The DOI matches its Crossref record; 68 of the 68 references it cites were found in a registry or an index.
Electric bus planning & scheduling: A review of related problems and methodologies
Open accessAbstract
Electrification of bus fleets in most cities is expected to rise due to its significant environmental benefits. However, electric buses have limited driving range and long recharging times. Additionally, electric buses require special charging infrastructure, which overall makes them less flexible than conventional diesel buses. Due to the limitations of the electric bus technologies, further adjustments have to be made to the current bus transport planning problems. The scheduling of electric vehicles is recognized as a fast-growing area of research. In this paper, we review 43 articles related to the electric bus technologies and give an overview of the different problems in the electric bus planning process (strategic, tactical and operational). The different problems are: 1) investment of electric bus fleet and charging infrastructure, 2) placement of charging infrastructure, 3) the electric vehicle scheduling problem (E-VSP) and 4) the charging scheduling problem. Given a set of timetabled trips and recharging stations, the E-VSP is concerned with finding a vehicle schedule that covers the trips and satisfies the driving range and recharging requirements of electric buses while minimizing operational cost. A detailed literature review of the constraints associated with the E-VSP and the solution approaches proposed to solve it is given. Rescheduling aspects or considerations of robustness for scheduling of electric vehicles is identified as a future area of research. Furthermore, integrated electric bus planning is considered as a crucial area of research and integrated approaches could further improve the efficiency of electric bus transport systems.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
(1979) · Cited by 43,841
Bocquier, P. (2005) · Demographic Research · doi:10.4054/demres.2005.12.9 · Cited by 1,746
Complexity of vehicle routing and scheduling problems
Lenstra, J. K., & Kan, A. H. G. R. (1981) · Networks · doi:10.1002/net.3230110211 · Cited by 1,325
Selected Topics in Column Generation
Lübbecke, M. E., & Desrosiers, J. (2005) · Operations Research · doi:10.1287/opre.1050.0234 · Cited by 1,102
Routing and scheduling of vehicles and crews
Raff, S. (1983) · Computers & Operations Research · doi:10.1016/0305-0548(83)90030-8 · Cited by 867
Planning, operation, and control of bus transport systems: A literature review
Ibarra-Rojas, O. J., Delgado, F., Giesen, R., & Muñoz, J. C. (2015) · Transportation Research Part B: Methodological · doi:10.1016/j.trb.2015.03.002 · Cited by 727
Time Constrained Routing and Scheduling
Desrosiers, J., Solomon, M. M., Soumis, F., & Dumas, Y. (1992) · PolyPublie (École Polytechnique de Montréal) · doi:10.1016/s0927-0507%2805%2980106-9 · Cited by 709
The Paris Agreement: a new beginning?
Savaresi, A. (2016) · Journal of Energy & Natural Resources Law · doi:10.1080/02646811.2016.1133983 · Cited by 658
Electric bus fleet size and mix problem with optimization of charging infrastructure
Rogge, M., van der Hurk, E., Larsen, A., & Sauer, D. U. (2018) · Applied Energy · doi:10.1016/j.apenergy.2017.11.051 · Cited by 386
Chapter 2 Time constrained routing and scheduling
Desrosiers, J., Dumas, Y., Solomon, M. M., & Soumis, F. (1995) · Handbooks in Operations Research and Management Science · doi:10.1016/s0927-0507(05)80106-9 · Cited by 374
An overview on vehicle scheduling models
Bunte, S., & Kliewer, N. (2009) · Public Transport · doi:10.1007/s12469-010-0018-5 · Cited by 351
A Column Generation Approach to the Urban Transit Crew Scheduling Problem
