswiet, J., Kara, S., Hauschild, M., & Kellens, K. (2012) · CIRP Annals · doi:10.1016/j.cirp.2012.05.002 · Cited by 1,164
Some efficient heuristic methods for the flow shop sequencing problem
Taillard, É. D. (1990) · European Journal of Operational Research · doi:10.1016/0377-2217(90)90090-x · Cited by 869
Operational methods for minimization of energy consumption of manufacturing equipment
Mouzon, G., Yildirim, M. B., & Twomey, J. (2007) · International Journal of Production Research · doi:10.1080/00207540701450013 · Cited by 597
Tracking Industrial Energy Efficiency and CO2 Emissions
International Energy Agency (2007) · OECD eBooks · doi:10.1787/9789264030404-en · Cited by 553
A new approach to scheduling in manufacturing for power consumption and carbon footprint reduction
Fang, K., Uhan, N., Zhao, F., & Sutherland, J. W. (2011) · Journal of Manufacturing Systems · doi:10.1016/j.jmsy.2011.08.004 · Cited by 552
The bi-objective Pollution-Routing Problem
Demir, E., Bektaş, T., & Laporte, G. (2014) · European Journal of Operational Research · doi:10.1016/j.ejor.2013.08.002 · Cited by 460
Hybrid flow shop scheduling considering machine electricity consumption cost
Luo, H., Du, B., Huang, G. Q., Chen, H., & Li, X. (2013) · International Journal of Production Economics · doi:10.1016/j.ijpe.2013.01.028 · Cited by 381
Analysis of Travel Times and CO 2 Emissions in Time‐Dependent Vehicle Routing
Jabali, O., VanWoensel, T., & de Kok, A. G. (2012) · Production and Operations Management · doi:10.1111/j.1937-5956.2012.01338.x · Cited by 332
A framework to minimise total energy consumption and total tardiness on a single machine
Mouzon, G., & Yildirim, M. B. (2008) · International Journal of Sustainable Engineering · doi:10.1080/19397030802257236 · Cited by 315
Energy Consumption Characterization and Reduction Strategies for Milling Machine Tool Use
Diaz, N., Redelsheimer, E., & Dornfeld, D. (2011) · Glocalized Solutions for Sustainability in Manufacturing · doi:10.1007/978-3-642-19692-8_46 · Cited by 290
Minimizing fuel emissions by optimizing vessel schedules in liner shipping with uncertain port times
Qi, X., & Song, D.-P. (2012) · Transportation Research Part E: Logistics and Transportation Review · doi:10.1016/j.tre.2012.02.001 · Cited by 284
A critical survey of performance indices for multi-objective optimisation
Okabe, T., Jin, Y., & Sendhoff, B. (2004) · The 2003 Congress on Evolutionary Computation, 2003. CEC '03. · doi:10.1109/cec.2003.1299759 · Cited by 278
Optimal Production Planning with Emissions Trading
Gong, X., & Zhou, S. X. (2013) · Operations Research · doi:10.1287/opre.2013.1189 · Cited by 276
Carbon-efficient scheduling of flow shops by multi-objective optimization
Ding, J.-Y., Song, S., & Wu, C. (2016) · European Journal of Operational Research · doi:10.1016/j.ejor.2015.05.019 · Cited by 264
Yenisey, M. M., & Yağmahan, B. (2013) · Omega · doi:10.1016/j.omega.2013.07.004 · Cited by 230
Digest of United Kingdom Energy Statistics
Strategy, I. (2021) · Cited by 173
Modelling and Tactics for Sustainable Manufacturing: An Improvement Methodology
Despeisse, M., Ball, P. D., & Evans, S. (2012) · Springer eBooks · doi:10.1007/978-3-642-27290-5_2 · Cited by 35
Enterprise Information Systems Design, Implementation and Management: Organizational Applications
Cruz-Cunha, M. M., & Varajão, J. E. (2010) · Advances in business information systems and analytics book series · doi:10.4018/978-1-61692-020-3 · Cited by 16
Cited by
Opportunities and challenges in sustainable supply chain: An operations research perspective
Barbosa-Póvoa, A. P., da Silva, C., & Carvalho, A. (2018) · European Journal of Operational Research · doi:10.1016/j.ejor.2017.10.036 · Cited by 427
Metadata
- Authors
- Mansouri, S. A., Aktas, E., & Besikci, U.
- Venue
- European Journal of Operational Research
- Publisher
- Elsevier BV
- Published
- 2016-02
- Volume
- 248
- Issue
- 3
- Pages
- 772-788
- ISSN
- 0377-2217 (ISSN-L)
- OpenAlex
- W1416338368
- Cited by
- 289
- References
- 25
- FWCI
- 31.63
- Type
- journal article
- Language
- en
- Open access
- hybrid
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.