Desrochers, M., & Soumis, F. (1989) · Transportation Science · doi:10.1287/trsc.23.1.1 · Cited by 332
Line planning in public transportation: models and methods
Schöbel, A. (2011) · OR Spectrum · doi:10.1007/s00291-011-0251-6 · Cited by 323
Locating charging infrastructure for electric buses in Stockholm
Xylia, M., Leduc, S., Patrizio, P., Kraxner, F., & Silveira, S. (2017) · Transportation Research Part C: Emerging Technologies · doi:10.1016/j.trc.2017.03.005 · Cited by 314
Kunith, A., Mendelevitch, R., & Goehlich, D. (2017) · International Journal of Sustainable Transportation · doi:10.1080/15568318.2017.1310962 · Cited by 286
Optimal charging scheduling and management for a fast-charging battery electric bus system
He, Y. F., Liu, Z., & Song, Z. (2020) · Transportation Research Part E Logistics and Transportation Review · doi:10.1016/j.tre.2020.102056 · Cited by 261
He, Y., Song, Z., & Liu, Z. (2019) · Sustainable Cities and Society · doi:10.1016/j.scs.2019.101530 · Cited by 237
An adaptive large neighborhood search heuristic for the Electric Vehicle Scheduling Problem
Wen, M., Linde, E., Ropke, S., Mirchandani, P., & Larsen, A. (2016) · Computers & Operations Research · doi:10.1016/j.cor.2016.06.013 · Cited by 236
Robust planning of dynamic wireless charging infrastructure for battery electric buses
Liu, Z., & Song, Z. (2017) · Transportation Research Part C Emerging Technologies · doi:10.1016/j.trc.2017.07.013 · Cited by 228
Robust scheduling strategies of electric buses under stochastic traffic conditions
Tang, X., Lin, X., & He, F. (2019) · Transportation Research Part C Emerging Technologies · doi:10.1016/j.trc.2019.05.032 · Cited by 228
Transit Bus Scheduling with Limited Energy
Li, J.-Q. (2014) · Transportation Science · doi:10.1287/trsc.2013.0468 · Cited by 224
Optimization of electric vehicle scheduling with multiple vehicle types in public transport
Yao, E., Liu, T., Lu, T., & Yang, Y. (2020) · Sustainable Cities and Society · doi:10.1016/j.scs.2019.101862 · Cited by 224
Battery-electric transit bus developments and operations: A review
Li, J.-Q. (2016) · International Journal of Sustainable Transportation · doi:10.1080/15568318.2013.872737 · Cited by 221
A Column Generation Approach to the Multiple-Depot Vehicle Scheduling Problem
Ribeiro, C. C., & Soumis, F. (1994) · Operations Research · doi:10.1287/opre.42.1.41 · Cited by 216
The electric bus fleet transition problem
Pelletier, S., Jabali, O., Mendoza, J. E., & Laporte, G. (2019) · Transportation Research Part C: Emerging Technologies · doi:10.1016/j.trc.2019.10.012 · Cited by 207
A cost-competitiveness analysis of charging infrastructure for electric bus operations
Chen, Z., Yin, Y., & Song, Z. (2018) · Transportation Research Part C: Emerging Technologies · doi:10.1016/j.trc.2018.06.006 · Cited by 205
Desaulniers, G., & Hickman, M. D. (2007) · Handbooks in Operations Research and Management Science · doi:10.1016/s0927-0507(06)14002-5 · Cited by 197
A branch and bound algorithm for the multiple depot vehicle scheduling problem
Carpaneto, G., Dell’Amico, M., Fischetti, M., & Toth, P. (1989) · Networks · doi:10.1002/net.3230190505 · Cited by 197
Models and Algorithms for Integration of Vehicle and Crew Scheduling
Freling, R., Huisman, D., & Wagelmans, A. P. M. (2003) · Journal of Scheduling · doi:10.1023/a:1022287504028 · Cited by 190
Mixed bus fleet scheduling under range and refueling constraints
Li, L., Lo, H. K., & Xiao, F. (2019) · Transportation Research Part C Emerging Technologies · doi:10.1016/j.trc.2019.05.009 · Cited by 172
An iterative approach to robust and integrated aircraft routing and crew scheduling
Weide, O., Ryan, D. M., & Ehrgott, M. (2009) · Computers & Operations Research · doi:10.1016/j.cor.2009.03.024 · Cited by 167
Steinzen, I., Gintner, V., Suhl, L. M., & Kliewer, N. (2010) · Transportation Science · doi:10.1287/trsc.1090.0304 · Cited by 167
Battery-electric transit vehicle scheduling with optimal number of stationary chargers
Liu, T., & Ceder, A. A. (2020) · Transportation Research Part C Emerging Technologies · doi:10.1016/j.trc.2020.02.009 · Cited by 165
A comparison of five heuristics for the multiple depot vehicle scheduling problem
Pepin, A.-S., Desaulniers, G., Hertz, A., & Huisman, D. (2008) · Journal of Scheduling · doi:10.1007/s10951-008-0072-x · Cited by 160
A survey on robustness in railway planning
Lusby, R. M., Larsen, J., & Bull, S. H. (2017) · European Journal of Operational Research · doi:10.1016/j.ejor.2017.07.044 · Cited by 157
Self-citationWang, J., Kang, L., & Liu, Y. (2020) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2020.109978 · Cited by 142
Abdelwahed, A., van den Berg, P. L., Brandt, T., Collins, J. E., & Ketter, W. (2020) · Transportation Science · doi:10.1287/trsc.2020.0982 · Cited by 141
Zhu, C., & Xiaohong, C. (2013) · Procedia - Social and Behavioral Sciences · doi:10.1016/j.sbspro.2013.08.306 · Cited by 137
Vehicle Scheduling in Public Transit and Lagrangean Pricing
Löbel, A. (1998) · Management Science · doi:10.1287/mnsc.44.12.1637 · Cited by 135
Niekerk, M. E. V. K., van den Akker, M., & Hoogeveen, J. A. (2017) · Public Transport · doi:10.1007/s12469-017-0164-0 · Cited by 132
Rinaldi, M., Picarelli, E., D’Ariano, A., & Viti, F. (2019) · Omega · doi:10.1016/j.omega.2019.05.006 · Cited by 124
Battery-swapping facility planning for electric buses with local charging systems
An, K., Jing, W., & Kim, I. (2019) · International Journal of Sustainable Transportation · doi:10.1080/15568318.2019.1573939 · Cited by 117
Computer-aided Systems in Public Transport
Hickman, M. D., Voß, S., & Mirchandani, P. B. (2008) · Lecture notes in economics and mathematical systems · doi:10.1007/978-3-540-73312-6 · Cited by 115
Zhou, G.-J., Xie, D., Zhao, X., & Lu, C. (2020) · IEEE Access · doi:10.1109/access.2020.2964391 · Cited by 115
When to go electric? A parallel bus fleet replacement study
Islam, A., & Lownes, N. (2019) · Transportation Research Part D Transport and Environment · doi:10.1016/j.trd.2019.05.007 · Cited by 110
Electric bus scheduling under single depot dynamic wireless charging infrastructure planning
Alwesabi, Y., Wang, Y., Avalos, R., & Liu, Z. (2020) · Energy · doi:10.1016/j.energy.2020.118855 · Cited by 108
Computer-Aided Transit Scheduling
Daduna, J. R., Branco, I., & Paixão, J. M. P. (1995) · Lecture notes in economics and mathematical systems · doi:10.1007/978-3-642-57762-8 · Cited by 106
Solving large multiple-depot multiple-vehicle-type bus scheduling problems in practice
Gintner, V., Kliewer, N., & Suhl, L. M. (2005) · OR Spectrum · doi:10.1007/s00291-005-0207-9 · Cited by 102
Optimal Charging Schedule Planning and Economic Analysis for Electric Bus Charging Stations
Leou, R., & Hung, J.-J. (2017) · Energies · doi:10.3390/en10040483 · Cited by 101
Integrated transit route network design and infrastructure planning for on-line electric vehicles
Iliopoulou, C. A., & Kepaptsoglou, K. L. (2019) · Transportation Research Part D Transport and Environment · doi:10.1016/j.trd.2019.10.016 · Cited by 101
Optimal Scheduling to Manage an Electric Bus Fleet Overnight Charging
Houbbadi, A., Trigui, R., Pélissier, S., Redondo-Iglesias, E., & Bouton, T. (2019) · Energies · doi:10.3390/en12142727 · Cited by 100
The Vehicle Scheduling Problem for Fleets with Alternative-Fuel Vehicles
Adler, J. D., & Mirchandani, P. B. (2016) · Transportation Science · doi:10.1287/trsc.2015.0615 · Cited by 96
On Charging Scheduling Optimization for a Wirelessly Charged Electric Bus System
Yang, C., Lou, W., Yao, J., & Xie, S. (2017) · IEEE Transactions on Intelligent Transportation Systems · doi:10.1109/tits.2017.2740329 · Cited by 96
Solution approaches for integrated vehicle and crew scheduling with electric buses
Perumal, S. S. G. R., Dollevoet, T., Huisman, D., Lusby, R. M., Larsen, J., & Riis, M. (2021) · Computers & Operations Research · doi:10.1016/j.cor.2021.105268 · Cited by 93
Self-citationWang, H., & Shen, J. (2007) · Applied Mathematics and Computation · doi:10.1016/j.amc.2007.02.141 · Cited by 90
Integrated Approach to Vehicle Scheduling and Bus Timetabling for an Electric Bus Line
Teng, J., Chen, T., & Fan, W. D. (2019) · Journal of Transportation Engineering Part A Systems · doi:10.1061/jtepbs.0000306 · Cited by 88
A matheuristic for transfer synchronization through integrated timetabling and vehicle scheduling
Fonseca, J. F. P., van der Hurk, E., Roberti, R., & Larsen, A. (2018) · Transportation Research Part B Methodological · doi:10.1016/j.trb.2018.01.012 · Cited by 86
Charging Schedule for Load Peak Minimization on Large-Scale Electric Bus Depots
Jahic, A., Eskander, M., & Schulz, D. (2019) · Applied Sciences · doi:10.3390/app9091748 · Cited by 86
An exact algorithm for multiple depot bus scheduling
Forbes, M. A., Holt, J. N., & Watts, A. M. (1994) · European Journal of Operational Research · doi:10.1016/0377-2217(94)90334-4 · Cited by 84
Spatio-Temporal Electric Bus Charging Optimization With Transit Network Constraints
Bagherinezhad, A., Palomino, A. D., Li, B., & Parvania, M. (2020) · IEEE Transactions on Industry Applications · doi:10.1109/tia.2020.2979132 · Cited by 75
Adjustments of public transit operations planning process for the use of electric buses
Häll, C. H., Ceder, A. A., Ekström, J., & Quttineh, N. (2018) · Journal of Intelligent Transportation Systems · doi:10.1080/15472450.2018.1488131 · Cited by 73
Exact approach to the electric bus fleet scheduling
Janovec, M., & Koháni, M. (2019) · Transportation research procedia · doi:10.1016/j.trpro.2019.07.191 · Cited by 72
Ke, B., Lin, Y., Chen, H., & Fang, S.-C. (2020) · Sustainable Energy Technologies and Assessments · doi:10.1016/j.seta.2020.100741 · Cited by 62
Li, X., Wang, T., Li, L., Feng, F., Wang, W., & Cheng, C. (2020) · Journal of Advanced Transportation · doi:10.1155/2020/8863905 · Cited by 56
Olsen, N., Kliewer, N., & Wolbeck, L. (2020) · Central European Journal of Operations Research · doi:10.1007/s10100-020-00705-6 · Cited by 54
Review of real-time vehicle schedule recovery methods in transportation services
Visentini, M. S., Borenstein, D., Li, J., & Mirchandani, P. B. (2013) · Journal of Scheduling · doi:10.1007/s10951-013-0339-8 · Cited by 52
Electric Bus Scheduling and Optimal Charging
Messaoudi, B., & Oulamara, A. (2019) · Lecture notes in computer science · doi:10.1007/978-3-030-31140-7_15 · Cited by 25
A matheuristic for the driver scheduling problem with staff cars
Perumal, S. S. G. R., Larsen, J., Lusby, R. M., Riis, M., & Sørensen, K. S. (2018) · European Journal of Operational Research · doi:10.1016/j.ejor.2018.11.011 · Cited by 16
Self-citation
Cited by
Electric bus fleet scheduling under travel time and energy consumption uncertainty
Avishan, F., Yanıkoğlu, İ., & Alwesabi, Y. (2023) · Transportation Research Part C: Emerging Technologies · doi:10.1016/j.trc.2023.104357 · Cited by 45
Metadata
- Authors
- Perumal, S. S. G., Lusby, R. M., & Larsen, J.
- Venue
- European Journal of Operational Research
- Publisher
- Elsevier BV
- Published
- 2022-09
- Volume
- 301
- Issue
- 2
- Pages
- 395-413
- ISSN
- 0377-2217 (ISSN-L)
- OpenAlex
- W3210892103
- Cited by
- 276
- References
- 68
- FWCI
- 9.36
- Type
- journal article
- Language
- en
- Open access
- hybrid
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.